<strong>Avocet</strong> <strong>Mining</strong> <strong>PLC</strong><br />

West African Projects<br />

RPA notes that the resource model is truncated at depth and recommends that <strong>Avocet</strong><br />

<strong>Mining</strong> continue to investigate the potential of the Inata deposits at depth.<br />

To improve the production capacity RPA recommends that Inata focus on keeping the most<br />

productive loaders fully utilized; review and improve truck dispatch; consider the<br />

implementation of a computerized truck dispatch system; relay daily production information<br />

to the supervisors and operators in a simple and up to date manner so that they know the<br />

target and how they did; and, review daily operations and consider ways to reduce lost time<br />

at shift change and other potential inefficiencies. In addition further review and action to<br />

improve mining equipment mechanical availability is recommended.<br />

It is recommended that a slope monitoring system be installed at the Inata North and<br />

Central Pits to monitor slope movements and provide early warning of any potential failure.<br />

Consideration should be given to drilling specific geotechnical boreholes and performing<br />

additional field and laboratory tests to confirm rock material properties<br />

Report No: R253.<strong>2011</strong> 313<br />