3 Environmental performance<br />

BASED on LCA<br />

3.1 Background<br />

This EPD ® is based on a LCA on <strong>Vattenfall</strong>’s hydropower in the Nordic countries during the<br />

reference year 2007. The declared unit is 1 kWh net electricity generated and thereafter distributed<br />

to a customer connected to the 70/130 kV network. Resource consumption, emissions,<br />

and waste amounts in conjunction with construction, operation and reinvestments of<br />

power stations and dams have been inventoried. Decommissioning is excluded because of<br />

the improbability of that scenario. The reinvestment rate has been set at a level that provides<br />

for complete replacement of the power station during its lifetime, i.e. a fully functioning<br />

power station will exit the system at the end of the assumed lifetime. This results in greater<br />

environmental impact in the LCI than the alternative of including decommissioning. The level<br />

of uncertainty in the description of the impact on biotopes is reduced, because we avoid<br />

speculative assessments of how possible/desirable a return to unregulated flows would be,<br />

and of the process of re-colonization from unaffected biotopes to affected ones.<br />

3.2 System Boundaries, Allocation and Data Sources<br />

3.2.1 System boundaries<br />

The figure below is a simplified process tree with system boundaries for the LCA for electricity<br />

generated in <strong>Vattenfall</strong>’s Nordic hydropower stations and distributed to the consumer.<br />

Production of<br />

construction<br />

materials<br />

Production of<br />

raw materials<br />

trp<br />

trp<br />

trp<br />

Construction<br />

of suppliers<br />

factories<br />

Construction<br />

and<br />

reinvestment in<br />

dams etc.<br />

Manufacturing<br />

of turbine and<br />

generator<br />

Manufacturing<br />

of other<br />

components<br />

Construction of<br />

power networks<br />

Upstream process<br />

Production of operation<br />

chemicals, oils and other<br />

auxiliaries for operation<br />

of hydropower plants<br />

CORE process<br />

Power plant<br />

Downstream process<br />

Losses in transmission/<br />

distribution systems and<br />

maintenance<br />

1 kWh el<br />

Decommissioning<br />

of<br />

suppliers<br />

factories<br />

Scrapped<br />

reinvested<br />

material<br />

Operational<br />

waste<br />

Decommissioning<br />

of power<br />

networks<br />

trp trp trp trp trp trp<br />

Waste to<br />

landfill<br />

Waste to<br />

recycling<br />

Waste to<br />

incineration<br />

Legend<br />

Core process<br />

Core process – infrastructure<br />

Upstream process<br />

Upstream process – infrastructure<br />

Downstream process<br />

Downstream process – infrastructure<br />

Not included in the analysis<br />

Simplified process tree with system boundaries for life cycle inventory of <strong>Vattenfall</strong>´s<br />

hydropower. Trp means transportation.<br />

© <strong>Vattenfall</strong> AB Generation Nordic 2008<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!