17.01.2015 Views

Download - DVC :: Consumer Login

Download - DVC :: Consumer Login

Download - DVC :: Consumer Login

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a) L1 Bidder/s for each item will have to produce the documents (original/self<br />

authenticated and attested by Public Notary), as specified in the NIT, in support of the<br />

information furnished by him/them on-line, for verification by Tender Committee on<br />

any working day within 10 days in case of domestic tenders and 15 days in case of global<br />

tenders from the date of opening of Price bid. The L1 bidder/s will also submit an<br />

affidavit (original) on a non-judicial stamp paper of Rs.10 regarding genuineness of<br />

the information furnished by him/them online and authenticity of the documents<br />

being produced by him/them, within the same time frame. No additional time will be<br />

allowed to the bidder for producing the required documents.<br />

b) In case the L1 bidder for any item fails to produce the documents within the specified<br />

period of 10 days in case of domestic tenders and 15 days in case of global tenders, or if<br />

any of the information furnished by L1 bidder on-line is found to be false by the Tender<br />

Committee during verification of documents, which changes the eligibility status of the<br />

bidder, then EMD of the L1 bidder will be forfeited with caution letter to refrain in future<br />

and in event of 2 nd instances EMD will be forfeited and banning of L1 bidder for one<br />

year from participating in future tenders.<br />

10. QUALIFYING REQUIREMENTS:<br />

The qualifying requirements framed shall not be restrictive in nature and shall be widened to the<br />

extent possible and should be consistent and in consonance with quality requirements of goods/<br />

works and services to ensure maximum participation of the prospective bidders.<br />

The purpose of QR is to identify the qualified bidders who are capable of delivering<br />

goods/services as per the Specifications/Requirements. QR shall generally be drawn in such a<br />

manner so as to enable adequate participation of bidders to the extent possible. The QR shall<br />

normally include Technical Requirements (both specific to the package and general) and the<br />

Financial Requirements. Qualifying requirement for technical and financial parameters should be<br />

clearly spelt out.<br />

The qualifying requirement (QR) is to be prepared on case to case basis by QR committee at<br />

appropriate level, depending on various factors like cost of the package, Technical importance,<br />

Time frame for implementation, Quality plan requirements etc. The primary purpose of QR is to<br />

assess the Financial & Technical capability of the bidders who can deliver the goods/services as<br />

per the requirements. QR is required for those contracts, which are to be finalised through OTE.<br />

QR is not required for LTE amongst ALS / vendor with proven credential and for Single Tender<br />

Enquiry. However in case of poor vendor base (less than 4) QR may be considered for LT<br />

through wide publication in e-tendering portal .The vendor with proven credential in respect<br />

of both procurement and works contract is defined as below:<br />

A. For Procurement :-<br />

W& P Manual – 2012 Page 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!