CHAPTER 6<br />

EMERGENCY PREPAREDNESS<br />

NPPs are provided with adequate safety features<br />

to guard against the possibility of any accident. Further, the<br />

safety features such as a containment building around each<br />

NPP helps in mitigating the consequences, should an event<br />

occur. In the extremely rare event of a nuclear accident, it<br />

might become necessary to take certain mitigating measures<br />

in the public domain. This requires a high degree of<br />

preparedness. Site-specific emergency preparedness plans<br />

are t<strong>here</strong>fore drawn up and maintained at all stations for<br />

plant emergencies, site emergencies and off-site emergencies.<br />

To test these plans, periodic emergency exercises are carried<br />

out involving the station authorities, district administration,<br />

and the members of public. Plant Emergency Exercises<br />

(PEE) are carried out once in a quarter, Site Emergency<br />

Exercise (SEE) once in a year and Off-Site Emergency<br />

Exercise (OSEE) once in 2 years.<br />

During the year 2006, emergency exercises were<br />

carried out as given in Table 6.1. The response of the plant<br />

personnel, officials and public involved in the exercise and<br />

general level of the awareness amongst the public were<br />

satisfactory.<br />

The plant and site emergency preparedness and<br />

response plan for KGS - 3&4 and revised off-site emergency<br />

preparedness and response plan for Rawatbhata DAE<br />

Center were reviewed in detail.<br />

Table 6.1: Number of Emergency Exercises (2006)<br />

PLANT PEE SEE OSEE<br />

TAPS-1&2 4 1 -<br />

RAPS-1&2 4 1 -<br />

MAPS-1&2 4 1 -<br />

NAPS-1&2 4 1 -<br />

KAPS-1&2 4 1 1<br />

KGS-1&2 4 1 -<br />

RAPS-3&4 4 1 1<br />

TAPS-3&4 4 1 -<br />

Periodic SEE and OSEE were carried out at<br />

hydrogen sulphide based HWPs at Manuguru and Kota.<br />

SEEs are carried out once in 6 months and OSEEs once in<br />

2 years.<br />

Periodic emergency exercises are carried out at<br />

ammonia based HWPs at Baroda, Thal, Hazira, Tuticorin<br />

and Talcher. PEEs are carried out once in a quarter and fire<br />

drills once in 2 months.<br />

44