28.0 CONTRACTOR FURNISHED ITEMS AND SERVICES<br />

28.1 GENERAL: Except For those items or services specifically stated to be government<br />

furnished in this Section, the contractor shall furnish everything required to perform this PWS.<br />

28.2 QUALITY STANDARDS: The contractor shall perform all tasks so that once<br />

accomplished, the st<strong>and</strong>ards stated in Section C are at an "Acceptable Quality Level" (AQL). The<br />

Contractor will be responsible for correcting all deficiencies.<br />

28.3 EQUIPMENT: The contractor shall furnish all equipment, materials, <strong>and</strong> tools necessary<br />

to properly perform the work defined in this contract. All equipment shall have bumpers <strong>and</strong><br />

guards to prevent marking or scratching of fixtures, furnishings, or building surfaces.<br />

28.4 ELECTRICAL EQUIPMENT: All electrical equipment used by the contractor shall be<br />

UL approved. This equipment must operate using existing building electrical circuits. It shall be<br />

the responsibility of the contractor to prevent the operation or attempted operation of electrical<br />

equipment or combinations of equipment, which require power exceeding the capacity of existing<br />

building electrical circuits.<br />

28.5 SUPPLIES: The contractor shall furnish all necessary compounds, solvents, barrier<br />

paper, tape, paper products, <strong>and</strong> brushes within the appropriate specifications. Only approved<br />

federal specification chemicals, cleaning compounds <strong>and</strong> solvents will be used. All chemicals,<br />

cleaning compounds <strong>and</strong> solvents shall be stenciled as to content <strong>and</strong> specification. Samples of<br />

materials along with the appropriate MSDS's shall be submitted to the COTR/CO for approval<br />

prior to the commencement of the contract start date <strong>and</strong> whenever a change occurs. When a<br />

change occurs, the new material will meet or exceed the quality of previously used items.<br />

28.6 STORAGE: The contractor shall furnish <strong>and</strong> store all expendable material <strong>and</strong> loose<br />

equipment within designated areas. The government will not be responsible for security of<br />

storage areas. Any loss or damage to contractor equipment <strong>and</strong> supplies, are solely the<br />

responsibility of the contractor. Suitable containers for storing acids, flammable, etc. with<br />

supplemental MSDS's shall be provided by the contractor.<br />

28.7 MATERIAL SAFETY: The contractor shall submit a schedule of contractor furnished<br />

supplies not later than fifteen (15) days after contract award. The schedule shall include name,<br />

chemical content, <strong>and</strong> purpose of all supplies to the used The contractor shall also submit<br />

Hazardous Material Identification in the form of Material Safety Data Sheets (MSDS) that will<br />

meet the requirement of 29 CFR 1910.1200(g) <strong>and</strong> the latest version of Federal St<strong>and</strong>ard No. 313.<br />

The submittal will also include a Material Safety Data Log, which shall be maintained on site <strong>and</strong><br />

available for review upon request of the COTR.<br />

28.8 SPECIAL REQUIREMENTS: The contractor shall furnish protective clothing, gloves,<br />

boots, Personnel Protective Equipment, <strong>and</strong> chemical goggles for employees required under<br />

OSHA.<br />

29.0 SUBMITTALS<br />

12