TOWN OF GEORGINA, SUTTON SECONDARY PLAN REVIEW STUDY BACKGROUND REPORT 3.2 SUTTON DISTRICT HIGH SCHOOL WORKSHOP (November 23, 2007) The Sutton District High School workshop took place in the High School Library over the course <strong>of</strong> the afternoon. The workshop concentrated on identifying what the student participants considered key attributes and opportunities for change in Sutton and what they envisioned for the community in the future. The responses varied from small scale to large scale concerns and also included specific references to features in Sutton. The following is a brief summary <strong>of</strong> the general responses: • Opportunities and Change - maintain and enhance vegetation and environmental systems, better recycling systems, cleaner river with greater public access, provision for better long term employment, more frequent public transit, a central park, shopping and gathering amenities for youth (“area to hang out with friends, have c<strong>of</strong>fee, movie theatre, etc.”), more recreational opportunities and activities (youth centre), medical centre needed, heritage preservation; • Attributes - historical landmarks, small town scale, provincial parks, Sutton Fair, Red Barn Theatre, Lake Simcoe and its shoreline, low density housing, recreational facilities, close to nature, quiet and clean; • Opportunities and Change - maintain and enhance vegetation and environmental systems, better recycling systems, cleaner river with greater public access, provision for better long term employment, more frequent public transit, a central park, shopping and gathering amenities for youth (“area to hang out with friends, have c<strong>of</strong>fee, movie theatre, etc.”), more recreational opportunities and activities (youth centre), medical centre needed, heritage preservation; The general concern expressed by the participants was about Sutton becoming overdeveloped, that overdevelopment may lead to higher crime, the “disrespectful out-<strong>of</strong>-towners”, pollution <strong>of</strong> Lake Simcoe and the “lack <strong>of</strong> motivational spirit in the <strong>Town</strong>.” The final portion <strong>of</strong> the workshop involved the students conceptually locating some <strong>of</strong> the features they had previously mentioned on aerial plans <strong>of</strong> the study area. Though time was restricted, some <strong>of</strong> the students developed a rough concept for a central park <strong>of</strong>f Dalton Road connecting it to Black River, High Street and to the community opposite the river. The conceptual sketch is included in Appendix F. This exercise gave the students a chance to express the opportunities and changes in plan as discussed earlier in the workshop, and allowed them to understand the possible spatial change that could take place in the Study Area over time. Of particular interest, is that the broad concerns and conceptual designs <strong>of</strong> the student participants were similar to those expressed at the August 2007 workshop. The Planning Partnership • LGL Limited • Poulos & Chung • SCS Consulting • Cushman & Wakefield LePage | July 2008 14
TOWN OF GEORGINA, SUTTON SECONDARY PLAN REVIEW STUDY BACKGROUND REPORT - DRAFT APPENDIX A SUTTON DEVELOPMENT AREAS & APPLICATIONS The Planning Partnership • LGL Limited • Poulos & Chung • SCS Consulting • Cushman & Wakefield LePage | July 2008
- Page 1 and 2: SUTTON SECONDARY PLAN REVIEW STUDY
- Page 3 and 4: 1.0 INTRODUCTION 1.1 Purpose TOWN O
- Page 5 and 6: TOWN OF GEORGINA, SUTTON SECONDARY
- Page 7 and 8: TOWN OF GEORGINA, SUTTON SECONDARY
- Page 9 and 10: TOWN OF GEORGINA, SUTTON SECONDARY
- Page 11 and 12: TOWN OF GEORGINA, SUTTON SECONDARY
- Page 13 and 14: TOWN OF GEORGINA, SUTTON SECONDARY
- Page 15: TOWN OF GEORGINA, SUTTON SECONDARY
- Page 19 and 20: TOWN OF GEORGINA, SUTTON SECONDARY
- Page 21 and 22: TOWN OF GEORGINA, SUTTON SECONDARY
- Page 23 and 24: SUTTON SECONDARY PLAN REVIEW STUDY
- Page 25 and 26: Sutton Secondary Plan Review Study
- Page 27 and 28: Sutton Secondary Plan Review Study
- Page 29 and 30: Sutton Secondary Plan Review Study
- Page 31 and 32: Sutton Secondary Plan Review Study
- Page 33 and 34: Sutton Secondary Plan Review Study
- Page 35 and 36: Sutton Secondary Plan Review Study
- Page 37 and 38: LEGEND Townline Shoal Study Area Wa
- Page 39 and 40: Sutton Secondary Plan Review Study
- Page 41 and 42: LEGEND Lake Simcoe Study Boundary S
- Page 43 and 44: Sutton Secondary Plan Review Study
- Page 49: ATTACHMENT A Sutton Water and Sewag
- Page 58: ATTACHMENT C Servicing Drawings 17
- Page 66:
ATTACHMENT E Excerpts from the “B
- Page 72 and 73:
Memo To: The Planning Partnership M
- Page 74 and 75:
Memo undertake other daily trip pur
- Page 76 and 77:
TOWN OF GEORGINA, SUTTON SECONDARY
- Page 78 and 79:
SUTTON SECONDARY PLAN EMPLOYMENT AN
- Page 80 and 81:
SUTTON SECONDARY PLAN EMPLOYMENT AN
- Page 82 and 83:
TOWN OF GEORGINA, SUTTON SECONDARY
- Page 84 and 85:
TOWN OF GEORGINA, SUTTON SECONDARY
- Page 86 and 87:
TOWN OF GEORGINA, SUTTON SECONDARY
- Page 88 and 89:
TOWN OF GEORGINA, SUTTON SECONDARY
- Page 90 and 91:
TOWN OF GEORGINA, SUTTON SECONDARY
- Page 92 and 93:
TOWN OF GEORGINA, SUTTON SECONDARY
- Page 94 and 95:
TOWN OF GEORGINA, SUTTON SECONDARY
- Page 96:
TOWN OF GEORGINA, SUTTON SECONDARY