28.12.2014 Views

quality control procedures for the production

quality control procedures for the production

quality control procedures for the production

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• quantity of outer envelopes/plastic wraps correctly filled, by<br />

Division<br />

• quantity of insertion spoils that require a new personalised<br />

declaration envelope, by Division<br />

• quantity of re-insertions <strong>for</strong> spoils requiring a new personalised<br />

declaration envelope, by Division<br />

• <strong>the</strong> quantity lodged with Australia Post, by Division <strong>for</strong> <strong>the</strong><br />

previous day’s shifts.<br />

:<br />

• Copies of consignment notes <strong>for</strong> shipments despatched that day.<br />

AEC <strong>quality</strong> <strong>control</strong> data to be <strong>for</strong>warded to Central Office<br />

• Copies of on-site Quality Control sheets and any Head Office sign offs are<br />

to faxed to <strong>the</strong> above Central Office number by 10am <strong>the</strong> next day.<br />

Verification checks to be undertaken by AEC<br />

ON-SITE<br />

Pre-insertion check <strong>for</strong> each Division that insertion line hoppers<br />

are correctly filled. Post insertion check of roll extract sample to<br />

verify completeness and correctness of material inserted;<br />

correctness of elector details; and visibility of elector details<br />

through envelope window. Check that replacement <strong>procedures</strong> <strong>for</strong><br />

insertion spoils are being followed. The attached On-Site Quality<br />

Control Sheets must be completed <strong>for</strong> each day a <strong>production</strong> site<br />

is visited.<br />

AT STATE Material has been received at <strong>the</strong> insertion site<br />

HO Production sheets <strong>for</strong> <strong>the</strong> State’s insertions are received as<br />

specified and indicate insertion is to agreed schedules.<br />

Australia Post acceptance signoffs received as specified and<br />

adhere to agreed posting schedules<br />

The attached HO Quality Control sheets must be completed<br />

AT CO<br />

Production sheets are received as specified and indicate<br />

insertion and lodgment with Australia Post is to agreed<br />

schedules.<br />

Australia Post acceptance signoffs received as specified and<br />

adhere to agreed posting schedules.<br />

Quantity of material delivered to Australia Post corresponds to<br />

Divisional enrolment (net of Antarctic, silent electors).<br />

The attached CO Quality Control sheet must be completed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!