Volume 9 Edition 2 2012 - The ASIA Miner
Volume 9 Edition 2 2012 - The ASIA Miner
Volume 9 Edition 2 2012 - The ASIA Miner
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Company Profile<br />
ONE <strong>ASIA</strong><br />
RESOURCES limited<br />
One Asia Resources Limited is focused<br />
on the exploration and development<br />
of the Awak Mas and<br />
Pani gold projects located on the Island<br />
of Sulawesi, Indonesia. One<br />
Asia is targeting to become a producer<br />
by the end of 2014 with<br />
combined annual production from<br />
Awak Mas and Pani of 200,000<br />
to 250,000 ounces of gold.<br />
<strong>The</strong> Awak Mas project is a multimillion<br />
ounce joint venture with<br />
Vista Gold Corp. whereby One<br />
Asia can earn 80% by completing<br />
a Definitive Feasibility Study (DFS)<br />
and Amdal (the equivalent to an<br />
Environment Impact Statement).<br />
<strong>The</strong> company expects to have this<br />
completed by late <strong>2012</strong>.<br />
<strong>The</strong> Awak Mas project is located<br />
in the Luwu Regency of<br />
South Sulawesi and is accessible<br />
from the Provincial city of Makassar<br />
via a 367 km paved highway<br />
to Palopo then a further 41 km on<br />
paved and gravel roads to site.<br />
<strong>The</strong> city of Makassar hosts an international<br />
airport with daily flights<br />
to Jakarta and Singapore.<br />
<strong>The</strong> Awak Mas project is held<br />
under a 7th generation Contract<br />
of Work (CoW), which allows for<br />
100% foreign ownership. <strong>The</strong><br />
project lies within a non-forested<br />
area and sits within land for other<br />
uses classification, which allows<br />
for mining.<br />
Awak Mas has a current JORC<br />
resource of 2.13m ounces of Au,<br />
of which 1.89m ounces Au is<br />
measured and indicated. Over<br />
100,000m of drilling has been<br />
completed to date on the project.<br />
<strong>The</strong> Company is currently completing<br />
a DFS on the Awak Mas project<br />
with a production profile of<br />
4mt pa on the Awak Mas deposit.<br />
<strong>The</strong> Awak Mas deposit has excellent<br />
metallurgical characteristics,<br />
testing indicates very high recovery<br />
rates 90%+.<br />
In addition, to the known deposit<br />
several other prospective areas<br />
have been identified. Current and<br />
ongoing exploration work to date<br />
has revealed 6 additional prospect<br />
areas outside the Awak Mas deposit<br />
area. <strong>The</strong> Salu Bulo prospect<br />
has returned significant drill intercepts<br />
including; 26m @2.87 g/t<br />
Au, 24m @ 2.46 g/t Au, 72m<br />
@1.95 g/t Au (incl. 30m @ 3.15<br />
g/t Au), 20m @ 3.32 g/t Au,<br />
12m @ 3.43 g/t Au and 30m @<br />
2.95 g/t Au. Additional drilling results<br />
received from November<br />
2011 include the following; 39m<br />
@ 1.85 g/t Au, 17m @ 2.8 g/t<br />
Au, 24m @ 1.86 g/t Au and 30m<br />
@ 1.44 g/t Au. Excellent upside<br />
potential exists for additional gold<br />
resources at increased grade from<br />
the Salu Bulo prospect area alone.<br />
Exploration work on this area is currently<br />
ongoing.<br />
One Asia is targeting to commence<br />
commercial production<br />
from the Awak Mas in 2014, at a<br />
gold production rate of 150,000<br />
to 175,000 ounces per annum.<br />
One Asia’s other gold project,<br />
the Pani Project in North Sulawesi,<br />
has over 500,000 ounces of<br />
oxide gold resource identified<br />
from previous work. One Asia has<br />
a 90% interest in a joint venture to<br />
develop the Pani gold property.<br />
<strong>The</strong> project is located in the North<br />
arm of Sulawesi and is approx.10<br />
km from the coast and is<br />
accessible via paved road<br />
and dirt road.<br />
<strong>The</strong> Pani project currently<br />
hosts an oxide resource of<br />
530,000 ounces Au in a<br />
450m x 200m drilled area,<br />
this zone remains open at<br />
depth and strike, excellent<br />
upside potential exists to increase<br />
this resource. One Asia is<br />
undertaking a drilling program to<br />
further define and increase the<br />
known resource of the deposit.<br />
Recently competed field work<br />
has confirmed that the current deposit<br />
continues at depth and strike.<br />
Trenching results on the eastern<br />
slope of the Pani ridge include<br />
24m @1.62 g/t Au and 44m @<br />
1.06 g/t Au. West Pani trenching<br />
results include 22m @ 1.50 g/t<br />
Au and 10m 2.26 g/t Au. South<br />
Pani trenching results include<br />
118m @0.98 g/t Au and 96m @<br />
0.90 g/t Au. Exploration work<br />
here is ongoing and the Company<br />
expects some promising drilling results<br />
later this year.<br />
<strong>The</strong> mineralization is entirely<br />
oxide and testing by BHP has indicated<br />
that +95% recoveries are<br />
possible using heap leach type<br />
processes.<br />
<strong>The</strong> company plans to develop<br />
the Pani deposit as an open pit<br />
heap leach operation and is targeting<br />
to place the Pani project<br />
into production in the next 2-3<br />
years at a production rate of<br />
50,000-75,000 ounces of gold<br />
per annum.<br />
One Asia is intending to undertaking<br />
a program to develop<br />
these projects into producing<br />
gold mines within the next 2 to 3<br />
years with an annual production<br />
of 200,000 to 250,000 ounces<br />
of gold per annum.