OCTOBER <strong>2000</strong><br />

MONTHLYPROGRESSREPORTS<br />

POL SITES<br />

MCBCAMPLEJEUNE<br />

JACKSONVILLE,NORTHCAROLINA<br />

Contract Nos.<br />

N62470-93-D-3032<br />

and<br />

N62470-97-D-5000<br />

Prepared for:<br />

Environmental Management Division<br />

MCB Camp Lejeune<br />

Jacksonville, North Carolina<br />

Prepared by:<br />

A member of THE IT GROUP<br />

11560 Great Oaks Way, Suite 500<br />

Alpharetta, GA 30022


MONTHLY PROGRESS REPORT - SHORT FORM<br />

Report Dates: October 1, <strong>2000</strong> to October 31, <strong>2000</strong><br />

Contract No.: N62470-97-D-5000<br />

T<br />

ra”k<br />

Order No.: 0011<br />

Pr-,ect No.: 920704<br />

Project Name: Building 1613 SVE / Air Sparge<br />

Project Location: MCB Camp Lejeune, NC<br />

Project Manager: James A. Dunn, Jr., P.E.<br />

Project<br />

Description:<br />

Installation of Air Sparge/SVE systems at Building 1613 to remediate<br />

petroleum contaminated soils and groundwater and operation and<br />

maintenance of the systems.<br />

Hard Copies Distributed to:<br />

COTR:<br />

Karen Wilson (757) 322-4817<br />

Wilsonke@efdlant.navfac.navv.mil<br />

RAC CM:<br />

(757) 396-5121<br />

Greg Hedley<br />

Hedlevos@efdlant.navfac.navy.mil ext. 383<br />

Project Controls Manager:<br />

Linda Barberousse<br />

Lbarberousse@theitaroup.com<br />

Contract Files<br />

Scheduled Web Site Postinn Date:<br />

November 22,200O<br />

ROICC: Brent Rowse<br />

RPM: Lori Reuther<br />

(757) 363-7190<br />

Original Contract Start Date:<br />

Original Contract Completion Date:<br />

Current Contract Completion Date:<br />

O&M Completion Date:<br />

Current Projected Completion Date:<br />

Ceiling:<br />

Total $ to Date:<br />

Remaining Funds:<br />

Estimated Report Period:<br />

Forecast @ Completion:<br />

Previous Period Forecas<br />

609,512.OO<br />

391,934.oo<br />

217578.00<br />

18,760.OO<br />

607,693.OO<br />

n ,al operation and maintenance of the system. During October <strong>2000</strong>, removed an estimated total of 103 Ibs. of hydrocarbons<br />

from the site. See attached detailed Operating Report. Received results of soils borings and re-sampled three points for analyses<br />

by MADEP parameters. Conducted groundwater sampling event and received analytical results. System expansion plans are<br />

No changes<br />

None<br />

Orig<br />

Remedial Action at Bldg. 1613, Camp<br />

Lejeune. 06122198 04/30/99 $307,128.00 $12,916.00 $320,044.00<br />

1 Continue O&M for additional 12 Months 05128199 08131 /OO $156,054.00 $8,254.00 $164,308.00<br />

2 Continue O&M 05/I 2/00 0513 1 /o I $146,330.00 $7,396.00 $153,726.00<br />

Totals 1 $609,512.00 1 $28,566.00 1 $638,078.00<br />

Approved by: Attachments: Performance Report<br />

Cost Performance Curve<br />

P<br />

Roland Moreau, P.E. Work Directive Log<br />

Program Manager Building 1613 Data


_. -. ).<br />

IT Corporation order 11 - 920704 PAGE NO. 1<br />

START DATE 01 MA<br />

FIN DATE OIJUNOI ’ DATADATE 03NOVOC<br />

Performance<br />

Report<br />

WBS<br />

Code<br />

Description<br />

Oll<br />

Bud<br />

Qnt<br />

ant<br />

Rev<br />

CW<br />

Ctnt<br />

Task<br />

Unit<br />

Ins<br />

Qnt<br />

Task orlg.<br />

% Budg<br />

Comp S<br />

b current Earned Adual ETC Forecast Variance Variance % PhYSl<br />

Rev./ Budg. $ s CPI At from from of %<br />

Adjust f ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />

ooooowo Proposal Prep<br />

la,<br />

0<br />

1w %<br />

100<br />

103<br />

0 0 0 0 5 0 00 0 5 5 5 0.0 0.0<br />

o5woooo Add Sparge 8 SVE Wells<br />

100<br />

0<br />

loo %<br />

0<br />

0<br />

17626 0 17628 0 0 0.00 35c.w L75lm 17172 17172 2.9 0.0<br />

10000000 O&MMANUAL&ASSUILT<br />

1w<br />

0<br />

10 %<br />

loo<br />

100<br />

7372 0 7372 7372 12643 1.72 0 12643 5271 5271 1.2 1.2<br />

<strong>2000</strong>0000 WORK PLANS<br />

IW<br />

0<br />

ID3 36<br />

1M)<br />

1W<br />

135si 0 13593 13596 6656 0.64 0 6656 4940 4940 2.2 2.2<br />

21000000 DRAWINGS & SPECS<br />

1Ml<br />

0<br />

IW 56<br />

loo<br />

100<br />

8909 0 8909 8909 657 0.07 0 657 -8252 -8252 15 1.5<br />

2<strong>2000</strong>000 CONSTRUCTION SCHED<br />

IW<br />

0<br />

1DJ %<br />

100<br />

IO<br />

1813 0 1813 1813 399 0.22 0 399 -1414 4414 0.3 0.3<br />

23000000 INITIAL PROCUREMENT<br />

100<br />

0<br />

loo %<br />

IW<br />

100<br />

4160 0 4160 4160 8155 1.96 0 8155 3995 3995 0.7 0.7<br />

24000000 PROJECT MOB/DEMOS<br />

loo<br />

0<br />

100 %<br />

100<br />

loo<br />

145% 0 1455% 145-58 11170 0.77 0 11170 -3386 -3x38 2.4 2.4<br />

25OOooOO<br />

SITE PREP<br />

103<br />

0<br />

loo %<br />

100<br />

IW<br />

5304 0 5384 5384 1962 0.36 0 1962 -3422 -3422 0.9 0.9<br />

30000000 INSTALL AIR SPRAGE<br />

IO<br />

0<br />

IW 36<br />

10<br />

1CQ<br />

7044 0 7044 7044 2719 0.39 0 2719 -4325 -4325 1.2 1.2<br />

31000000 INSTALL SVE WELLS<br />

IW<br />

0<br />

loo 36<br />

1M)<br />

IW<br />

8995 0 8995 8995 15070 1.68 0 15070 6075 6075 1.5 1.5<br />

3<strong>2000</strong>000 SVE 8 AIR SPARGE TRE<br />

IW<br />

0<br />

100 %<br />

100<br />

1w<br />

2w4o 0 2w40 2cO4O 10889 0.54 0 10899 -9141 -9141 3.3 3.3<br />

33OOOocO WELL HEAD INSTALLAT<br />

IW<br />

0<br />

loo %<br />

1w<br />

loo<br />

31777 0 31777 31777 22672 0.71 0 22672 -9105 -9105 5.2 5.2<br />

34000000 REMED SYSTEM INSTALL<br />

IW<br />

0<br />

100 %<br />

1CiJ<br />

IW<br />

66175 0 65175 65175 31612 0.49 0 31612 -33563 -33563 10.7 10.7<br />

35000000 T&D DEBRISMIASTE<br />

IW<br />

0<br />

iw %<br />

IW<br />

IW<br />

2518 0 2518 2518 422 0.17 0 422 -2O+K -m 0.4 0.4<br />

36000000 SITE RESTORATION<br />

ica<br />

0<br />

IW %<br />

la,<br />

1W<br />

7070 0 7070 7070 3962 0.56 0 3962 -3108 3108 1.2 1.2<br />

37Mx)OOO SYSTEM STARTUP B OPT<br />

100<br />

0<br />

loo 36<br />

1CO<br />

1w<br />

11577 0 11577 11577 126r.0 1.09 0 1264x 1023 1023 1.9 1.9<br />

38000000 CARSON SYS DEMOE<br />

100<br />

0<br />

IO 36<br />

0<br />

100<br />

2902 0 2902 2902 0 0.00 0 0 -2932 -Em 0.5 0.0<br />

40000000 SYSTEM O&M<br />

IW<br />

0<br />

1M) 56<br />

ICO<br />

IW<br />

40029 0 40029 4w29 45618 1.14 0 45618 5589 5589 6.6 6.6<br />

41000000 ASlSVE Maintenance - 1613<br />

100<br />

0<br />

loo %<br />

25<br />

25<br />

45914 0 45914 11479 8345 0.73 28MxI 36345 -9569 -9569 75 1.9<br />

4<strong>2000</strong>000 Operation - Bldg 1613<br />

100<br />

0<br />

ml %<br />

25<br />

25<br />

107321 0 107321 26530 20283 0.76 6ww 80283 -27038 -27038 17.6 4.4<br />

43000000 AfvR<br />

1W<br />

0<br />

loo %<br />

0<br />

0<br />

27$65 0 27965 0 0 0.00 lOOD3 loo00 -17865 -17965 46 0.0<br />

44000000 Addrl CSA Investigation<br />

1w<br />

0<br />

1w %<br />

85<br />

85<br />

0 0 0 0 29154 0.00 5000 2.4151 34154 34154 0.0 0.0<br />

66666666 2WO Restructuring Costs<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0 0 0 0 948 0.00 -1793 -845 -845 845 0.0 0.0<br />

90000000 Ft.@<br />

iw<br />

0<br />

loo 36<br />

85<br />

a5<br />

2374 0 2374 2018 1935 0.96 4w 2335 -39 39 0.4 0.3<br />

98016000 Per Diem<br />

1W<br />

0<br />

loo %<br />

30<br />

30<br />

521 0 521 156 32 0.20 489 521 0 0 0.1 0.0<br />

9809<strong>2000</strong> Equipment<br />

100<br />

0<br />

loo %<br />

30<br />

30<br />

25670 0 25678 7703 0 0.00 9500 9500 -16178 -16178 4.2 1.3<br />

99000100 ADMIN & SUPPORT<br />

100<br />

0<br />

loo %<br />

a5<br />

85<br />

102389 0 102389 87031 127643 1.47 58474 184118 61729 81729 16.6 14.3<br />

99400100 PER DIEMS<br />

!W<br />

0<br />

W %<br />

M<br />

w<br />

26603 0 m33 15962 14371 0.90 12690 27031 458 458 4.4 2.6<br />

609512 0 609512 404098 391934 0.97 215759 607693 -1819 -1819 100.0 65.8


Task Order 11 Cost Performance Curve<br />

700<br />

600<br />

500<br />

400<br />

f<br />

.-<br />

ft3<br />

300<br />

f----- Time Now 11/3/00<br />

200<br />

100<br />

Physical % Complete = 65.8<br />

Financial % Complete = 64.3<br />

0<br />

Jul-00 Aug-00 Sep-00 Ott-00 Nov-00 Dee-00 Jan-01 Feb-01<br />

Mar-01 Apr-01 May-01<br />

1<br />

Time in Months<br />

I --+- RevBaseline m w Actual -k #Earned - I


Work r’;)-ecfive Log<br />

Air spargel& s] stem Building 1613<br />

Task Order: 11<br />

Project Number: 920704<br />

_. 11 /I woo<br />

Impacts<br />

><br />

1 TD 1 O/l Q/99 Disapproved R N/A Respond to Dentz letter of 1 O/l l/99 including Soil Sampling. 30 Days N $7,800<br />

2 TD 11/10199 II/IO/99 A N/A Sampling all monitoring wells iin vicinity of remedial system for constituents of concern 30 N $4,000<br />

