Energy - IUCN
Energy - IUCN
Energy - IUCN
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ANNEX I:<br />
HYDEL POWER GENERATION<br />
1. State of Hydel Power Generation<br />
Region Location of Installed Capacity Year of<br />
Hydel Station (kW) Commissioning<br />
1. Chilas Chilas Ph-I 160 1978<br />
Chilas Ph-II (Thack) 2,000 1997<br />
Bunner (Chilas) 1,000 1998<br />
Tore (Chilas) 100 1985<br />
Tangir Ph-I 160 1982<br />
Tangir Ph-II 1,200 1995<br />
Darel Ph-I 200 1984<br />
Darel Ph-II 1,000 1993<br />
Total 5,820<br />
2. Astore Astore Ph-I&II 250 1984<br />
Lous (Astore) 1,000 1986<br />
Parishing (Astore) 160 1986<br />
Rattu (Astore) 160 1987<br />
Gorikote (Astore) 200 1986<br />
Darley (Astore) 200 1993<br />
Harcho (Astore) 400 1994<br />
Gudai (Astore) 640 1994<br />
Total 3,010<br />
3. Gilgit Kargah Phase-I 320 1965/1987<br />
Kargah Phase-Ii 450 1977<br />
Kargah Phase-Iii 640 1989<br />
Kargah Phase-Iv 640 1989<br />
Kargah Phase-V-A 200 1983<br />
Kargah Phase-V-B 1,200 1993<br />
Kargah Phase-Vi 4,000 1994<br />
Kargah Phase-Vii 1,000 1990<br />
Juglote Phase-I 120 1977<br />
Juglote Phase-Ii 1,000 1997<br />
Nomal 120 1980<br />
Naltar 80 1965<br />
Danyore 320 1987<br />
Jalalabad 1,000 1993<br />
Total 11,090<br />
4. Hunza Chalt Phase-I (Nagar) 40 1966<br />
Chalt Phase-Ii (Nagar) 1,000 1997<br />
Budalus (Nagar) 600 1987<br />
49