28.12.2014 Views

quality control procedures for the production

quality control procedures for the production

quality control procedures for the production

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RESPONSIBILITIES<br />

Primary responsibility <strong>for</strong> ensuring <strong>the</strong> <strong>quality</strong> <strong>control</strong> of voting material produced <strong>for</strong><br />

<strong>the</strong> Constitutional Convention election rests with <strong>the</strong> materials <strong>production</strong>, insertion<br />

and distribution contractors engaged by <strong>the</strong> AEC. Complementary <strong>quality</strong> <strong>control</strong><br />

<strong>procedures</strong> are implemented by <strong>the</strong> AEC to verify that printing, insertion and<br />

distribution is meeting <strong>the</strong> AEC-specified standards. Responsibilities <strong>for</strong> <strong>the</strong>se<br />

<strong>procedures</strong> rest with:<br />

PRODUCT PROCESS SAMPLING BY QUALITY CHECK<br />

BY LOCATION<br />

Inner<br />

Envelopes<br />

Manufacture/<br />

Print<br />

Contractor/<br />

AEC (despatch)<br />

AEC CO staff<br />

AEC HO staff<br />

AEC CO<br />

On-site<br />

Outer Manufacture/ Contractor AEC CO staff AEC CO<br />

Envelopes Print<br />

Declaration Manufacture/ Contractor* AEC CO staff AEC CO<br />

Envelopes Print (All<br />

states)<br />

Print elector<br />

details (WA,<br />

SA, NT only)<br />

AEC AEC HO staff On-site<br />

Dec<br />

Envelope<br />

Address<br />

Labels<br />

(NSW, VIC,<br />

QLD, TAS,<br />

ACT only)<br />

Ballot<br />

Papers<br />

Candidate<br />

Booklets<br />

Automated<br />

Insertion<br />

Manual<br />

Insertion<br />

Print/Trim AEC AEC HO staff -<br />

Salmat sites -<br />

NSW, Vic ,Qld<br />

WA<br />

Affix to Dec<br />

Envelopes<br />

Print - sign off/<br />

<strong>production</strong><br />

Folding<br />

Print - sign off<br />

print <strong>for</strong> each<br />

set of plates<br />

Print -<br />

<strong>production</strong><br />

AEC<br />

AEC# or<br />

Contractor<br />

AEC# or<br />

Contractor<br />

AEC nominated<br />

staff<br />

AEC HO staff/<br />

CO staff<br />

AEC HO staff/<br />

CO staff<br />

AEC HO staff/<br />

CO staff<br />

On-site<br />

On-site<br />

On-site/AEC<br />

CO<br />

On-site/AEC<br />

CO<br />

On-site<br />

Contractor AEC CO staff AEC CO<br />

Folding Contractor AEC HO<br />

staff/CO staff<br />

Insertion of AEC<br />

AEC nominated<br />

material<br />

staff<br />

Print details AEC AEC nominated<br />

staff<br />

Sort <strong>for</strong> AP AEC AEC nominated<br />

staff<br />

Insertion & readdress<br />

AEC<br />

AEC divisional<br />

staff<br />

details<br />

On-site/AEC<br />

CO<br />

On-site<br />

On-site<br />

On-site<br />

Divisions<br />

* Envelopes already produced to be sampled by AEC Queensland HO staff.<br />

# AEC extraction only where resources permit full time <strong>production</strong> monitoring

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!