12.01.2015 Views

In-Basket Design: Developing and Implementing an On-Line ... - IPAC

In-Basket Design: Developing and Implementing an On-Line ... - IPAC

In-Basket Design: Developing and Implementing an On-Line ... - IPAC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Step 8: Prepare for Administration<br />

• <strong>On</strong>-line administration<br />

• Program the in-basket for on-line administration<br />

• Allow enough time–PRAD’s contractor requires 8 weeks<br />

• Conduct User Accept<strong>an</strong>ce Testing (UAT)<br />

• Preliminary review<br />

• Contractor’s Quality Assur<strong>an</strong>ce (QA) team<br />

• PRAD test developers<br />

• Live review<br />

• Conducted by PRAD one week before testing<br />

• Paper-<strong><strong>an</strong>d</strong>-pencil administration<br />

• Prepare Directions for Conducting (DFC)<br />

• Prepare master copy for reproduction or printing<br />

<strong>IPAC</strong> Annual Conference 2011<br />

39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!