early eighties when the number of projects, their magnitudes and allocated budget<br />

was much smaller. The number of the projects have been increased manifold as the<br />

ongoing projects during the financial year 2002-2003 are 233 and allocated budget<br />

is plus Rs. 1.5 billion. In addition, the maintenance load over the last 20 years has<br />

also increased due to completion of more projects. This department needs,<br />

therefore, reorganization and reinforcement by inducting sufficient number of<br />

qualified engineers in order to increase its efficiency.<br />

Training facilities are rarely available both for engineers as well as for the staff<br />

engaged for the maintenance and operation of vital installations. The installations<br />

of energy sector built wroth million of rupees are run at almost zero budget at the<br />

mercy of raw hand operators engaged on casual basis at Rs. 2,000 per month. This<br />

situation results in fast deterioration of valuable machinery and equipments. As a<br />

result, we have to face the reduction in efficiency and antiquation of valuable<br />

equipments before the estimated useful economic life. Therefore, training facilities<br />

both for the engineers and other staff responsible for operation of vital installations<br />

is highly essential beside provision of adequate funds for carrying out the<br />

maintenance of such assets as per laid down engineering principles.<br />

NAPWD is principally responsible to prepare the project feasibility and documents<br />

like PC-1 of all development projects. Currently this department does not have any<br />

economist, social scientist, and geologist in its existing set-up. Economic, financial,<br />

and environmental impact studies in addition to geological studies are mandatory<br />

in project preparation. Inducting qualified personnel in the above said fields can<br />

enhance the efficiency of the department.<br />

The staff being engaged for maintenance and operation of vital installations of<br />

energy sector on casual basis needs to be discouraged and instead staff with basic<br />

qualification in the relevant field be engaged on permanent basis at appropriate<br />

level of salaries, so that they may work with full satisfaction, responsibility and<br />

efficiency.<br />

30<br />

It appears to be useless to invest more and more on creating new assets ignoring the<br />

maintenance requirements of already built assets. It will therefore to appropriate to<br />

provide adequate funds for maintenance and upkeep of the vital installations of<br />

energy sector already built so as to increase both efficiency and life.<br />

5.3. Introduce New Financial and<br />

Cost Recovery Mechanisms<br />

Currently, the responsibilities of power generation, transmission, distribution, and<br />

billing rest with the Executive Engineers, Water & Power Divisions of NAPWD<br />

(One such division is located in each district). In its existing state, the system is<br />

quite vulnerable to theft, pilferage, and undue connections. The billing system<br />

against sale of energy needs to be reviewed. Realizing this fact, a case has been<br />

taken up by the NAPWD with the local administration to create an independent set<br />

up exclusively for billing and recovery against sale of electricity in NA. An<br />

Executive Engineer assisted by two Assistant Executive Engineers in each district<br />

with full autonomy to perform the function independently should head the new set<br />

up. This arrangement, if materialized based on cost recovery mechanism, will