<strong>TRACON</strong> 1 st floor (142 X 99)<br />

<strong>TRACON</strong> 2 nd floor (81 X 113)<br />

Observation Gallery Rm. 301 (157 X 9)<br />

Administrative Wing Mechanical Penthouse (56 X 52)<br />

Cafeteria Mechanical Penthouse (33 X 50)<br />

Exterior Plaza (105 X 54 <strong>and</strong> 34 X 38)<br />

Front Entrance (11 X 56)<br />

Loading Dock (39 X 36)<br />

Guard Building (12 X 20)<br />

14,058-sq. ft.<br />

9,153-sq. ft.<br />

1,413-sq. ft.<br />

2,912-sq. ft.<br />

1,650-sq. ft.<br />

6,962-sq. ft.<br />

616-sq. ft.<br />

1,404-sq. ft.<br />

240-sq.ft.<br />

2.2 <strong>TRACON</strong> EQUIPMENT AND SYSTEMS: Equipment <strong>and</strong> systems may include but are<br />

not limited to the following equipment. Specific maintenance requirements are listed in<br />

Technical Exhibits.<br />

Automated Entry Gate to Include In-pavement Sensors <strong>and</strong> the Mechanical Aspects of<br />

the Motor Driven Gate<br />

Elevator Equipment <strong>and</strong> Systems (Passenger / Freight elevator)<br />

Fire Alarm System, Sprinkler System (not to include h<strong>and</strong> held portable fire<br />

extinguishers)<br />

Kitchen Equipment<br />

Parking lot lighting<br />

Sanitary Sewage System <strong>and</strong> Cafe Passive Grease Trap<br />

Storm Drainage System<br />

Water Treatment for Boiler, Chiller, Cooling Towers<br />

2.3 <strong>ATCT</strong>/<strong>BB</strong>:<br />

<strong>ATCT</strong> (Approximately 11,740 square feet)<br />

Shaft Occupied/or Equipment Space<br />

(Includes elevator <strong>and</strong> stairs)<br />

Stairwell<br />

Sub-junction Mechanical<br />

Sub-junction Equipment/Elevator etc.<br />

Junction Cab<br />

Balconies<br />

Junction Admin.<br />

Penthouse<br />

Mechanical<br />

Cable Access<br />

2,916-sq. ft<br />

2,503-sq. ft.<br />

266-sq. ft<br />

1,248-sp. Ft.<br />

850-sq. ft.<br />

534-sq. ft.<br />

1,464-sq. ft.<br />

338-sq. ft.<br />

276-sq. ft.<br />

1,319-sq.ft.<br />

BASE BUILDING (Approximately 21.052 square feet)<br />

First Floor:<br />

Engine Generator area<br />

Boiler room<br />

Mechanical/Chiller<br />

CCMS<br />

Room 111/Fiber Optic<br />

Uninterrupted Power Service<br />

430-sq. ft<br />

480-sq. ft<br />

1,620-sq. ft<br />

72-sq.ft<br />

831-sq. ft<br />

257-sq.ft