fEATURE<br />

Ministry of Coal and representative of state and Central<br />

governments may be organised every three months.<br />

Forming a monitoring sub-committee in this regard at the<br />

ministry level may be considered.<br />

♦♦<br />

Joint venture companies formed by the joint allocattees are<br />

required to submit a compliance status of Coal Block and<br />

associated EUPs of individual allocates to CCO by fifth of<br />

the next month after every quarter. Block allocattees were<br />

advised to submit the progress reports and renewed BG to<br />

CCO without any lapse.<br />

♦♦<br />

All the allocatees were advised that BG should be<br />

submitted by the JVC in case of jointly allocated coal<br />

blocks. Individual submission of BGs will not be accepted.<br />

From the reported progress, it is seen that production<br />

from a few coal blocks will be started in the year 2011-2012<br />

or the near future as per the indicated schedule. It is the<br />

recommendation of the Committee that the allocatees of these<br />

coal blocks be advised to start mining or coal production in<br />

2011-12 or as per the indicated schedule of production failing<br />

which appropriate action will be initiated.<br />

The progress of the following blocks was not found to be<br />

satisfactory but it is seen that these blocks were delayed due<br />

to ‘Go/No Go’ categorisation, location in wildlife corridors,<br />

allocation to PFC for UMPPs and overlapping of coal bearing<br />

Blocks which have started production and<br />

attained peak rated capacity<br />

Sl No Name of coal blocks Allotment year Name of allocate/JV<br />

1 Talabira-I 1994 Indal/Hindalco<br />

2 Tata (East) 1996 WBSEB/BECML<br />

3 Tara (West) 1996 WBPDCL/BECML<br />

4&5 Gotitoria (E&W) 1996 BLA Industries<br />

6 Gare Palma IV/1 1996 JSPL<br />

7 Gare Palma IV/5 1996 Monnet Ispat<br />

8 Panchwara Central 2001 PSEB<br />

9 Chotia 2003 Prakash Industries<br />

Blocks which have started production but not<br />

attained peak rated capacity<br />

Sl No Name of coal block Allotment year Name of allocattee/JV<br />

1 Sarshatali 1993 CESC/ICML<br />

2-3 Gare Palma IV/2&3 1998 Jindal Power<br />

4 Gare Palma IV/4 1999 Jayaswal Neco<br />

5 Namchik Namphuk 2003 Arunachal PMDCL<br />

6-11 Baranj I-IV, Kiloni and 2003 KPCL<br />

Manora Deep<br />

12 Gare Palma IV/7 2000 RASL now SEML<br />

13 Barjore 2003 WBPDCL/BECML<br />

14 Kathautia 2003 Usha Martin<br />

15 Tasra 1996 SAIL (IISCO)<br />

16 Barjora North 2005 DVC<br />

17 Belgaon 2005 Sunflag Iron & Steel<br />

18 Parbatpur Central 2005 Electro Steel Casting<br />

19 Marki Mangli-I 2004 B S Ispat<br />

20 Marki Mangli-III 2005 Shree Virangana Steel<br />

area with CBM/Aerotropolis project. Committee expressed<br />

concern over unsatisfactory progress and advised the<br />

allocattees whose blocks were held up due to location in No-<br />

Go area to pursue their forest diversion proposals since Go/<br />

No-Go concept has been done away with. The Committee has<br />

also advised the other allocattees to pursue their cases with the<br />

concerned authorities and get the requisite forest clearances<br />

expedited.<br />

Captive blocks nearing coal production stage<br />

Sl No<br />

Name of coal<br />

block<br />

Allocation date/<br />

target date of<br />

production<br />

Name of allocattee<br />

1<br />

Trans Damodar<br />

(govt. dispensation)<br />

14.1.05/Mar 2009 WBMDTC (Govt PSU)<br />

2 Khagra Joydev 3.3.05/Mar 2008 DVC (Govt PSU)<br />

3 Sial Ghogri<br />

22.5.07 (revised to<br />

22.8.07)/ Feb 2012<br />

Prism Cement (private)<br />

4-5<br />

Marko Mangli-II &<br />

Marki Mangli-IV<br />

6.9.05/Mar 2009<br />

6 Utkal-C 29.5.98/Nov 2001<br />

7-8<br />

Parsa (East) &<br />

Kanta Basan<br />

25.6.07/Sept 2012<br />

19.5.07/Sept 2012<br />

9 Panchwara North 26.4.05/May 2011 WBPDCL<br />

10<br />

11<br />

Durgapur II/<br />

Taraimar<br />

Gare Palma<br />

Sector-III<br />

6.11.07/Normative<br />

date re-fixed on<br />

May 2012<br />

12.11.08/May 2012<br />

12 Fatehpur East 23.1.08/Oct 2013<br />

13 Ganeshpur 28.5.09/Nov 2013<br />

14-15<br />

Sahapur (East) &<br />

Sahapur (West)<br />

25.7.07/April 2014<br />

16 Bicharpur 25.7.07/April 2014<br />

17<br />

Marki Zari Jamani<br />

Adkoli<br />

2.8.06/June 2013<br />

18 Andal East 3.7.09/April 2015<br />

Topworth Urja & Metals<br />

Ltd (formally Shree<br />

Virangana Steel)<br />

Utkal Coal Ltd (formally<br />

ICCL)<br />

Rajasthan Rajya Vidyut<br />

Utpadan Ltd<br />

Balco<br />

Goa Industrial<br />

Development Corp<br />

JLD Yavatmal Energy,<br />

RKM Powergen Ltd,<br />

Vandana Vidyut,<br />

Visa Power, Green<br />

Infrastructure<br />

Tata Steel & Adhunik<br />

Thermal Energy<br />

NMDC<br />

Madhya Pradesh State<br />

Mining Corp. Ltd<br />

MSMCL<br />

The progress of 58 blocks* was not found to be satisfactory.<br />

The Committee expressed concern over unsatisfactory<br />

progress and advised to expedite the development of the coal<br />

blocks and be cautioned to be careful in future with respect<br />

to the milestones stipulated. If they do not improve the<br />

performance on the speedy development of the block further,<br />

action including deduction of BG or deallocation would be<br />

considered.<br />

*The complete list of 58 captive blocks is given overleaf.<br />

Bhusan Steel, Jai Balaji<br />

Industries Ltd, Rashmi<br />

Cements<br />

COAL INSIGHTS 34 March 2012