3 Environmental performance BASEd on LCA<br />

Small-scale hydropower stations are generally so called run-of-river stations, i.e. they<br />

have no reservoir. Small-scale hydropower is mainly located south of the river Dalälven<br />

in watercourses that have streaming water all year round, i.e. a reservoir is not required<br />

to maintain relatively constant generation. One of the selected power stations, Upperud,<br />

is a small-scale power station. The absence of reservoirs means that no emissions from<br />

inundated land occur. The net effect is considerably lower emissions of greenhouse gases<br />

and eutrophying substances than for a station with a reservoir. Environmental impact<br />

per kWh due to construction, reinvestment, and operation is consistently higher from<br />

the selected small-scale hydropower station than from average large-scale hydropower<br />

stations. Investment cost per MW and Ecoprofile go hand-in-hand.<br />

3.3.6 Differences vs. previous EPD ® s<br />

There are several differences between this EPD ® and previous EPD ® s for <strong>Vattenfall</strong>’s hydropower.<br />

In the table below a comparison between the results of this EPD ® and the EPD ® for<br />

<strong>Vattenfall</strong>’s hydropower, certified 2005 and the weighted results for the EPD ® s for the<br />

rivers Ume älv and Lule älv, certified 2000 and 2002, is shown. Distribution of electricity<br />

is included in this EPD ® but has been excluded here to make the values comparable with<br />

the earlier EPDs.<br />

Emissions of<br />

Unit<br />

<strong>Vattenfall</strong>´s<br />

Nordic hydropower<br />

2008<br />

(incl. distribution)<br />

<strong>Vattenfall</strong>´s<br />

Nordic hydropower<br />

2005<br />

(excl. distribution)<br />

Weighted results<br />

for EPD<br />

Ume älv 2000 and<br />

Lule älv 2002<br />

(excl. distribution)<br />

Greenhouse gases g CO 2 -q. 4,5 4,2 4,9<br />

Ozone-depleting<br />

gases<br />

Acidifying<br />

substances<br />

Gases contributing<br />

to the formation of<br />

ground-level ozone<br />

Eutrophying<br />

substances<br />

g CFC-11-q. 3,3 . 10 -8 3,8 . 10 -8 9,0 . 10 -9<br />

g SO 2 -eq. (Mol H + ) 4,6 . 10 -3 9,8 . 10 -3 (3,1 . 10 -4 ) 4,5 . 10 -3 (1,4 . 10 -4 )<br />

g ethene-eq. 8,4 . 10 -4 6,6 . 10 -4 4,7 . 10 -4<br />

g PO 4 3- -eq. (g O 2 ) 4,9 . 10 -2 4,6 . 10 -2 (2,1) 5,9 . 10 -2 (2,7)<br />

Oil to water g 2,5 . 10 -4 5,0 . 10 -5 5,0 . 10 -5<br />

Oil to water from<br />

core process alone<br />

g 4,1 . 10 -5 4,2 . 10 -5 4,2 . 10 -5<br />

The main contributions to the emission categories in the table above are cause in the construction<br />

phase of the hydropower stations. Operation causes small emissions. Used selected generic<br />

data for production of electricity, material, and fuels, have been updated between the EPD ® s.<br />

Newer data tend to have tend to have fewer data gaps resulting in a higher impact.<br />

Another trend is that newer data mirror newer processes that actually have a lower environmental<br />

impact, like for instance the copper industry, which considerably has reduced<br />

its sulphur emissions.<br />

Concerning emissions of oil to water in the Core process, the hydropower stations, a<br />

weak positive trend can be seen since 2005. Systematic environmental efforts have been<br />

made: improved supervision systems, investments in new technology containing smaller<br />

quantity of oils, installation of oil separation etc. The comparison with the weighted value<br />

from 2003 limps since that EPD ® only comprises the rivers Ume älv and Lule älv.<br />

Following comparison concerns the difference between the two latest EPD ® s: EPD ® for<br />

<strong>Vattenfall</strong>´s Nordic hydropower 2005 and the EPD ® in case. The latter EPD ® has been<br />

carried out according to a later PCR with changed regulations.<br />

© <strong>Vattenfall</strong> AB Generation Nordic 2008<br />

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!