Key Performance<br />

Areas (KPA)<br />

BCMM Objectives Specific Objectives Key Performance<br />

Indicators (KPI)<br />

Percentage reduction in<br />

unaccounted for electricity<br />

losses<br />

Number of unplanned<br />

electricity interruptions<br />

(exceeding 24 hours)<br />

Kilometers of roads &<br />

associated services<br />

gravelled<br />

Kilometers of roads<br />

surfaced<br />

Kilometers of existing<br />

roads & associated<br />

services maintained and<br />

rehabilitated<br />

Development of the<br />

BCMM Roads Masterplan<br />

Number of Bridge rehabilitated<br />

Kilometers of roads<br />

resurfaced<br />

Portfolio of Evidence<br />

required<br />

Reports and Analysis<br />

of data extracted from<br />

Eskom purchases and<br />

VENUS sales data.<br />

Consolidated spreadsheet<br />

data maintained<br />

by the Chief Revenue<br />

Protection Specialist<br />

Baseline Target 12/13<br />

12.57% as at end<br />

March 2012<br />

12% keep the losses within this<br />

bracket up or down 2 %<br />

Electricity logs plus per quarter Not to exceed 1 per quarter<br />

Road Production<br />

schedules.<br />

50 kms 50 kms of existing roads gravelled<br />

or regravelled.<br />

Production Schedules. 10 kms 15 kms<br />

Production Schedules. 550 kms 600 kms<br />

Master Plan prepared<br />

and adopted as evidenced<br />

by the minute<br />

of Council<br />

I bridge rehabilitated<br />

as evidenced by<br />

contract completion<br />

certificate<br />

Records of work done<br />

and recorded complaints<br />

attended to.<br />

Payment Certificates,<br />

Requisitions.<br />

No Master Plan established.<br />

Master Plan prepared and adopted<br />

as evidenced by the minute<br />

of Council<br />

1 (Westbank) I bridge rehabilitated as evidenced<br />

by contract completion<br />

certificate<br />

10 km 12km<br />

BUFFALO CITY METROPOLITAN MUNICIPALITY<br />

306 INTEGRATED DEVELOPMENT PLAN REVIEW 2012/13