3 TD 8/l 7100 8/18/00 A 8/24/00 lnvestiaate for contamination. install three new monitorina wells. 50 N $34 A70<br />

Chancre Tvpe:<br />

TD - Technical Directive<br />

SG - Scope Growth<br />

SR - Scope Reduction<br />

Status:<br />

A - Approved<br />

P - Pending<br />

R - Rejected<br />

W - Withdrawn<br />

Page 1


Cumulative Mass of Volatk, ydrocarbons Discharged<br />

Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />

MCB CAMP LEJEUNE - Building 1613<br />

11 II 6198 11:30<br />

11 II 7198 9145<br />

1 l/20/98 IO:30<br />

12/01198 II:30<br />

12/11/98 II:00<br />

12/15/98 IO:35<br />

12122198 12:20<br />

01/08/99 1505<br />

01/11/99 13:50<br />

01/20/99 14:35<br />

01129l99 14:45<br />

02/05/99 17:06<br />

02/11/99 I!30<br />

02/18/99 14:lO<br />

02126199 IO:00<br />

03/05/99 II:00<br />

03/08/99 14:oo<br />

03118199 8:30<br />

03/25/99 16:04<br />

03/31/99 12:oo<br />

04/06/99 II:30<br />

04113199 13:oo<br />

04/20/99 II:00<br />

04/30/99 II:30<br />

05/04/99 12:oo<br />

05/12/99 8:30<br />

05/19/99 13:oo<br />

08/04/99 7:30<br />

06/08/99 9:45<br />

06/18/99 13:oo<br />

06/25/99 7:45<br />

07/01/99 13:oo<br />

07/09/99 7130<br />

07/14/99 8:00<br />

07122199 13:05<br />

07/27/99 15:55<br />

3087<br />

3093<br />

3166<br />

3427<br />

3662<br />

3757<br />

3927<br />

3982<br />

4052<br />

4227<br />

4444<br />

4498<br />

4640<br />

4807<br />

4995<br />

5162<br />

5239<br />

5473<br />

5640<br />

5784<br />

5930<br />

6020<br />

6192<br />

6433<br />

6524<br />

6716<br />

6882<br />

7267<br />

7368<br />

7575<br />

7738<br />

7885<br />

8078<br />

8196<br />

8385<br />

85791<br />

1130<br />

1130<br />

2350<br />

2672<br />

1700<br />

1833<br />

2193<br />

2635<br />

1032<br />

594.5<br />

402<br />

20716<br />

232<br />

682<br />

840<br />

1008<br />

778<br />

704<br />

1592<br />

367<br />

188<br />

303<br />

119<br />

108<br />

508<br />

184<br />

132<br />

144<br />

213<br />

279<br />

79<br />

88<br />

4<br />

36<br />

273<br />

91<br />

5000<br />

5000<br />

5000<br />

3300<br />

3100<br />

3100<br />

3500<br />

3400<br />

3100<br />

4000<br />

3300<br />

2400<br />

2700<br />

2200<br />

1600<br />

2500<br />

2500<br />

2700<br />

2500<br />

2400<br />

2600<br />

1800<br />

2400<br />

2800<br />

3300<br />

3000<br />

<strong>2000</strong><br />

1700<br />

2100<br />

1400<br />

2300<br />

550<br />

550<br />

550<br />

551<br />

543<br />

541<br />

551<br />

540<br />

540<br />

542<br />

556<br />

542<br />

559<br />

556<br />

539<br />

547<br />

548<br />

555<br />

552<br />

560<br />

558<br />

561<br />

553<br />

535<br />

554<br />

560<br />

564<br />

562<br />

574<br />

543<br />

576<br />

580<br />

580<br />

575<br />

588<br />

579<br />

418<br />

418<br />

418<br />

275<br />

262<br />

263<br />

292<br />

289<br />

264<br />

339<br />

273<br />

203<br />

222<br />

182<br />

136<br />

210<br />

210<br />

224<br />

208<br />

213<br />

247<br />

246<br />

199<br />

223<br />

149<br />

197<br />

228<br />

270<br />

240<br />

169<br />

180<br />

151<br />

135<br />

168<br />

109<br />

183<br />

6.01<br />

6.01<br />

12.50<br />

14.21<br />

9.04<br />

9.75<br />

11.66<br />

14.01<br />

5.49<br />

3.18<br />

2.14<br />

110.16<br />

1.23<br />

3.63<br />

4.47<br />

5.36<br />

4.14<br />

3.74<br />

8.47<br />

1.95<br />

1 .oo<br />

1.61<br />

0.63<br />

0.57<br />

2.70<br />

0.98<br />

0.70<br />

0.77<br />

1.13<br />

1.48<br />

0.42<br />

0.47<br />

0.02<br />

0.19<br />

1.45<br />

0.48<br />

224.61<br />

224.69<br />

467.28<br />

350.02<br />

212.28<br />

229.73<br />

304.69<br />

362.88<br />

129.58<br />

95.96<br />

52.19<br />

2006.40<br />

24.53<br />

59.02<br />

54.54<br />

100.77<br />

77.63<br />

74.91<br />

157.70<br />

37.27<br />

22.11<br />

35.44<br />

11.30<br />

11.48<br />

36.10<br />

17.25<br />

14.33<br />

18.49<br />

24.35<br />

22.48<br />

6.00<br />

6.31<br />

0.26<br />

2.88<br />

14.22<br />

7.91<br />

56.16<br />

1108.53<br />

5552.62<br />

8305.57<br />

9180.40<br />

11073.15<br />

11838.07<br />

12556.25<br />

13378.56<br />

14048.33<br />

16364.24<br />

22372.43<br />

22663.13<br />

23107.92<br />

23648.26<br />

23934.44<br />

24678.08<br />

25487.39<br />

26072.31<br />

26252.92<br />

26360.82<br />

26528.29<br />

26642.65<br />

26732.85<br />

26946.25<br />

27055.47<br />

27318.78<br />

27408.93<br />

27610.87<br />

27707.57<br />

27745.28<br />

27771.64<br />

27779.34<br />

27846.64<br />

27936.06<br />

BOD-Receivedon12/15/98<br />

Bldg 1613 Updated: 11/10/00 Page1 of 3


Cumulative Mass of Volat,, ydrocarbons Discharged<br />

Air Sparging (AS) / Soil Vapor Extraction (SVE) System<br />

MCB CAMP LEJEUNE - Building 1613<br />

08112199 14:oo 8884<br />

86<br />

2900 572 233<br />

0.46 9.54<br />

28094.27<br />

08/19/99 14:50 9058<br />

84<br />

3000 573 241<br />

0.45 9.62<br />

28163.71<br />

08124199 7~56 9171<br />

120<br />

2200 565 179<br />

0.64 10.22<br />

28210.42<br />

09/01/99 9:54 9321<br />

197<br />

1400 560 115<br />

1.05 10.77<br />

28276.02<br />

09/09/99 lo:18 9468<br />

87<br />

3100 564 253<br />

0.46 10.46<br />

28341.04<br />

09/14/99 9:16 9589<br />

27<br />

3000 562 245<br />

0.14 3.15<br />

28375.36<br />

1 O/04/99 l4:45 9701<br />

434<br />

3400 564 277<br />

2.31 57.23<br />

28516.24<br />

10111199 15:lO 9876<br />

3100 561 254<br />

28724.87<br />

1 O/l 9199 14:16 10009<br />

126<br />

2900 560 238<br />

0.67 14.27<br />

28764.42<br />

759 10122<br />

3100 554 257<br />

28798.02<br />

11/03/99 9:40 10221<br />

2900 555 240<br />

28798.02<br />

11 /OQ/QQ IO:45 10349<br />

3000 561 246<br />

28798.02<br />

11 II 5199 13:13 10493<br />

2900 555 240<br />

28798.02<br />

11122l99 13:lO 10596<br />

71<br />

3100 555 257<br />

0.38 8.67<br />

28816.63<br />

12/03/99 1503 10866<br />

3200 546 269<br />

28865.42<br />

12/12/99 15:20 11080<br />

3000 544 253<br />

28865.42<br />

12/17/99 15:07 11202<br />

3400 541 289<br />

28865.42<br />

01/04/00 9:46 11629<br />

21<br />

3100 545 261<br />

0.11<br />

3<br />

28888.66<br />

01/08/00 1358 11729<br />

2900 549 243<br />

28894.11<br />

01112/00 9:58 11819<br />

23<br />

2900 540 247<br />

0.07<br />

2<br />

28896.97<br />

01/21/00 4133 12041<br />

9<br />

1400 532 121<br />

0.05<br />

1<br />

28906.43<br />

01/27/00 16:29 12187<br />

2300 535 198<br />

28908.00<br />

02/09/00 12:55 12306<br />

2<br />

2800 540 238<br />

0.01<br />

0<br />

28908.57<br />

02116lOO 14:24 12476<br />

2500 545 211<br />

28909.37<br />

02/27/00 17:15 12741<br />

2500 545 211<br />

28909.37<br />

03/08/00 9:30 12974<br />

3174 554 263<br />

28909.37<br />

03/14/00 14:25 13123<br />

254<br />

6054 538 517<br />

1.35 63<br />

29103.43<br />

03/20/00 II:36 13264<br />

2733 552 228<br />

29287.07<br />

03/27/00 IO:30 13430<br />

2340 559 192<br />

29287.07<br />

04/05/00 IO;15 13646<br />

1<br />

2516 560 207<br />

0.01<br />

0<br />

29287.51<br />

04/11/00 7:oo 13763<br />

3890 585 305<br />

29287.75<br />

04/17/00 7:oo 13932<br />

9.8<br />

2567 556 212<br />

0.05<br />

1<br />

29291.24<br />

04/27/00~ 9:301 14173) 4310 566 350 29296.21<br />

Bldg 1613 Updated: 11/10/00 Page2 of 3


Cumulative Mass of Volatb, ydrocarbons Discharged<br />

Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />

MCB CAMP LEJEUNE - Building 1613<br />

SVE Stack _,,, ,,,, ,, ., .“. ‘- ., ,.<br />

GuIQ~litt”*~Mdss ,.<br />

TRDischajge d;Hydfocartjoirs<br />

'.<br />

Rati' Discharged Comments<br />

(rgg/i] ;, (lb;/day), @a)<br />

05/02/00 II:301 14294 10.4 2922 558 241 0.06 1 29299.21<br />

05/09/00 8:00 14461<br />

10.8<br />

3100 560 254<br />

0.06 1<br />

29307.91<br />

05/15/00 7:30 14604<br />

2990 556 247<br />

29311.80<br />

05/25/00 8:21 14742<br />

23<br />

3200 565 260<br />

0.12 3<br />

29319.99<br />

06/01/00 8:40 14909<br />

35<br />

3300 558 272<br />

0.19 5<br />

29345.66<br />

06/06/00 9:20 15030<br />

23<br />

3200 561 262<br />

0.12 3<br />

29364.31<br />

06/15/00 1355 15203<br />

17<br />

3100 571 249<br />

0.09 2<br />

29381.92<br />

06/22/00 14:13 15415<br />

55<br />

3500 569 283<br />

0.29 7<br />

29423.52<br />

07/07/00 12:15 15740<br />

24<br />

3800 568 307<br />

0.13 4<br />

29497.40<br />

07/14/00 12:58 15907<br />

15<br />

3500 566 284<br />

0.08 2<br />

29516.68<br />

07/21/00 14144 16075<br />

9<br />

3000 560 246<br />

0.05 1<br />

29527.47<br />

07/28/00 13:44 16219<br />

26<br />

2900 582 229<br />

0.14 3<br />

29539.14<br />

08/02/00 12:48 16338<br />

11<br />

3100 582 245<br />

0.06 1<br />

29549.34<br />

08/11/00 12:37 16477<br />

18<br />

2800 583 221<br />

0.10 2<br />

29558.53<br />

08/15/00 8:05 16568<br />

6<br />

3200 569 258<br />

0.03 1<br />

29563.51<br />

08/22/00 8:15 16749<br />

7<br />

3300 566 268<br />

0.04 1<br />

29569.66<br />

08/28/00 1358 16885<br />

4<br />

3200 574 256<br />

0.02 0<br />

29573.57<br />

09/07/00 II:38 17073<br />

26<br />

2200 563 180<br />

0.14 2<br />

29584.18<br />

09/11/00 1451 17169<br />

7<br />

3200 569 258<br />

0.04 1<br />

29590.35<br />

09/19/00 IO:58 17254<br />

10<br />

3000 568 243<br />

0.05 1<br />

29593.92<br />

09/28/00 14:lO 17288<br />

16<br />

3900 561 319<br />

0.09 2<br />

29596.46<br />

10/03/00 13:17 17407<br />

11<br />

3900 568 316<br />

0.06 2<br />

29606.59<br />

10/11/00 15:40 17564<br />

3800 549 318<br />

29611.99<br />

10/16/00 13:40 17657<br />

4<br />

3700 564 301<br />

0.02<br />

1<br />

29613.11<br />

10/26/00 7~57 17891<br />

3<br />

3100 551 259<br />

0.02<br />

0<br />

29617.70<br />

10/31/00 757 18011<br />

6<br />

3500 553 291<br />

0.03<br />

1<br />

29620.70 Extra<strong>pol</strong>ated Data<br />

Notes:<br />

C = (PPM measured x K x (M&g) /IOCQ<br />

C: vapor concentration (mgll)<br />

PPM messu,ed FID reading (PPM)<br />

K: number of carbon atoms in calibration gas<br />

(1 in methane)<br />

TH: total hydrocarbons calculated as gasoline<br />

(GW<br />

percent water vapor by volume<br />

SVE Stack pipe diameter<br />

0.003<br />

4<br />

l<br />

Q = (1-B) x V x A x (P/P std) x (T&T)<br />

Q: vapor flowrate (SCFM)<br />

8: percent water vapor in flowstream, calculation assumes saturated water stream or B = 0.<br />

