Electrostatic precipitator replacement<br />

“<strong>Mammoet</strong> USA<br />

suggested replacing<br />

each ESP as<br />

a complete unit”<br />

Power<br />

LOCATION: FLAMANVILLE, FRANCE<br />

JOB: LIFTING AND ASSEMBLING<br />

A TUNNEL BORING MACHINE<br />

CHALLENGE: A SMALL AND<br />

CROWDED SITE<br />

18 19<br />

Two Electrostatic Precipitators in a Crystel River Florida Power Plant were in need of<br />

replacement. Normally, the replacement of hundreds of ESP plates and other components<br />

would require a long shutdown. However, <strong>Mammoet</strong> USA suggested replacing<br />

each ESP as a complete unit and was commissioned to design the chamber assembly<br />

frames, transport the chambers on site and lift them into position.<br />

We used a PTC 35 DS with 80 meter main boom, 45 meter jib and 1,600 ton counterweight.<br />

The ESPs (8 x 13 x 17 meters, 400 tons) were transported on site using SPMTs.<br />

After that, it took only two hours to position the first unit, operating at a radius of 89<br />

meters. That was quite a challenge as the ESP had only 15 millimeters clearance and the<br />

boom only had 600 millimeters clearance.<br />

“Tunnel boring<br />

machine<br />

components<br />

lowered down<br />

the shaft”<br />

LOCATION: CRYSTAL RIVER,<br />

FLORIDA, USA<br />

JOB: LIFTING ESP CHAMBERS<br />

IN POSITION<br />

CHALLENGE: RESTRICTED<br />

CLEARANCE<br />

Power station in France A new plant in Russia<br />

The new nuclear power station at<br />

Flamanville will have cooling water tunnels<br />

leading to the sea. <strong>Mammoet</strong> France lowered<br />

the components of the tunnel boring<br />

machine down the access shaft with a CC<br />

2400 SSL crane and assisted with the<br />

assembly of the unit. The heaviest component<br />

weighed 163 tons. We had to<br />

operate on a small and crowded site,<br />

which made the work quite difficult, but<br />

managed to keep to the schedule. Our<br />

new LTM 11200 and SPMTs were used to<br />

install a gantry crane in the powerhouse.<br />

Each of the two gantry beams weighed<br />

180 tons and was 52 meters long.<br />

<strong>Mammoet</strong> Seumersteel was awarded the<br />

contract to supply a CC 2600 and two<br />

LTM 1250s for the construction of a new<br />

plant at one of the oldest power stations<br />

in the Moscow region. The work was quite<br />

different from our normal operations<br />

in Russia. Good preparation and close<br />

cooperation with the customer ensured<br />

that the lifts were completed safely and<br />

efficiently.<br />

LOCATION: SHATURA, MOSCOW<br />

REGION, RUSSIA<br />

JOB: HEAVY LIFTS<br />

CHALLENGE: LIFT WITH THREE<br />

CRANES