28.12.2014 Views

Energy - IUCN

Energy - IUCN

Energy - IUCN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Region Power Power Proposed Projects Power Proposed Projects for<br />

Available Shortfall Demand Implementation<br />

by 2016<br />

Skardu 6.120 9.611 a. Skardu Ph-III<br />

(1.0) 41.128 a. Harpo (23.0)<br />

b. Basho Ph-II (22.0) b. Skardu-III (12)<br />

c. Shigar Ph-III (1.0)<br />

Shayok 4.000 4.075 a. Balagond (1.0) 18.284 a. Balghar (2.0)<br />

Rondu/<br />

b. Gowari (1.0) b. Thagus (0.5)<br />

Haramosh 2.220 0.318 a. Haramosh (0.5) 2.545 Harpo-II (23.0)<br />

Kharmang 1.880 4.108 a. Sermik (2.0) 16.840 To be connected to<br />

Skarduwhen Basho and<br />

Harpo are completed<br />

b. Mehdiabad (1.0)<br />

Khunjerab 0.611 a. KDFord (1.5)<br />

Ghizar 1.600 2.114 Phander-II (80.0)<br />

Gultari -- 1.000 a. Karabosh, 5.572 To be extended to<br />

Fultux Nero&<br />

entire Ghizar<br />

Thand connected<br />

with Astore for<br />

balance (2.969)<br />

3. Hydro Power Projects in order of Priority for<br />

Implementation<br />

52<br />

S. Project location Status Capacity<br />

No.<br />

(MW)<br />

SHORT TERM PLAN<br />

1. Naltar-V Gilgit Approved 18.0<br />

2. Naltar-III Gilgit Feasibility likely to be completed by Dec 2000. 22.0<br />

3. Basho-II Skardu Feasibility likely to be completed by Jun 2001 23.0<br />

4. Mehdiabad Sermik Skardu Feasibility completed 1.0<br />

5. Thore (Chilas) Diamir Feasibility completed 3.0<br />

6. Darmandar Ghizar Feasibility completed 1.5<br />

7. Thaley Ghanche Feasibility completed 2.0<br />

LONG TERM PLAN<br />

1. Sai Juglote Gilgit Feasibility completed 10.5<br />

2. Nomal Gilgit Feasibility completed 3.0<br />

3. Harpo (Rondu) Skardu Feasibility likely to be completed by Jun 2001 24.0<br />

4. Kachura-IV Skardu Feasibility completed 2.8<br />

5. Multipurpose Sadpara Feasibility likely to be completed 10.0<br />

Dam Project Skardu within two years<br />

6. Doyan (Astore) Diamir Feasibility likely to be completed 425.0<br />

within two years<br />

7. Phander Ghizar Feasibility likely to be completed 87.0<br />

within two years<br />

8. Ghawari Ghanche Feasibility completed and PC-I approved. 3.0<br />

Total 635.8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!