V: vapor velocity (fUmin)<br />

A: cross-sectional area (sq. ft)<br />

P: absolute pressure of flowstream (” Hg)<br />

Pstd: standard pressure (29.92” Hg)<br />

T: absolute temperature of flowstream (degrees Rankine)<br />

Tsfd standard temperature (528 degrees Rankine)<br />

at68degrees F(fromPerry'shandbook)<br />

Estimated value due to malfunctionng instrument<br />

M=QxCx0.0895<br />

M: hydrocarbon recovery rate (lb/day)<br />

Assumptions:<br />

Mg = 128 mglmg-mole<br />

Kg = 24.07 dsm’WlO% gm -mole<br />

B = 0.003 from Perry’s Chemical Handbook<br />

A = 0.0873 sq. ft<br />

Bldg 1613 Updated: 11/10/00 Page3of 3


n<br />

Building 1613<br />

VOC Pounds Removed and Costs<br />

400<br />

h<br />

$2.000.00<br />

250<br />

$1,200.00<br />

150<br />

Q 100<br />

r<br />

J\<br />

r 50<br />

<br />

0<br />

F- Nob99 Dee-99 Jan-00 Feb-00 Mar-00<br />

c.2<br />

Apr-00 May-00 Jun-00 J&O0 Aug-00 Sep-00 01%00<br />

Past 12 Months<br />

$600.00<br />

$400.00<br />

$200.00<br />

60.00<br />

- VOC Pounds Removed t Cost/ Pound Removed -Average -Average<br />

Task Order 11 - Project 920704<br />

Camp Lejeune MCB, NC<br />

October 31,200O


n<br />

Building 1613 Cumulative VOC Pounds Removed<br />

2g,&JlJ ,<br />

29.600<br />

29,400<br />

p”<br />

29,200<br />

:<br />

n 29,000<br />

26,600<br />

26.600<br />

26,400<br />

Now99<br />

Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00<br />

Past 12 Months<br />

/<br />

-Cumulative<br />

Pounds Removed<br />

Task Order 11 - Project 920704 Camp Lejeune MCB, NC October 31.<strong>2000</strong>


MONTHLY PROGRESS REPORT - SHORT FORM<br />

Report Dates: October 1, <strong>2000</strong> to October 31, <strong>2000</strong> Hard Copies Distributed to:<br />

Contract No.: N62470-97-D-5000 COTR:<br />

Karen Wilson<br />

(757)322-4817<br />

Order No.: 0014<br />

Wilsonke@efdlant.navfac.navv.mil<br />

I<br />

Pr-,ect No.: 920764<br />

RAC CM:<br />

(757)396-5121<br />

Greg Hedley<br />

Project Name: Hadnot Point Fuel Farm Hedlevqs@efdlant.navfac.navy.mil ext. 383<br />

Project Location: MCB Camp Lejeune, NC Project Controls Manager:<br />

Linda Barberousse<br />

(757)363-7190<br />

Project Manager: James A. Dunn, Jr., P.E.<br />

Lbarberousse@theitqroup.com<br />

Project Description: Contract Files<br />

Construction and Operation of Biosparging, Air Sparging, and Soil Vapor<br />

Extraction Systems with aggressive fluid vapor recovery at Hadnot Point<br />

Fuel Farm/Building 1115.<br />

Scheduled Web Site Posting Date:<br />

Original Contract Start Date:<br />

Original Contract Completion Date:<br />

Current Contract Completion Date:<br />

O&M Completion Date:<br />

Current Projected Completion Date:<br />

Current TO Ceiling:<br />

Total $ to Date:<br />

Remaining Funds:<br />

Estimated Report Period:<br />

Forecast @ Completion:<br />

2,826,904.00<br />

2,012,115.00<br />

814,789.OO<br />

70,696.OO<br />

2,822,147.00<br />

Ht a i extraction wells recovered 61 gals. of product. Normal O&M of the SE system resulted in recovery of 52,227 Ibs. of<br />

hydrocarbons. Continued daily gauging of wells and Buildings 1101 and 1068 at HPFF and twice weekly checking of all twelve<br />

buildings. Re-caulked buildings 1108, 1115 and 1068 to close potential vapor pathways. Conducted 6 AFVR events on various<br />

Current schedule attached.<br />

None.<br />

Orig<br />

Provide RA for Hadnot Point Fuel Farm bldg.<br />

1115, Camp Lejeune, NC.<br />

06/30/98 07122199 $1,483,522.00 $58,413.00 $1,541,935.00<br />

1 Additional 12 months of O&M through 8/31/00 05128199 08/31 /OO $214,989.00 $11,525.00 $226514.00<br />

2<br />

Install trench at East end of Bldg 1101 and<br />

install blower.<br />

12129199 08/01 /OO $0.00 $0.00 $0.00<br />

3<br />

Scope Change - Completely replace all O&M<br />

for the current period<br />

01/l 3/00 08/01 /OO $0.00 $0.00 $0.00<br />

Prep Work Plans to provide trenching around<br />

4 Bldg. 1101 and trenching at Wells HPFF-28 01/28/00 08/01 /OO $7,122 $431 .oo !§7,553.00<br />

-,m and MW-15<br />

Exploratory Excavation around MW HPFF-28<br />

5<br />

and MW-15 to attempt to determine the<br />

source of free product. Conduct SVE<br />

02/22/00 08/01 /OO $80,848.00 $3,166.00 $84,014.00<br />

influence testing program<br />

6 Seal Bldg. 1101 and conduct test of biosparge 03/01/00 08/01 /OO $28,004.00 $1,219.00 $29,223.00


located at Hadnot Pt. Fuel Farm and Bldg<br />

9 I Continue O&M for 12 months 1 05/12/00 / 04/30/01 / $559,288.00 1 $25,381.00 / $584,669.00<br />

10 / O&M Activities 1 09/02/00 / 04/30/01 1 $17,997.00 1 $1,103.00 1 $19,100.00<br />

11<br />

Event Monitoring on three occasions in Bldg.<br />

1101,1104,1114.<br />

09/28/00 04/30/01 $47,946.00 $l,660y<br />

I I I I I<br />

Totals $2,826,904.00 $119,218.00 $2,946,122.00<br />

Approved<br />

by:<br />

Roland Moreau, P.E.<br />

Program Manager<br />

Attachments: Performance Report (2)<br />

Cost Performance Curve (1)<br />

Schedule (1)<br />

Site Data (9)<br />

Work Directive Log (1)<br />

LANTDIV RAC Field Form (2)


