Step 8: Prepare for Administration<br />
• <strong>On</strong>-line administration<br />
• Program the in-basket for on-line administration<br />
• Allow enough time–PRAD’s contractor requires 8 weeks<br />
• Conduct User Accept<strong>an</strong>ce Testing (UAT)<br />
• Preliminary review<br />
• Contractor’s Quality Assur<strong>an</strong>ce (QA) team<br />
• PRAD test developers<br />
• Live review<br />
• Conducted by PRAD one week before testing<br />
• Paper-<strong><strong>an</strong>d</strong>-pencil administration<br />
• Prepare Directions for Conducting (DFC)<br />
• Prepare master copy for reproduction or printing<br />