quality control procedures for the production
quality control procedures for the production
quality control procedures for the production
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• By overnight courier:<br />
Sample envelopes extracted each day AND<br />
Copies of consignment notes <strong>for</strong> shipments despatched that day<br />
are to be despatched daily, in <strong>the</strong> one package<br />
• By fax, to <strong>the</strong> above address by 10am each morning:<br />
The daily <strong>production</strong> sheet <strong>for</strong> <strong>the</strong> previous day’s <strong>production</strong>.<br />
This <strong>production</strong> sheet must list <strong>the</strong> total units produced during <strong>the</strong><br />
previous day’s shifts.<br />
AEC <strong>quality</strong> <strong>control</strong> data to be <strong>for</strong>warded to Central Office<br />
• Copies of on-site Quality Control sheets and any Head Office sign offs are<br />
to faxed to <strong>the</strong> above Central Office number by 10am <strong>the</strong> next day.<br />
Material held by printer<br />
• All repro material must be held by <strong>the</strong> printer until <strong>the</strong> task is finalised. On<br />
completion of <strong>the</strong> task <strong>the</strong> AEC will advise <strong>the</strong> contractor whe<strong>the</strong>r to<br />
destroy such material or return it to <strong>the</strong> AEC.<br />
Verification checks to be undertaken by AEC<br />
ON-SITE<br />
AT CO<br />
For stock already produced only: a random sample of 1 per<br />
50,000 envelopes is to be extracted by AEC Queensland HO<br />
staff and despatched to <strong>the</strong> above Central Office address.<br />
Sample envelopes are received as specified and adhere to<br />
specifications regarding:<br />
Tint colour of <strong>the</strong> base stock<br />
Colour and layout of <strong>the</strong> text in relation to <strong>the</strong> folded up<br />
position meets specifications<br />
Die cutting shape of base stock<br />
Folding up meets specifications<br />
Glue lines are solid in construction ( no holes evident)<br />
‘D’ (sealing) tape position and length: within XXcm of side<br />
flaps of envelope, at least YYcm from base of envelope.<br />
Size of envelope meets specifications and matches original<br />
samples provided.<br />
Production sheets are received as specified and indicate<br />
<strong>production</strong> is to agreed schedules.<br />
Consignment notes are completed and received as specified and<br />
adhere to agreed shipping schedules.<br />
The attached Quality Control Sheets- Declaration Envelopes are<br />
to be completed and signed by AEC staff engaged in <strong>quality</strong><br />
<strong>control</strong> on this product.