ITCorporation<br />

START DATE 01 JA<br />

FIN DATE JOAPROI<br />

PAGE NO. 1<br />

DATA DATE<br />

03NOVOt<br />

Petformance<br />

Report<br />

WBS<br />

Code<br />

Description<br />

Otl<br />

Bud<br />

ant<br />

ant<br />

Rev<br />

ClU<br />

Qnt<br />

Task<br />

Unit<br />

Ins<br />

ant<br />

Task Orig.<br />

% Budg<br />

Camp S<br />

s<br />

Current<br />

Rev.1 Budg.<br />

Adjust $<br />

Earned Actual ETC Forecast Variance Variance % Physl<br />

$ t<br />

CPI At from from of %<br />

ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />

03001000 Abandon/Remove Fuel Lines<br />

100<br />

0<br />

loo %<br />

7<br />

7 238928 0 238928 16725 17277 1.03 221500 238777 -151<br />

-151 8.5 0.6<br />

05000000 SVE MW-15<br />

IW<br />

0<br />

IW %<br />

0<br />

0 20730 0 28730 0 0 0.00 26739 28730 0<br />

0 1.0 0.0<br />

OBOOI 000<br />

500 CY Soil Collection<br />

IO<br />

0<br />

loo %<br />

0<br />

0 54165 0 54165 0 0 0.00 54165 54165 0<br />

0 1.9 0.0<br />

10000000 O&M Manual 8 As-BUM<br />

IW<br />

0<br />

loo %<br />

loo<br />

100 11136 0 11138 11138 35806 3.21 0 35806 24668<br />

24668 0.4 0.4<br />

<strong>2000</strong>0000 work Plans<br />

100<br />

0<br />

loo %<br />

IW<br />

ICC 15109 0 15109 15109 10440 0.69 0 10440 469<br />

469 0.5 0.5<br />

21000000 Drawings & Specs<br />

100<br />

0<br />

1w %<br />

WJ<br />

100 16682 0 16682 16682 210 0.01 0 210 -16472<br />

-16472 0.6 0.6<br />

21006010 EventSummary Rpt _ 1101<br />

100<br />

0<br />

lee %<br />

50<br />

50 17997 0 17997 8999 9248 1.03 8750 17998 1<br />

1 0.6 0.3<br />

2<strong>2000</strong>000 Const Sched<br />

IW<br />

0<br />

lee %<br />

0<br />

103 3219 0 3219 3219 0 0.00 0 0 -3219<br />

-3219 0.1 0.0<br />

23000000 Initial Procurement<br />

IO<br />

0<br />

loo 56<br />

loo<br />

1w 9853 0 9853 9853 14523 1.47 0 14523 4670<br />

4670 0.3 0.3<br />

24000000 Mobmemob<br />

100<br />

0<br />

1w 56<br />

1w<br />

1W 37827 0 37827 37027 49438 1.31 0 49439 11611<br />

11611 1.3 1.3<br />

25OOoOGl<br />

NW Site Prep<br />

100<br />

0<br />

loo %<br />

lrn<br />

1w 7075 0 7075 7075 4614 0.68 0 4814 -2261<br />

-2261 0.3 0.3<br />

26OOOGJO Refwb Hadnot WWTP<br />

100<br />

0<br />

1w %<br />

100<br />

1w 12879 0 12079 12879 76.58 0.59 0 7658 -5221<br />

-5221 0.5 0.5<br />

3ooOOocKJ NW lnst Air Sparge Wells<br />

1W<br />

0<br />

ICC %<br />

IW<br />

IW 8245 0 8245 8245 12905 1.57 0 12905 4660<br />

4660 0.3 0.3<br />

30100900 NW lnst Bio Sparge Wells<br />

100<br />

0<br />

1w %<br />

IW<br />

1W 36564 0 36561 36564 30073 0.82 0 30073 6491<br />

4491 1.3 1.3<br />

30<strong>2000</strong>00 NW Bii Sparge Pilot Test<br />

100<br />

0<br />

loo %<br />

loo<br />

1cO 4786 0 4786 4706 20209 4.22 0 20209 15423<br />

15423 0.2 0.2<br />

31000000 NW SVE Horiz W&Trench<br />

loo<br />

0<br />

loo %<br />

1w<br />

loo 96388 0 96388 963s3 40367 0.42 0 40367 -56021<br />

-56021 3.4 3.4<br />

33OOOoOo NW BiolSVEIAir Sparge WH<br />

100<br />

0<br />

1w %<br />

IW<br />

IW 27714 0 27714 27714 15747 0.57 0 15747 -11967<br />

-11937 1.0 1.0<br />

34000000 NW Remed Sys Install<br />

1W<br />

0<br />

loo %<br />

loo<br />

loo 137685 0 137685 137685 96993 0.70 0 96996 -40689<br />

-40689 4.9 4.9<br />

35000000 T&D DebriwWaste<br />

1W<br />

0<br />

ICC %<br />

loo<br />

IW 10976 0 10976 10976 2570 0.23 0 2578 4395<br />

-8390 0.4 0.4<br />

36000000 NW Site Restoration<br />

IO<br />

0<br />

IW %<br />

la,<br />

loo 6271 0 6271 6271 219x 3.49 0 21900 15629<br />

15629 02 0.2<br />

37000000 NW Sys Startup/Opt<br />

100<br />

0<br />

10 %<br />

loo<br />

100 7681 0 7881 7681 10445 1.33 0 10445 2564<br />

2564 0.3 0.3<br />

40000000 Sye O&M<br />

IW<br />

0<br />

loo %<br />

IW<br />

IW 10162 0 10162 10162 31936 3.06 0 31086 20924<br />

20924 0.4 0.4<br />

40100000 ASlSVE Main&HPFF/NW & SE<br />

100<br />

0<br />

loo %<br />

70<br />

70 930&l 0 93oe4 65159 40504 0.62 33cw 78594 -14580<br />

-14530 3.3 2.3<br />

40<strong>2000</strong>00 Operation of HPPFF NW SE<br />

100<br />

0<br />

IW %<br />

70<br />

70 194146 0 194146 135902 74773 0.55 105000 179773 -14373<br />

-14373 6.9 4.8<br />

40300000 AFVRModl<br />

100<br />

0<br />

loo 56<br />

70<br />

70 76630 0 76630 53641 37529 0.70 39100 76629 -1<br />

-1 2.7 1.9<br />

40400000 Bldg 1101<br />

loo<br />

0<br />

loo %<br />

loo<br />

loo 61395 0 61395 61395 67640 1.10 0 67640 6245<br />

6245 2.2 2.2<br />

40500000 Gauging & Sniffing<br />

1w<br />

0<br />

loo 56<br />

70<br />

70 137324 0 137324 96127 901% 0.94 47064 137210 -114<br />

-114 4.9 3.4<br />

40609000 HPFF28&MW15ExplorEvac&SVE<br />

lea<br />

0<br />

loo %<br />

1W<br />

IW 88341 0 88341 68341 79579 0.90 0 79579 8762<br />

-8762 3.1 3.1<br />

4ffi50000 Emergency Pwr-Bldg 1101<br />

100<br />

0<br />

ml %<br />

17<br />

17 26750 0 26750 4548 4444 0.98 20823 25266 -1484<br />

-1484 0.9 0.2<br />

40700000 Caulk 1 101IBiosparge Tst<br />

loo<br />

0<br />

ICC %<br />

1w<br />

1w 28798 0 28799 20790 11728 0.41 0 11728 -17070<br />

-17070 1.0 1.0<br />

40800000 Install Monitoring Equipm<br />

loo<br />

0<br />

IW %<br />

4<br />

4 47946 0 47946 1918 2149 1.12 45797 47946 0<br />

0 1.7 0.1<br />

50000000 Site Investigation<br />

loo<br />

0<br />

loo %<br />

100<br />

1w 0 0 0 0 627 0.00 0 627 627<br />

627 0.0 0.0<br />

55000000 SE Site Prep<br />

IW<br />

0<br />

1w %<br />

1W<br />

100 7453 0 7453 7453 6247 0.84 0 6247 -1206<br />

-1206 0.3 0.3


ITCorporation “<br />

START DATE 01 JA.<br />

FIN DATE JOAPROI<br />

Order14-920764 PAGE NO. 2<br />

DATA DATE 03NOVO[<br />

Performance<br />

Report<br />

WBS<br />

Code<br />

Description<br />

Oil<br />

Bud<br />

Qnt<br />

Qnt<br />

Rev<br />

CUr<br />

Qnt<br />

Task<br />

Unit<br />

Ills<br />

Qnt<br />

Task orlg.<br />

% Budg<br />

Comp $<br />

$ Current Earned Actual ETC Forecast Variance Vartance % Physl<br />

RW.l Budg. s s CPI At from from of %<br />

Adjust $ ToDate Comp. Org. Bud Cur. Bud Praj Comp<br />

60000000<br />

SE lnst Air Sparge<br />

Wells<br />

loo<br />

0<br />

loo %<br />

100<br />

loo<br />

48961<br />

48951<br />

48961 41372 0.84 0 41372 -7589<br />

-7589<br />

1.7 1.7<br />

60100000<br />

SE lnst Bio Sparge<br />

Wells<br />

loo<br />

0<br />

ICC %<br />

IW<br />

loo<br />

29729<br />

29729<br />

29729 31323 1.05 0 31323 1594<br />

1594<br />

1.1 1.1<br />

61000000<br />

SE SVE Horiz<br />

WelVTrench<br />

1w<br />

0<br />

1Ca %<br />

100<br />

1w<br />

220957<br />

220957<br />

220957 291379 1.32 0 291379 70422<br />

70422<br />

7.8 7.8<br />

63000W0<br />

SE Bio/SVE/Air Sparge WH<br />

IW<br />

0<br />

IW %<br />

100<br />

IW<br />

74293<br />

74296<br />

742% 65485 0.88 0 65485 -8811<br />

-6811<br />

2.6 2.6<br />

64wooM)<br />

SE Remed<br />

Sys Install<br />

1w<br />

0<br />

la0 %<br />

ICC<br />

IW<br />

206879<br />

206879<br />

206879 185426 0.90 0 185426 -21453<br />

-21453<br />

7.3 7.3<br />

66woow<br />

SE Site Restoration<br />

loo<br />

0<br />

IW %<br />

100<br />

loo<br />

5969<br />

5969<br />

5969 55655 9.49 0 53655 50666<br />

5068s<br />

02 02<br />

86666666<br />

2W0 Restructuring<br />

Costs<br />

loo<br />

0<br />

1w 36<br />

0<br />

0<br />

0<br />

0<br />

0 9340 0.00 -9630 290 -290<br />

-290<br />

0.0 0.0<br />

67000000<br />

SE Sys StartuplOpt<br />

loo<br />

0<br />

loo %<br />

loo<br />

IW<br />

116%<br />

11656<br />

11656 16018 1.37 0 16018 4362<br />

4362<br />

04 0.4<br />

7woowo<br />

AFVR<br />

loo<br />

0<br />

loo %<br />

loo<br />

1w<br />

42C&5<br />

42035<br />

42036 68419 1.63 0 68419 as&l<br />

26384<br />

1.5 1.5<br />

awwwo<br />

Sampling<br />

&Analysis<br />

1w<br />

0<br />

1w %<br />

58<br />

58<br />

69548<br />

89546<br />

40337 33876 0.84 393W 72876 3330<br />

3330<br />

2.5 1.4<br />

9woowo<br />

Fuel<br />

1w<br />

0<br />

1w 56<br />

Bl<br />

90<br />

3211<br />

3211<br />

2890 19449 6.73 92 19541 16330<br />

16330<br />

0.1 0.1<br />

95owooo<br />

Conaete<br />

Pads<br />

loo<br />

0<br />

IW %<br />

loo<br />

loo<br />

0<br />

0<br />

0 5772 0.00 0 5772 5772<br />

5772<br />

0.0 0.0<br />

9809<strong>2000</strong><br />

Equipment<br />

loo<br />

0<br />

loo %<br />

58<br />

58<br />

153442<br />

153442<br />

as996 30035 0.34 87387 117422 -36020<br />

-36020<br />

5.4 31<br />

99WOlW<br />

Admin<br />

& Support<br />

loo<br />

0<br />

loo %<br />

80<br />

80<br />

252339<br />

252339<br />

201871 214006 1.06 41970 255977 3638<br />

3638<br />

a.9 7.1<br />

994WlW<br />

Per Lhls<br />

IW<br />

0<br />

loo %<br />

80<br />

80<br />

145743 0 145743 118594 96466 0.83 42293 138759 -6904 aa4 5.2 4.1<br />

2828994 0 2828994 2129829 2012115 0.95 810031 2822147 -4757 -4757 1w.o 74.9<br />

