Us<strong>in</strong>g the short-list <strong>of</strong> airport component alternatives, a series <strong>of</strong><br />

<strong>in</strong>tegrated airport facility concepts will be developed. 114<br />

On July 12, 1991, Chicago advertised a Request <strong>for</strong> Proposal (RFQ) <strong>for</strong> the Landside and<br />

Term<strong>in</strong>al components <strong>of</strong> the Master Plan Update (ALP Update). The RFQ described the<br />

elements <strong>of</strong> the orig<strong>in</strong>al Master Plan and O’Hare Development Program (ODP-I) and asked <strong>for</strong> a<br />

consultant proposal to prepare a twenty-year development program.<br />

In 1982, the O’Hare Master Plan was adopted and was<br />

implemented as the O’Hare Development Program or ODP. The<br />

master plan provided a schedule <strong>for</strong> airport expansion <strong>for</strong> the<br />

period from 1982-1995. Ground was broken on the first project <strong>in</strong><br />

August 1982. As <strong>of</strong> December 1989 the ODP was 90% complete<br />

<strong>for</strong> design and 85% <strong>for</strong> construction. 115<br />

***<br />

Chicago’s Request For Proposal (RFQ) directed the bidd<strong>in</strong>g contractor to:<br />

Prepare a development program that identifies all capital<br />

improvement projects expected to occur with<strong>in</strong> the 20-year<br />

plann<strong>in</strong>g time frame. The development program should be<br />

divided <strong>in</strong>to three development phases: 1995-2000, 2000-2005,<br />

2005-2015. 116<br />

H. The Chronological Development <strong>of</strong> the Master Plan Update (a/k/a ALP Update).<br />

The best way to understand the development <strong>of</strong> the Master Plan Update (a/k/a ALP<br />

Update) is to exam<strong>in</strong>e that development <strong>in</strong> chronological sequence:<br />

1. 1991 Work on the Master Plan Update (a/k/a ALP Update).<br />

While several important steps were taken toward <strong>in</strong>itiation <strong>of</strong> the Master Plan Update <strong>in</strong><br />

1991, an actual start <strong>of</strong> the O’Hare Master Plan did not beg<strong>in</strong> <strong>for</strong> a number <strong>of</strong> reasons, <strong>in</strong>clud<strong>in</strong>g<br />

the fact that much <strong>of</strong> the Department <strong>of</strong> Aviation’s and Landrum & Brown’s resources were<br />

focused on Lake Calumet.<br />

114 Exhibit C 49 (emphasis added).<br />

115 Exhibit C 37 (emphasis added).<br />

116 Id. (emphasis added).<br />