<strong>and</strong> free of scale deposits in the cooling towers, pipes, pumps <strong>and</strong> chiller tubes. The<br />
contractor shall perform bi-weekly tests on the condenser water system <strong>and</strong> log the<br />
results of said tests.<br />
b. The contractor shall be responsible for maintenance of the Heating <strong>and</strong> Chilled water<br />
'closed loop' system. This system shall be checked quarterly for proper chemical<br />
balance <strong>and</strong> the results provided to the COTR. Closed Loop system will be maintained<br />
to the degree to prevent scale or other buildup from degrading the performance of<br />
boilers <strong>and</strong> chillers.<br />
MONTHLY<br />
Ml. Exterior Lighting<br />
a. Check exterior lights for operation - replace as needed.<br />
b. Ensure timer <strong>and</strong> photocell are operating <strong>and</strong> set correctly, repair/replace as needed,<br />
IAW operation manual.<br />
M2. Faucets/General Plumbing<br />
a. Inspect all faucets for proper operation - adjust or replace as needed.<br />
b. Adjust faucet h<strong>and</strong>les for proper alignment.<br />
c. Inspect flush valves - adjust or repair as needed.<br />
M3. Roof <strong>and</strong> Caulking<br />
a. Inspect roof for tears in membrane, even distribution of ballast, proper roof <strong>and</strong> gutter<br />
drainage, exterior caulking in need of repair, <strong>and</strong> security of flashing <strong>and</strong> roof<br />
components; repair as necessary.<br />
M4. Elevator at Base Building (tasks to be completed bv ThyssenKrupp with maintenance<br />
contractor overview')<br />
a. HoJide^escott ;asiiie;h&~