<strong>Metro</strong> Agenda Item<br />
Operations Committee<br />
June 19, 2012<br />
From: Raymond A. Friem, Chief Operating Officer - <strong>Transit</strong><br />
Subject: Capital Projects Update – Engineering and New Systems Development<br />
Disposition: Information/Presentation<br />
Presentation: Christopher C. Poehler, P. E. Senior Vice President, Engineering & New Systems<br />
Development<br />
OBJECTIVES:<br />
To inform the Operations Committee of the current status of key Operations projects scheduled<br />
for completion in FY2013.<br />
BACKGROUND:<br />
Engineering & New Systems Development (E&NSD) is currently managing or assisting in the<br />
execution of approximately 35 projects throughout the bus and rail systems facilities. Most of<br />
these projects require close coordination with various departments throughout the Operations<br />
organization to ensure success.<br />
ANALYSIS:<br />
Following are updates of three key projects that will be completed in FY 2013.<br />
New Freedom Bus Stops<br />
• Scope – Upgrade approximately 200 existing bus stops to make them accessible under<br />
Federal ADA guidelines. There are 125 stops in St. Louis City across 19 Aldermanic Wards<br />
and 75 stops in St. Louis County. This is the third project of this kind. The previous two<br />
projects upgraded a total of 165 stops throughout the system.<br />
• Budget – Overall Project budget is approximately $1,000,000.<br />
• Schedule – Construction contract will advertise soon. Construction is expected to begin in<br />
late summer and be completed before the end of the calendar year.<br />
Scott <strong>Transit</strong> Plaza<br />
• Scope – In conjunction with the City of St. Louis reconstruction of the grand Bridge, <strong>Metro</strong><br />
is reconstructing the Grand <strong>Metro</strong>Link station and associated transit plaza. Scope includes<br />
the removal of elevators from the platform to the north side of Scott Avenue, construction of<br />
an aesthetically pleasing, well lit plaza area beneath the bridge, including an art installation<br />
and a new 60 spot parking lot.<br />
• Budget – The total project budget is $7.3 million. Current forecasts show the project will be<br />
completed within budget.<br />
• Schedule – Project is somewhat dependent on completion of the bridge, but the current<br />
schedule shows completion in early August.