2828994 0 2828994 2129829 2012116 0.95 910031 2822147 -4757 4757 100.0 74.9


Task Order 14 Cost Performance Curve<br />

3000<br />

2500<br />

1500<br />

f--- Time Now 11/3/00<br />

1000<br />

500<br />

Physical % Complete = 74.9<br />

Financial % Complete = 71.2<br />

0<br />

Jul-00 Aug-00 Sep-00<br />

Nov-00 Dee-00 Jan-01 Feb-01 Mar-01<br />

Apr-01<br />

#<br />

Time in Months


start Date 01 JAN98 Eady Bar<br />

014x<br />

sheet1cf1<br />

Date Revision<br />

:inish Date 3OAPROl Progress Bar IT Corporation<br />

CW Appoved<br />

Data Date 03NOVOO<br />

Critical Activity<br />

iun Date IONOVOO 08:21<br />

Task Order 14 - Project 920764<br />

0 Primavera Systems, Inc.<br />

Fuel Line Removal


Cumulative Mass of Vo, Hydrocarbons Discharged<br />

Air Sparge I Soil Va r Extraction System<br />

MCB Camp1 Lejeune - Hadnot Point Fuel Farm, North West<br />

SVE Stack<br />

02/15/99 14:oo<br />

02/16/99 lo:oo<br />

02/17/99 13:30<br />

02/18/99 lo:30<br />

02/19/99 13:oo<br />

02/22/99 15:15<br />

03/05/SS 6:00<br />

03/111S9 9:30<br />

03/18/SS 1 I:00<br />

03/25/99 14:45<br />

04/01/99 1o:oo<br />

04/06/99 13:oo<br />

04/13/99 15:oo<br />

04/20/99 14:oo<br />

04/30/99 1430<br />

owo4/99 14:Oo<br />

05/13/99 moo<br />

05/21/99 14:oo<br />

06/03/SS 6:30<br />

06/08/99 13:oo<br />

06/14/99 13:oo<br />

06/25/99 12:oo<br />

07/01199 8:oO<br />

07/09/99 12:oo<br />

07/14/99 12:30<br />

07/22/99 IO:30<br />

07/30/99 14:oo<br />

08/05/99 11:Oo<br />

08/l 3199 12:oo<br />

08/20/99 7:30<br />

08/24/99 10:45<br />

09/02/99 7:26<br />

09/08/99 7:26<br />

09/13/99 13:10<br />

09/23/99 13:lO<br />

10/05/99 1450<br />

10/14/99 13:12<br />

10120/99 838<br />

10/29/99 9:49<br />

11/04/99 15:42<br />

11/12/99 11:45<br />

11115/99 11:39<br />

11/22/99 15:09<br />

e/02/99 13:33<br />

v/08/99 1454<br />

94<br />

115<br />

141<br />

215<br />

411<br />

556<br />

725<br />

666<br />

929<br />

1027<br />

IISO<br />

1364<br />

1603<br />

1626<br />

1788<br />

1923<br />

2160<br />

2265<br />

2429<br />

2620<br />

2726<br />

2919<br />

3029<br />

3216<br />

3410<br />

3551<br />

3721<br />

3864<br />

3983<br />

4152<br />

4296<br />

4334<br />

4574<br />

4696<br />

4828<br />

4892<br />

4976<br />

5122<br />

5266<br />

5337<br />

5511<br />

5748<br />

5894<br />

327<br />

371<br />

233<br />

140<br />

427<br />

168<br />

88<br />

51<br />

35<br />

38<br />

1700<br />

53<br />

236<br />

582<br />

285<br />

100<br />

124<br />

85<br />

31<br />

137<br />

119<br />

51<br />

97<br />

266<br />

92<br />

144<br />

115<br />

115<br />

19<br />

20<br />

126<br />

137<br />

14<br />

162<br />

79<br />

30<br />

21<br />

18<br />

18<br />

300 531<br />

1300 528<br />

3000 536<br />

5500 549<br />

5300 571<br />

6500 566<br />

4700 570<br />

5600 570<br />

6600 569<br />

2800 555<br />

2900 542<br />

1700 551<br />

600 542<br />

1600 554<br />

5900 589<br />

5900 591<br />

5000 560<br />

1000 585<br />

1300 586<br />

1200 592<br />

3700 588<br />

6900 603<br />

500 585<br />

3800 587<br />

7200 595<br />

6600 587<br />

7300 587<br />

6800 491<br />

6800 491<br />

7300 592<br />

7300 560<br />

6600 576<br />

6700 582<br />

6800 572<br />

6800 559<br />

7200 565<br />

6800 580<br />

6800 573<br />

6800 585<br />

6400 558<br />

6700 579<br />

29<br />

128<br />

292<br />

516<br />

488<br />

598<br />

430<br />

512<br />

604<br />

263<br />

279<br />

156<br />

54<br />

146<br />

506<br />

505<br />

451<br />

86<br />

112<br />

102<br />

318<br />

631<br />

47<br />

352<br />

668<br />

612<br />

677<br />

753<br />

753<br />

680<br />

719<br />

632<br />

626<br />

638<br />

652<br />

693<br />

638<br />

646<br />

623<br />

624<br />

621<br />

___<br />

1.43<br />

1.74<br />

1.97<br />

1.24<br />

0.74<br />

2.27<br />

0.89<br />

0.47<br />

0.27<br />

0.19<br />

0.20<br />

9.04<br />

0.28<br />

1.26<br />

3.09<br />

1.52<br />

0.53<br />

0.66<br />

0.45<br />

0.16<br />

0.73<br />

0.63<br />

0.27<br />

0.52<br />

1.41<br />

0.49<br />

0.77<br />

0.61<br />

0.61<br />

0.10<br />

0.11<br />

0.67<br />

0.73<br />

0.07<br />

0.86<br />

0.42<br />

0.16<br />

0.11<br />

0.10<br />

0.10<br />

^ .^<br />

3.71 2.01<br />

19.96 38.51<br />

51.49 330.29<br />

57.20 663.15<br />

32.51 975.25<br />

121.60 1492.14<br />

34.35 1631.84<br />

21.44 1745.74<br />

14.67 1868.36<br />

4.38 1937.40<br />

5.04 1984.31<br />

126.22 2047.21<br />

1.38 2477.79<br />

16.40 2527.74<br />

140.30 3301.46<br />

68.47 3845.14<br />

21.49 4115.01<br />

5.10 4220.81<br />

4.54 4242.10<br />

1.51 4266.43<br />

20.75 4317.44<br />

35.76 4537.56<br />

1.14 4686.70<br />

16.26 4737.83<br />

84.52 5094.76<br />

26.78 5472.74<br />

46.37 5623.62<br />

41.24 5932.08<br />

41.24 6179.52<br />

6.15 6217.03<br />

6.85 6282.03<br />

37.91 6395.78<br />

40.84 6612.34<br />

6666.79<br />

4.35 6674.58<br />

53.45 6847.99<br />

23.98 7083.53<br />

9.22 7131.25<br />

6.23 7187.26<br />

5.35 7244.42<br />

5.32 7276.85<br />

Extra<strong>pol</strong>ated Data, System not sampled duetofulltank& electrical problem<br />

Extra<strong>pol</strong>ated Da<br />

Extra<strong>pol</strong>ated Da<br />

Hpff-nw Updated: 11/10/00 Page 1 of2


Cumulative Mass of Vo, Hydrocarbons Discharged<br />

r Extraction System<br />

MCB Camp1 Lejeune - Hadnot Point Fuel Farm, North West<br />

SVE Stack<br />

Commehts<br />

01/12/00 11:30 6460<br />

01/21/W 1242 8665<br />

02/01/w 13:46 6744<br />

02/07/W 13:46 6744<br />

02/16/W lo:47 6808<br />

02/25/W 12:38 7014<br />

03/16/W 13:30 7429<br />

03/21/W IO:06 7529<br />

03/28/W 10:00 7610<br />

04/05/w 13:30 7774<br />

04/11/w 930 7915<br />

04/18/W 9:35 8040<br />

04/27/W 10:30 8161<br />

05/03/w 730 8305<br />

05/09/w lo:00 8391<br />

05/15/00 14:30 8536<br />

05/24/W 8:15 8745<br />

06/01/W Ml5 8819<br />

06/06/W 1430 8928<br />

06/15/w 15:50 9146<br />

06/23/W 14:20 9338<br />

07/06/W 13:12 9638<br />

07/13/w 13:31 9806<br />

07/20/W 13:16 9974<br />

07/28/W 11:41 10148<br />

08/l l/W II:02 10392<br />

06/15/w 10:12 10428<br />

08/23/w 7:35 10511<br />

08/29100 7:45 10628<br />

09/13/w 8:05 10854<br />

09/22/w 1319 11010<br />

10/06/W 13:56 11134<br />

10/12/w 13156 11220<br />

10/18/W lo:02 11359<br />

10/25/W 13:25 11530<br />

10/31/w 13:25 11674<br />

9<br />

94<br />

355.5<br />

36.9<br />

16.4<br />

46.4<br />

51.4<br />

112<br />

84<br />

187<br />

42<br />

16<br />

120<br />

35<br />

8<br />

13<br />

64<br />

66<br />

24<br />

36<br />

32<br />

24<br />

16<br />

26<br />

22<br />

22<br />

6300<br />

6900<br />

3800<br />

7300<br />

7700<br />

6652<br />

6758<br />

6980<br />

3588<br />

6891<br />

3500<br />

3500<br />

3500<br />

8100<br />

6000<br />

7100<br />

1200<br />

600<br />

7800<br />

7900<br />

5700<br />

7600<br />

7000<br />

7800<br />

7700<br />

7800<br />

8200<br />

8100<br />

8400<br />

8800<br />

9700<br />

7900<br />

8200<br />

7900<br />

8425<br />

568<br />

549<br />

548<br />

460<br />

558<br />

565<br />

571<br />

559<br />

584<br />

570<br />

565<br />

560<br />

562<br />

562<br />

578<br />

574<br />

583<br />

591<br />

582<br />

589<br />

594<br />

587<br />

586<br />

595<br />

579<br />

587<br />

584<br />

570<br />

569<br />

573<br />

579<br />

587<br />

574<br />

566<br />

574<br />

575<br />

603<br />

684<br />

379<br />

714<br />

710<br />

602<br />

632<br />

609<br />

297<br />

566<br />

290<br />

325<br />

325<br />

548<br />

545<br />

634<br />

110<br />

56<br />

870<br />

724<br />

528<br />

656<br />

595<br />

702<br />

683<br />

727<br />

783<br />

774<br />

798<br />

827<br />

861<br />

749<br />

788<br />

749<br />

789<br />

0.25<br />

0.29<br />

0.20<br />

0.05<br />

0.50<br />

13.50<br />

17.90<br />

6.67<br />

3.06<br />

26.91<br />

1.89 50.20<br />

0.20 9.95<br />

0.10 2.85<br />

0.25 12.11<br />

0.27 13.33<br />

0.60 33.82<br />

0.45 4.42<br />

0.99 4.99<br />

0.22 14.46<br />

0.09 4.02<br />

0.64 37.45<br />

0.19 9.91<br />

0.04 2.67<br />

0.07 4.23<br />

0.34 22.13<br />

0.35 24.58<br />

0.13 8.85<br />

0.19 13.87<br />

0.17 12.59<br />

0.13 9.83<br />

0.09 5.70<br />

0.14 9.75<br />

0.12 7.84<br />

0.12 8.26<br />

7592.87<br />

7726.96<br />

7787.39<br />

7767.39<br />

7771.47<br />

7784.60<br />

8017.30<br />

8073.37<br />

8073.37<br />

8244.88<br />

8421.56<br />

8447.46<br />

8454.64<br />

8463.19<br />

8484.88<br />

8561.73<br />

8767.08<br />

8826.01<br />

8847.38<br />

8870.05<br />

8927.30<br />

9043.61<br />

9188.78<br />

9354.55<br />

9400.18<br />

9435.24<br />

9455.01<br />

9535.79<br />

9617.28<br />

9723.28<br />

9808.62<br />

9866.55<br />

9894.39<br />

9939.15<br />

10001.82<br />

10050.12<br />

System down for repairs to Separate<br />

Extra<strong>pol</strong>ated<br />

Da<br />

Notes:<br />

C = (PPM-,& Y K x (M&J I1000<br />

C: vspar concentration (mgfl)<br />

PPMww: FID reading (PPM)<br />

K: numberofmrbon atoms in calibration gas<br />

(1 in methane)<br />

TH: total hydrocarbons calculated ss gasoline<br />

GRO)<br />

percent water vapor by volume 0.003<br />

SVE Stack pipe diameter 4<br />

Q=(l-B)xVxAx(P/P~)xCTsmlT)<br />

(1: vsporflowale (SCFM)<br />

8: percent vaster vspor in flowstream<br />

V: vapor velocity (ftlmin)<br />

A: cross-sectional area (sq. fl)<br />

P: absolute pressure offlowstrsam (” Hg)<br />

Pm standard pressure (29.92” Hg)<br />

r: absolute temperature of Rowstream (degrees Rankine)<br />

T*. standard lempsmture (528 degrees Rankine)<br />

at 68 degrees F (from Peny’s handbook)<br />

* Estimated value due to malfunctionng instrument<br />

M=QxCx0.0895<br />

M: hydrocarbon recovery rate (lb/day)<br />

CM = [delta (blower meter houn)/24) * [(Mprevious + Mwrrent)/Z) + CMprevious<br />

Assumptions:<br />

Mg = 128 mgimg-mole<br />

Kg = 24.07 dsm”3/l(r6 gm -mole<br />

B = 0.003 from Perry’s Chemical Handbook<br />

A = 0.0873 sq. ft<br />

Hpff-nw Updated: 1 l/10/00 Page 2 of 2


0<br />

A<br />

HPFF North West VOC Pounds Removed and Costs<br />

700 I-.<br />

$30.00<br />

600<br />

500<br />

$20.00<br />

4<br />

5<br />

0<br />

400<br />

n 300<br />

$15.00 5<br />

rs<br />

200<br />

$10.00<br />

100<br />

$5.00<br />

0<br />

Now99 De&99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 Ott-00<br />

Past 12 Months<br />

60.00<br />

- VOC Pounds -+- Cost/ Pound Removed -Average -Average<br />

Task Order 14 - Project 920764 Camp Lejeune MCB, NC October 31,200O


HPFF North West Cumulative VOC Pounds Removed<br />

lO,OO(<br />

a<br />

Nov-99 Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00<br />

Past 12 Months<br />

-Cumulative<br />

Pounds Removed<br />

Task Order 14 - Project 920794 Camp Lejeune MCB, NC October 31, <strong>2000</strong>


