30.12.2014 Views

evidentiary appendix in support of plaintiffs' partial motion for ...

evidentiary appendix in support of plaintiffs' partial motion for ...

evidentiary appendix in support of plaintiffs' partial motion for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2020, the airl<strong>in</strong>es may f<strong>in</strong>d it necessary to reroute between<br />

five and n<strong>in</strong>e million enplanements annually out <strong>of</strong> Chicago<br />

due to <strong>in</strong>sufficient capacity. However, as <strong>in</strong> Scenario 1,<br />

these unserved connect<strong>in</strong>g passengers would be re-routed<br />

through other exist<strong>in</strong>g airports rather than through a poorly<br />

located and <strong>in</strong>conveniently located. 258<br />

Exam<strong>in</strong>e the three alternative scenarios. With even one or two runways O’Hare would<br />

not have the capacity to meet the region’s needs. Further note that Chicago would consider a<br />

new airport.<br />

To preserve the potential long-range need to serve additional<br />

unconstra<strong>in</strong>ed region demand, the City would consider a Midway<br />

replacement facility, if necessary, <strong>in</strong> an accessible, operationally<br />

and f<strong>in</strong>ancially viable location.<br />

***<br />

This option provides the basis to remove from consideration the<br />

construction <strong>of</strong> Peotone, which, if constructed, would dra<strong>in</strong><br />

<strong>in</strong>frastructure <strong>in</strong>vestment funds from Chicago projects. 259<br />

3. March 27, 1995. Jeff Thomas writes a second paper called “Chicago Aviation At a<br />

Critical Juncture” — says demand will exceed O’Hare exist<strong>in</strong>g runway capacity <strong>in</strong><br />

2003-2004 time frame “without new runway construction”; says the current<br />

constra<strong>in</strong><strong>in</strong>g elements on O’Hare growth are runway and access road capacity.<br />

On March 27, 1995, Jeff Thomas wrote another paper called “Chicago Aviation At a<br />

Critical Juncture” stat<strong>in</strong>g:<br />

Pend<strong>in</strong>g near-term decisions concern<strong>in</strong>g the future governance<br />

structure and future configuration <strong>of</strong> the Region's commercial<br />

airport system will largely determ<strong>in</strong>e the long-term role Chicago<br />

will play <strong>in</strong> the rapidly evolv<strong>in</strong>g global air transportation system.<br />

***<br />

Viewed 30 years hence, actions taken today will likely be seen as a<br />

watershed po<strong>in</strong>t hav<strong>in</strong>g one <strong>of</strong> two dist<strong>in</strong>ctly different end<br />

outcomes:<br />

• Chicago's civic leaders can select a course which cont<strong>in</strong>ues to<br />

leverage to the fullest extent possible our 50-year position as<br />

the pre-em<strong>in</strong>ent mid-cont<strong>in</strong>ent U.S. air transportation superhub.<br />

By aggressively improv<strong>in</strong>g O'Hare's airfield system<br />

and Midway's term<strong>in</strong>al facilities today, Chicago can<br />

258 Id. (emphasis added).<br />

259 Exhibit C 155.<br />

115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!