Cumulative Mass of Voli ydrocarbons Discharged<br />

Air Sparg I Soil Vapor Extraction System<br />

MCB Camp Lejeune - Hadnot Point Fuel Farm, South East<br />

SVE Stack<br />

03/30/99 7:30<br />

04/01/99 10:30<br />

04/02/99 IO:00<br />

04/09/99 8:00<br />

04/16/99 9:30<br />

w/23/99 8:30<br />

05/06/99 10%<br />

05/13/99 8:30<br />

05/19/99 8:30<br />

06/02/99 11:00<br />

06/09/99 1 I:00<br />

06118199 8:50<br />

06/24/99 12~30<br />

07/07/QQ 13:oo<br />

07/15/99 II:00<br />

07/21/99 9:oo<br />

08/02/99 950<br />

08/12@9 9:35<br />

08/19/99 lo:00<br />

08125199 7:30<br />

09/01/99 13:45<br />

09/10/99 13:45<br />

09/l 3/99 9:30<br />

10/06/Q9 12:30<br />

10/14/SS 9:19<br />

10/22/99 8:Ol<br />

10/28/99 13:ll<br />

11/04/99 12:oo<br />

11/12/99 752<br />

11116199 9:28<br />

11122199 IO:30<br />

12/02/99 IO:13<br />

12108199 11:33<br />

213<br />

236<br />

304<br />

402<br />

485<br />

563<br />

584<br />

652<br />

937<br />

1005<br />

1105<br />

1251<br />

1505<br />

1626<br />

1766<br />

2055<br />

2295<br />

2463<br />

2607<br />

2849<br />

3012<br />

3395<br />

3584<br />

3734<br />

3877<br />

4045<br />

4237<br />

4333<br />

4477<br />

4588<br />

4730<br />

6776<br />

5654<br />

17907<br />

13147<br />

4555<br />

10391<br />

8535<br />

3671<br />

2465<br />

2109<br />

9103<br />

2514<br />

1934<br />

2277<br />

1520<br />

2236<br />

2459<br />

4606<br />

5174<br />

10105<br />

1500<br />

1223<br />

3119<br />

1469<br />

961<br />

647<br />

14118<br />

8360<br />

11248<br />

2002<br />

1078<br />

3895<br />

1300<br />

6600<br />

6300<br />

6200<br />

600<br />

2200<br />

800<br />

7200<br />

7600<br />

7500<br />

3300<br />

6100<br />

5800<br />

4300<br />

5800<br />

5900<br />

6900<br />

6400<br />

6800<br />

7200<br />

7000<br />

7000<br />

6700<br />

6900<br />

6400<br />

6600<br />

7700<br />

6700<br />

6600<br />

7000<br />

544<br />

567<br />

567<br />

569<br />

544<br />

548<br />

546<br />

566<br />

572<br />

592<br />

543<br />

581<br />

587<br />

582<br />

588<br />

583<br />

584<br />

584<br />

577<br />

578<br />

572<br />

570<br />

574<br />

576<br />

552<br />

565<br />

564<br />

567<br />

566<br />

588<br />

584<br />

447<br />

2176<br />

2077<br />

2037<br />

209<br />

777<br />

284<br />

2431<br />

2717<br />

1341<br />

2316<br />

2180<br />

1766<br />

2297<br />

2295<br />

2607<br />

2418<br />

2748<br />

2700<br />

2709<br />

2432<br />

2201<br />

2131<br />

2147<br />

2509<br />

2172<br />

2143<br />

2188<br />

2140<br />

36.03<br />

30.07<br />

95.23<br />

69.91<br />

24.22<br />

55.26<br />

45.39<br />

19.52<br />

13.11<br />

11.22<br />

48.41<br />

13.37<br />

10.28<br />

12.11<br />

8.08<br />

11.89<br />

13.08<br />

24.49<br />

27.51<br />

53.74<br />

7.98<br />

6.50<br />

16.59<br />

7.81<br />

5.11<br />

4.50<br />

75.08<br />

44.46<br />

59.81<br />

10.65<br />

5.73<br />

6900 589 2153 20.71<br />

.^ _^<br />

1440.44 6,391.94<br />

5854.54 g-887.45<br />

17699.32 43.255.41<br />

12743.31 105,409.12<br />

454.10 128,229.64<br />

3843.79 135.213.72<br />

1152.29 137,399.51<br />

4248.29 145,050.33<br />

3343.36 190,125.75<br />

2727.50 198,726.14<br />

5809.11 216,510.73<br />

2771.59 242,610.35<br />

2006.58 2679894.87<br />

1914.06 277s778.15<br />

1662.02 288,208.39<br />

2442.26 312,919.57<br />

3050.74 340,384.56<br />

5300.31 369.613.25<br />

6402.80 404,722.60<br />

13217.57 503$X1.97<br />

1927.64 555.072.24<br />

1577.10 557,335.66<br />

3610.01 595.374.49<br />

1539.16 615‘649.35<br />

974.54 823,504.67<br />

865.40 628.986.15<br />

16858.57 691,020.02<br />

8640.40 793,015.89<br />

11471.99 833,240.66<br />

2084.59 873,910.39<br />

1097.87 881,269.83<br />

3990.96 896.324.28<br />

9303.37 931.221.90<br />

Extra<strong>pol</strong>ated<br />

t<br />

Hpff-se Updated: 11/10/00 Page1 of3


Cumulative Mass of Voli> ydrocarbons Discharged<br />

Air Sparg I Soil Vapor Extraction System<br />

MCB Camp Lejeune - Hadnot Point Fuel Farm, South East<br />

SVE Stack<br />

01/12/00 13:23 5461 6397<br />

7200<br />

569<br />

34.02 7079.99 1,107.956.60<br />

01121100 9:35 5664 2082<br />

7200<br />

555<br />

2384<br />

11.07 2362.41 1,147,890.08<br />

01/27/00 IO:31 5729 1594<br />

6700<br />

643<br />

8.48 1720.28 1,153,418.73<br />

02/01100 IO:01 5826 1733<br />

6600<br />

544<br />

2230<br />

9.22 1838.99 1,160,611.42<br />

02/04/00 10:15 5893 2017<br />

6600<br />

597<br />

2032<br />

10.73 1950.34 1,165,900.70<br />

02/07/00 $55 5961 1423<br />

7100<br />

614<br />

2125<br />

7.57 1439.23 1,170,702.60<br />

02/11IOO IO:23 6051 1616<br />

6200<br />

614<br />

1856<br />

8.59 1427.25 1,176,077.26<br />

02/15/00 13:53 6146 1442<br />

7000<br />

608<br />

2116<br />

7.67 1452.10 1.181,775.97<br />

02/18/00 12:41 6201 880<br />

7100<br />

585<br />

2230<br />

4.68 934.16 1,184,510.22<br />

02/25/00 14:39 6352 516<br />

7300<br />

586<br />

2289<br />

2.74 562.23 1,189.217.60<br />

03/07/M) 12:50 6557 404<br />

6700<br />

587<br />

2098<br />

2.15 403.32 1,193,341.30<br />

03/13/00 15:30 6660 1000<br />

6895<br />

564<br />

2170<br />

5.32 1032.66 1,198,422.68<br />

03Lmoo 900 6864 4372<br />

6800<br />

584<br />

2140<br />

23.25 4452.58 1,219,734.97<br />

03/29/00 955 7029 369<br />

7952<br />

593<br />

2464<br />

1.96 432.80 1,236,528.46<br />

04/07/00 10:30 7245 550<br />

6900<br />

589<br />

2185<br />

2.92 571.84 1,241,049.31<br />

04/12/00 7:30 7362 1459<br />

6700<br />

627<br />

1978<br />

7.76 1373.66 1,245,791.47<br />

04/18/00 IO:00 7508 2246<br />

7043<br />

593<br />

11.94 2354.21 1,257.130.41<br />

04128/00 7:30 7745 1205<br />

611<br />

2097<br />

6.41 1202.75 1,274,692.89<br />

05/04/00 IO:00 7820 25<br />

571<br />

1541<br />

0.13 18.34 1.276,600.85<br />

05/11/00 9:oo 7988 1025<br />

592<br />

2458<br />

5.45 1199.04 1,280,861.69<br />

05/15/00 8:00 8106 674.4<br />

7800<br />

583<br />

2897<br />

3.59 929.78 1,286,095.04<br />

05/23/00 8:30 8274 1469<br />

7700<br />

611<br />

2626<br />

7.81 1835.70 1,295.774.22<br />

05/31/00 8:15 8466 4168<br />

7600<br />

596<br />

2696<br />

22.16 5347.86 1,324,508.46<br />

06/05/00 lo:30 8589 4062<br />

8300<br />

600<br />

2967<br />

21.60 5736.08 1,352,911.06<br />

06/14/00 9:13 8782 433<br />

8300<br />

604<br />

2.30 607.40 1,378,417.15<br />

06/23/00 15:37 9004 495<br />

9600<br />

599<br />

3437<br />

2.63 809.84 1.384,971.90<br />

06/27/00 12:47 9097 1910<br />

7800<br />

601<br />

2784<br />

10.16 2530.47 1,391,443.75<br />

07/03/00 II:16 9165 1000<br />

8100<br />

595<br />

2836<br />

5.32 1349.89 1,396,940.93<br />

07/12/00 13:53 9381 5701<br />

8100<br />

598<br />

2905<br />

30.32 7882.85 1,438,488.27<br />

07/21/00 12:03 9586 2023<br />

8000<br />

613<br />

10.76 2849.45 1,484,324.15<br />

07/26/00 II:16 9660 1292<br />

7800<br />

576<br />

3320<br />

6.87 2041.74 1,491,864.73<br />

08/10/00 12:24 9946 1282<br />

594<br />

4375<br />

8.82 2669.76 1,519,937.39<br />

08/16/00 9:15 10087 1263<br />

589<br />

2465<br />

6.72 1481.67 1.532,132.21<br />

08/22/00 lo:23 10121 1371<br />

588<br />

7.29 2120.94 1,534,684.06<br />

08/28/W IO:29 10265 1006<br />

590<br />

3239<br />

5.35 1551.01 1,545.699.93<br />

09/07/00 7:45 10446 992<br />

577<br />

5.28 1533.81 1,557,332.28<br />

OS/l 1100 1 I:32 10545 842<br />

586<br />

4.48 1380.98 1,563,344.05<br />

09/21/00 8:09 10716 847<br />

588<br />

4.50 1371.02 1,573,148.06<br />

09/28/OOj 10:36j 088i 1443 10700 571 31&J 7.67 2602.24 1,581,591.25<br />

FID estimatc<br />

FID estimate<br />

Hpff-se Updated: 1 l/10/00 Page 2 of 3


Cumulative Mass of Vol, Hydrocarbons Discharged<br />

Air Sparg I Soil Vi Extraction System<br />

MCB Camp Lejeune - Hadnot Point Fuel Farm, South East<br />

SVE Stack<br />

Extra<strong>pol</strong>ated<br />

Dati<br />

Notes:<br />

C = (PPM~) x K x (M&J / 1000<br />

C: vapor concentration (mgll)<br />

PPM- FID reading (PPM)<br />

K: number of carbon atoms in calibration gas<br />

(1 in methane)<br />

TH: total hydrocarbons calculated as gasoline<br />

(GRO)<br />

percent water vapor by volume 0.003<br />

SVE Stack pipe diameter 8<br />

Q = (1-B) x V x A x (P/P,)<br />

Q: vapor flowate (SCFM)<br />

x (T&-f)<br />

B: percent water vapor in Rowstream<br />

v: vapor velocity (ftlmin)<br />

A: cross-sectional area (sq. ft)<br />

P: absolute pressure of flowstream (” Hg)<br />

Pstd: standard pressure (29.92” Hg)<br />

T: absolute temperature of flowstream (degrees Rankine)<br />

Tm standard temperature (528 degrees Rankine)<br />

at 68 degrees F (from Peny’s handbook)<br />

* Estimated value due to malfunctionng instrument<br />

M=QxCx0.0895<br />

M: hydrocarbon recovery rate (lb/day)<br />

CM = [delta (blower meter hours)L.4]<br />

* [(Mprevious + Mcurrent)/Z] + CMprevious<br />

Assumptions:<br />

Mg = 126 mglmg-mote<br />

Kg = 24.07 dsm”3/10% gm -mole<br />

B = 0.003 from Per@ Chemical Handbook<br />

A = 0.3491 sq. ft<br />

Hpff-se Updated: 1 l/10/00 Page 3 of 3


A <br />

HPFF South East<br />

VOC Pounds Removed and Costs<br />

300,000<br />

_..<br />

$0.40<br />

250,000<br />

$0.35<br />

$0.30<br />

200,000<br />

$0.25<br />

4<br />

5 150,000<br />

:<br />

100,000<br />

$0.20<br />

$0.15<br />

$0.10<br />

50,000<br />

$0.05<br />

0<br />

I Nov-99 Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 J&O0 Aug-00 Sep-00 Ott-00<br />

Past 12 Months<br />

- VOC Pounds Removed t Cost! Pound Removed -Average -Average<br />

$0.00<br />

Task Order 14 - Project 920794 Camp Lejeune MCB, NC October 31,200O


HPFF South East<br />

Cumulative Pounds Removed<br />

600,000<br />

400,000<br />

200,000<br />

0,<br />

Nov-99 Dee99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00<br />

Past 12 Months<br />

-Cumulative<br />

Pounds Removed<br />

Task Order 14 - Project 920764 Camp Lejeune MCB. NC October 31. <strong>2000</strong>


cfive Log<br />

Hadnot Point Fiel Farm/Building 1115<br />

Task Order: 14<br />

Project Number: 920764<br />

1 1 1 SG 1116/98 ll/%l98 A N/A Free Product Investigation 3 N 1 $5,000 1<br />

2 SG 1219198 1219198 A N/A Concrete Slab Building 1111 3 IV 1 .-$O,UUII<br />

3 SC, -- 17/9/98 .- .-.-- 12/9ws .-- -.-- A N/A T&D of Free Product Produced During AFVR Events. 90 N 1 $2,5OC<br />

t<br />

-- -_-<br />

4 SG 5/19/99 5/19/99 i N/A IAbandon Well 11-15-16 1 10 1 N 1 12,500<br />

TDI SG 717199 7l7i99 A N/A Ilnvcxtinata .“.““..J’.” n&-w “““. rnmnlaintc ““...v*“....” RIlildinn ““..“...= 1101 . .-. I 30 I N 1 $5,000<br />

TD2 SG 12/16/99 N/A R 12/17/9Q install Trench alongside east wall of Building 1101 - will be awarded as a Modification 45 N $551000<br />

(-I'D)003 SG 114/00 N/A R N/A Apply acrylic caulking to cracks in floor of Building 1101 7 N $2,500<br />

7 hl a232 nnn<br />

(TD)004 SG 115100 IWO0 A l/5/00 Install 3 new monitoring wells at we-’ SI ena --’ or -< cwatng ---“_l’-- *rnr I IV I<br />

~“,“YY<br />

(TD)005 SG 1112100 N/A R N/A Install trench around remainder of LU,,u,lly 2, #a&VI 11<br />

I Iv l-l1 a<br />

;0 ii TBoi -I<br />

(To)006 SG 6l2OlOO N/A R N/A Additional Fuel Line Investigation near Ash Street and Building I( 1115 I I .-<br />

!i N !%I _. o.ooc .,_-<br />

(TD)007 SG 6/20/00 N/A R N/A Investigate purchase of monitoring equipment for Building 1101 30 i $3,500)<br />

(-l-D)008 sx Cil3nlnn P N/A Additional fingerprinting and soil analyses 5 N $1,000<br />

WV “.““1””<br />

.--.<br />

I<br />

I<br />

(TD)OOQ SC, _- l nI75lOO -.-. 1 Q/26/00 1 A 1 NiA IAdd Bldo - .” 1068 ___ to ~~ dailv , samoling , list. Procure readings from suspect sampling points. 30 N $3,000<br />

VR-09 TD 9/2L.,- slnn , I Ql28Inn -.- -,-- I , A 1 , N/A ..~ ,---. /Cost reduction -..-._ for analvses , I of benzene from coconut charcoal tubes due to favorable pricing. 90 N ($6,345)<br />

(TD)OlO TD iommn I I nl23mn I A I N/A lfie-caulk ’ ioints in buik-tinnc 1 IX8 11 IVI am-i I 115 I 3 I N I $1.550 I<br />

_- -. --. - -<br />

.“‘~Y l”““, I I”” I..” . I .”<br />

.~~<br />

I ~~ ~~ J-<br />

I x-I I ii16100 I NIA I Procure a samele from soil stockpile alona drainage ditch and analyze for disposal criteria I 10 I N 1 $550 I<br />

”<br />

Chanae Type:<br />

TD - Technical Directive<br />

SG - Scope Growth<br />

SR - Scope Reduction<br />

Status:<br />

A - Approved<br />

P - Pending<br />

R - Rejected<br />

W-Withdrawn<br />

Page 1


LA<br />

IV RAC FIELD FORM<br />

Contract No, N62470-97-D-5000<br />

Task Order No. 0014<br />

Title/Location Additional Caulking<br />

Buildings 1068, 108 and 1115<br />

DISTRIBUTION:<br />

x<br />

- -- ROrCC<br />

-x<br />

x- RPM<br />

-- x COTR<br />

OTHER: E MD<br />

CONTRACTING OFFICEFUSPECIALIST (TD’S)<br />

FILE: 920764<br />

Form No. (TD) 090 Data: Oct. 23,ZOOO Respond ‘NLT: NA<br />

Initiated By: XX Navy 0 C0ntr6ct0r 0 Other<br />

X Technical Direction c1 RF1 0 Variance Request 0 Overtime Authorization<br />

Descrlptlon<br />

(Include location 8 attachments If necessary):<br />

Re-caulk joints in Buildings 1068,1108 and 1115 6s Per the &ached <strong>report</strong>.<br />

Drawing Ref:<br />

1 Sp6c.qRef.<br />

Explanation/Recommendation: _ -<br />

Work to be petformed using existing funding in the TO ’<br />

Fee Bearing<br />

xx Yes No<br />

Associated Cost: $1,550.00<br />

WBS Code6 Affsctod: 40500000<br />

New<br />

Existing xx<br />

Work to be pe!formed using existing funding within the<br />

task order.<br />

/r<br />

w Yes H No<br />

Schedule lmpoct (assume response by ‘NLT date)<br />

Norm<br />

0 Increase in Time<br />

ODecrease in Time<br />

Appro%imate Calendar Days: 3<br />

I<br />

Contractor:<br />

Date<br />

Site Representative: \ Fi<br />

met Managec James A. Dunn, Jr, Originator) !/ Oct. 23,ZODO<br />

\I V<br />

Reviewer Comments, In&l RFI Respon66:<br />

Task Order Modification to Follow (contract action) XX No Tesk Order Modification Required


LANTDIV RAC FIELD FORM<br />

l3l~UnON:


MONTHLY PROGRESS REPORT<br />

Contract N62470-97-D-5000<br />

Task Order 0033<br />

OHM Project 780790<br />

October 31,200O<br />

Operate and Maintain Three Treatment Plants<br />

And Four Air Sparge / SVE Systems<br />

MCB.Camp Lejeune, North Carolina<br />

Project Manager:<br />

6l-&i-<br />

James A. Dunn, Jr., P.E.<br />

Approved<br />

By:<br />

Roland Moreau, P.E.<br />

Program Manager<br />

Hard Copies Distributed<br />

COTR:<br />

Karen Wilson (757) 322-4817<br />

Wilsonke@efdlant.navfac.navy.mil<br />

RAC CM:<br />

Greg Hedley<br />

(757) 396-5121<br />

Hedlevas~efdlant.navfac.navy.mil ext* 383<br />

Project Controls Manager:<br />

Linda Barberousse (757) 363-7190<br />

Lbarberousse@theitgroup.com<br />

Contract Files<br />

Scheduled Web Site Posting Date:<br />

November 22,200O<br />

ROICC:<br />

RPM:<br />

to:<br />

Brent Rowse<br />

Kirk Stevens / Lori Ruether<br />

1.0 PROJECT DESCRIPTION<br />

This Monthly Progress Report has been prepared to summarize the activities performed from October 1,200O to<br />

October 31, <strong>2000</strong>, as well as a summary of the work planned for the month of November <strong>2000</strong> by OHM<br />

emediation Services Corp., (OHM), on Task Order 0033 of the Navy-LANTDIV RAC Contract N62470-97-<br />

j-5000. This Task Order was signed on March 10, 1999.<br />

The remediation effort consists of:<br />

1. Relocation of the field offices to the rear of Lot 203 and the purchase of offices, equipment and vehicles.<br />

2. Operation and maintenance of the Hadnot Point North and South Plants for a period of two years.<br />

3. Operation and maintenance of the Lot 203 Groundwater Treatment Plant for a period of two years.<br />

4. Operation and maintenance of the Air Sparging and SVE systems at TT-2477/78 and Berkley Manor 820<br />

for a period of two years and support in the NFA Requests for AS 822 and STT 69.<br />

5. FY 00 and FY 01 Site Management Plan and RAB Support.<br />

6. Administrative and field support services for a period of two years.<br />

7. Corrective actions as may be required during the course of two years of field operations.<br />

8. RCRA Closure of Buildings TP 452 and TP 463.<br />

The total current value of this task order including modifications is $3,039,712.00 exclusive of fee.<br />

2.0 WORK ACCOMPLISHED<br />

During the month of October <strong>2000</strong>, OHM has performed the following:<br />

1. Operated and maintained the Groundwater Treatment Plant at Lot 203 for the month experiencing 48<br />

hours of downtime due to changing the cartridge filters 8 times, pressure washing and cleaning the<br />

Polymax unit, backwashing the carbon cells, repairing the filter press feed pump, cleaning the mix tank<br />

and performing <strong>monthly</strong> maintenance items. Treated 12,046,100 gallons of groundwater and 425,000<br />

OHM Project 780790<br />

Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />

Page 1 of4<br />

October 3 1,200O


gallons of collected stormwater from Site 89 (see detailed operating <strong>report</strong> attached) [WBS 21000000 &<br />

21500000].<br />

2. Operated and maintained the Hadnot Point North Plant for the month experiencing 12 hours of<br />

downtime. Changed the filters 11 times and performed <strong>monthly</strong> maintenance on the plant. Treated a<br />

total of 199,299 gallons of groundwater and 16,620 gallons of produced fluids from AFVR events, SVE<br />

systems and Site 54 (see detailed operating <strong>report</strong> attached) [WBS <strong>2000</strong>0000 & 20500000].<br />

3. Operation and maintenance of the air sparging/SVE units at BM 820 and TT 2477/78 was conducted<br />

under this T.O. Blower unit at TT 2477 spun a shaft and the unit was repaired onsite. Total downtime<br />

was two weeks. (See detailed operating <strong>report</strong> attached.)[WBS Codes 9100000 and 91500000]<br />

4. Conducted background sampling of soils and potable water for closure of Buildings TP 452 and TP 463.<br />

[WBS Code 50000000]<br />

5. Continued preparation of the final design of the system expansion at TT 2477 to remediate the area of<br />

contamination associated with Building TT 2453. [WBS Code 91401000].<br />

3.0 WORK PLANNED<br />

During the month of November <strong>2000</strong>, OHM is scheduled to perform the following:<br />

1. Conduct normal operation and maintenance of the Lot 203 and North Plant systems and the operation<br />

and maintenance of the BM 820 and TT 2477/78 air sparge/SVE systems.<br />

2. Continue preparatory activities for the RCRA facility closures.<br />

3. Submit results of the activities conducted at TT 2477.<br />

PROBLEMS AND SOLUTIONS<br />

,A0<br />

luring the month no new problems arose and all previous issues have been satisfactorily resolved.<br />

5.0 COST SCHEDULE SUMMARY<br />

Cost Summarv<br />

The following<br />

attached.<br />

is a summary of the costs associated with this task order.<br />

A detailed performance <strong>report</strong> is<br />

T.O. ceiling amount (without fee)<br />

Approximate cost through October <strong>2000</strong><br />

Approximate cost for October <strong>2000</strong><br />

Remaining funds<br />

Estimated cost to complete<br />

Current estimated cost at completion<br />

Prior period estimate at complete<br />

Physical % complete<br />

Financial % complete<br />

3,039,712.00<br />

1,528,255.00<br />

115,468.OO<br />

1,511,457.00<br />

1,508,161.00<br />

3,036,416.00<br />

3,037,171.00<br />

55.5<br />

50.3<br />

We expect that the project will be completed within budget.<br />

hedule Summarv<br />

Original contract completion date<br />

Current contract completion date<br />

06/30/00<br />

09/30/01<br />

OHM Project 780790<br />

Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />

Page 2 of4<br />

October 3 1,200O


Prior period 0 & M completion date<br />

Current period 0 & M completion date<br />

:F-<br />

0.0 NON-COMPLIANCE CHECK OFF LIST<br />

No non-compliance issues have been associated with this task order.<br />

09/30/01<br />

09/30/01<br />

7.0 WASTE MATERIALS TRACKING<br />

No waste materials were generated during the month.<br />

8.0 GOVERNMENT MATERIALS TRACKING<br />

All government owned materials (trucks, offices and equipment) have been properly documented and are being<br />

tracked.<br />

9.0 MODIFICATION LOG<br />

2<br />

3<br />

4<br />

5<br />

6<br />

Description<br />

O&M at Treatment<br />

System and provide<br />

Quarterly Reports of<br />

Status for 29 weeks past<br />

current expiration<br />

Provide continued O&M<br />

for an additional 23 weeks<br />

and relocate to rear of lot<br />

203.<br />

O&M Extension through<br />

09/3 o/o0<br />

Delete all cost associated<br />

with installing new<br />

telephone cable along<br />

Piney Green Rd.<br />

Demolish Building TP-<br />

45 1 and TP-463<br />

Continue O&M Activities<br />

for additional 12 months<br />

Install 750’ of fence to<br />

separate the front from the<br />

rear of Lot 203<br />

Award Contract<br />

Date End Date Cost Value Award Fee<br />

03/10/99 1 O/20/99 $568,061 .OO $25,454.00<br />

05/l 3199 N/A $0.00 $0.00<br />

Total Mod<br />

Value<br />

$593,515.00<br />

$0.00<br />

06/03/99 06/30/00 $973,545.00 $45,291 .OO $1,018,836.33<br />

09/03/99 06/30/00 -$25,121 .OO -$979.00 -$26,100.00<br />

02/l 2/00 06/30/00 $191,582.00<br />

06/ 16/00 04/30/o 1 $1,322,055.00<br />

06/ .6/00<br />

$9,590.00<br />

-<br />

$7,667.00<br />

-<br />

$64,692.00<br />

-<br />

$311.00<br />

-<br />

$199,249.00<br />

$1,386,747.00<br />

$9,901 .oo<br />

L<br />

10.0 WORK DIRECTIVE LOG<br />

he current work directive log is attached.<br />

Totals<br />

$3.039.712.00 $142,436.00 $3,182,148.33<br />

OHM Project 780790<br />

Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />

Page 3 of 4<br />

October 3 1,200O


11.0 ATTACHMENTS<br />

F”*.<br />

i<br />

‘erformance Report (1 page)<br />

Performance Curve (1 page)<br />

Schedule (1 page)<br />

Work Directive Log (1 page)<br />

Work Directive (TD)OOS (1 page)<br />

Treatment Plant Reports<br />

-Lot 203 (4 pages)<br />

-Site 78 (4 pages)<br />

POL Operating Reports<br />

-TT2477/78 (6 pages)<br />

-BM 820 (5 pages)<br />

OHM Project 780790<br />

Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />

Page 4 of 4<br />

October 3 1,200O


IT COtpOratiOn<br />

START DATE 01 MA<br />

FIN DATE 30APROl’<br />

performance<br />

Report<br />

WBS<br />

Code<br />

LbSCriptiOfl<br />

orig.<br />

Budg<br />

anty<br />

Qnt Curre Task lnst<br />

RW Qnty unit anty<br />

Task orig.<br />

% Budg<br />

Comp f<br />

5 current Earned Actual ETC Forecast Variance variance % Physl<br />

RW.l s J CPI Al from from Of %<br />

Adjust ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />

00000000<br />

TO Award<br />

1w<br />

0<br />

la, 56<br />

100<br />

loo<br />

1oowwo<br />

M6 Site Management<br />

Plan<br />

loo<br />

0<br />

loo %<br />

30<br />

20<br />

12390 0 12390 3717 3314 0.89 8048 11362 1028 -1026 0.4 a1<br />

15000000<br />

M6 Systems<br />

Optimization<br />

loo<br />

0<br />

IW %<br />

0<br />

0<br />

45237 0 45237 0 0 0.00 46237 45237 0 0 1.5 0.c<br />

<strong>2000</strong>0000<br />

M6 Operation<br />

of N 8 S<br />

10<br />

0<br />

103 %<br />

53<br />

63<br />

113668 0 113668 71611 29718 0.41 58112 87830 -25830 -25838 3.7 2.4<br />

20500000<br />

M6 Maintenance<br />

of N&S<br />

1CU<br />

0<br />

IW %<br />

63<br />

63<br />

990% 0 99886 62928 49960 0.79 50185 100146 259 259 3.3 2.1<br />

21000000<br />

M6 Operation<br />

of GWTP<br />

1Gl<br />

0<br />

1w 56<br />

63<br />

63<br />

192809 0 I 92809 121470 69287 0.57 109257 178545 -14264 -14264 6.3 4.c<br />

21500000<br />

M6 Maintenance<br />

of GWTP<br />

100<br />

0<br />

loo %<br />

ii3<br />

63<br />

172006 0 172006 108364 84633 0.78 91118 175751 3745 3745 5.7 3.8<br />

22500000<br />

M6 Monthly Sampling 9 Anaiys<br />

la,<br />

0<br />

100 36<br />

33<br />

33<br />

235276 0 235276 77641 76618 0.99 150647 227265 4KJ11 8011 7.7 2.6<br />

31500000<br />

O&M Bill Lot 203<br />

100<br />

0<br />

loo %<br />

0<br />

IW<br />

41105 0 41105 41105 0 0.00 46 46 -41059 -41059 1.4 0.c<br />

33000000<br />

Bio-Cell Batch Load Lot 203<br />

lea<br />

0<br />

loo %<br />

0<br />

IW<br />

2700 0 2700 2700 0 0.00 0 0 -27W -2700 0.1 0.C<br />

50000000<br />

M4 Demolish<br />

Bldgs TP4528463<br />

IW<br />

0<br />

loo %<br />

IO<br />

IO<br />

191582 0 191582 19156 19768 1.03 172070 191838 256 256 6.3 0.E<br />

66666666<br />

<strong>2000</strong> Restructuring Costs<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0 0 0 0 14623 0.00 -16416 -1793 -1793 -1793 0.0 OS<br />

70000000<br />

Move to Back of Lot 203<br />

loo<br />

0<br />

1w %<br />

IW<br />

loo<br />

78302 0 78362 78302 147484 1.68 0 147484 69182 69182 2.6 2.8<br />

70600100<br />

M7 Fence Install -Lot 203<br />

100<br />

0<br />

100 %<br />

100<br />

IW<br />

9566 0 9566 95% 5953 0.62 0 5953 -3613 -3613 0.3 0.:<br />

8WOOWO<br />

M6 Administration<br />

8 Support<br />

100<br />

0<br />

loo %<br />

6.3<br />

63<br />

1228756 0 1228756 774116 771305 1.00 497946 1269251 40495 40495 40.4 25.5<br />

9ocmooo<br />

Fuel<br />

loo<br />

0<br />

loo 56<br />

63<br />

63<br />

21703 0 21703 13673 15151 1.11 7736 22887 1184 1184 0.7 0.4<br />

91wo000<br />

M6 ASlSVE Maintenance 820/24<br />

loo<br />

0<br />

IW %<br />

63<br />

63<br />

137197 0 137197 86434 48948 0.57 85403 134431 -2766 -2766 4.5 2.8<br />

91400000<br />

Btdg 2455 System<br />

lnvestttati<br />

100<br />

0<br />

IW %<br />

IW<br />

100<br />

0 0 0 0 22829 0.00 0 22829 22829 22829 a0 0.C<br />

91401000<br />

M6 2455-Plume<br />

Delineation<br />

loo<br />

0<br />

loo %<br />

95<br />

95<br />

37692 0 37692 35807 49719 1.39 2164 51883 14191 14191 1.2 1.2<br />

91405000<br />

M6 Install AS/SVE at 2455<br />

loo<br />

0<br />

loo 56<br />

0<br />

0<br />

47910 0 47910 0 0 0.00 6owo GMXX) 12090 12090 1.6 0.c<br />

91500000<br />

M6 Operation<br />

of BM 82012477T<br />

1w<br />

0<br />

100 %<br />

63<br />

63<br />

237257 0 237257 149472 40659 0.27 130887 171547 -65710 -65710 7.8 4.:<br />

9<strong>2000</strong>000<br />

Well InstallationIAbandmt<br />

IW<br />

0<br />

1w 56<br />

17<br />

17<br />

45873 0 45873 7798 6942 0.89 36742 37684 -8189 -8189 1.5 0.2<br />

92500000<br />

M6 Equipment Truck, B&hoe<br />

100<br />

0<br />

la, %<br />

63<br />

63<br />

49753 0 49753 31344 28029 0.89 22550 50576 825 825 1.6 1.c<br />

98016000<br />

M6 Par Diem/Lodging<br />

IW<br />

0<br />

IW %<br />

95<br />

95<br />

39045 0 39645 37093 43315 1.17 2349 45&&l 6619 6619 1.3 I.2<br />

I 99999999<br />

TO Complete<br />

103<br />

0<br />

IW %<br />

0<br />

0<br />

3039712 0 3039712 1732299 1528255 0.88 1599161 3036416 a98 -3295 100.0 55.!<br />

3039712 0 3939712 1732299 1526255 0.99 1566161 3039416 3299 -3296 100.0 55.f


Task Order 33 Cost Performance Curve<br />

3500<br />

3000<br />

Time Now 11/3/00 -+<br />

2500<br />

<strong>2000</strong><br />

1500<br />

1000<br />

500<br />

0<br />

Physical % Complete = 55.5<br />

Financial % Complete = 50.3<br />

Jul-00 Aug-00 Sep-00 Nov-00 Dee-00 Jan-01 Feb-01 Mar-01 Apr-01<br />

Time in Months<br />

I +RevBaseline - - - Actual --Ir #Earned -- Forecast 1<br />

I


dive Log<br />

Continued O&b - One Year<br />

Task Order: 33<br />

Project Number: 780790<br />

Costs are a Rough Order of Magnitude (ROM). It is not actual cost, nor is it a final change request value.<br />

, 11/10/00<br />

3 impacts<br />

WDI TD 4128199 4128199 A N/A Relocate Offices 180 N $100,000<br />

(WD)OOl SG 7127199 7127199 A N/A Plug &Abandon Wells 360 N $5,000<br />

(TD)OOl SG 8/I 7199 8117199 A N/A Increase Size of Waterline 15 N $8,000<br />

(TD)004 SG 1 on199 10/20/99 A N/A Fencing Repairs 30 N $23,000<br />

(TD)005 TD 1 Ill o/99 II/10199 A N/A Procure groundwater samples from all monitoring wells and adjacent to remedial system. 30 N $12,000<br />

(TD)006 TD 1 Ill 0199 ll/lOl99 A N/A Procure groundwater samples from all monitoring wells and adjacent to remedial system. 30 N $1,500<br />

(TD)007 TD 11/10/99 II/IO/99 A N/A Remove debris (concertina wire and shingles)and install signs. 30 N $12,700<br />

(TD)008 TD 1 O/l 9100 10/20/00 A N/A ‘rovide drums for NFESC subcontractor at Site 88 (Building 25) and analyze contents for dispos; 60 N $8,000<br />

Chanae Tvpe:<br />

TD - Technical Directive<br />

SG - Scope Growth<br />

SR - Scope Reduction<br />

Status<br />

A-Approved<br />

P - Pending<br />

R - Rejected<br />

W-Withdrawn<br />

Page1


Site 2477 Updated: 1 l/10/00 Page 1 of 4<br />

OUTPUT TABLE Cumulative hIa& olatile Hydrocarbons Discharged<br />

Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />

MCB CAMP LEJEUNE -l-r-2477/78<br />

IO/IO/97 II:32<br />

IO/IO/97 1422<br />

10/10197 17:oo<br />

10114i97 14:22<br />

10/14/97 17:oo<br />

10/15/97 8:30<br />

10/15/97 12:lO<br />

10/15/97 13:oo<br />

10/15/97 14:30<br />

10/16/97 11:15<br />

10/18/97 8:49<br />

10/18/97 13:30<br />

10/18/97 15:20<br />

10/20/97 9:45<br />

10/21/97 14:20<br />

10/22/97 7:30<br />

10/23/97 I 11:20 I<br />

lOi 8:43<br />

11/04/97 8:26<br />

11/05/97 12:oo<br />

11/07/97 1345<br />

11/10/97 9:oo<br />

11/10/97 15:30<br />

11/12/97 IO:20<br />

11119197 9:oo<br />

11119/97 9:oo<br />

12/09/97 10:41<br />

12/19/97 10:22<br />

01/07/98 8:30<br />

01/07/98 12:30<br />

01112/98 IO:20<br />

01112lS8 II:00<br />

01/21/98 12:25<br />

02/04/98 12~40<br />

02/13/98 14:30<br />

02/23/98 Ii:30<br />

03/13/98 II:30<br />

03/17/98 1:30<br />

03/25/98 12:50<br />

04/07/98 14:30<br />

04/15/98 13:30<br />

04/24/98 13:OO<br />

06/30/98 8:30<br />

06/30/98 12:30<br />

07/10/98 12:OO<br />

07/10/98 I%30<br />

07/17/98 9:30<br />

07/17/98 13:OO<br />

07/21/98 1O:W<br />

07/21/98 13:OO<br />

08/05/98 IO:30<br />

08/05/98 13:30<br />

08/12/98 1O:W<br />

08/12/98 13:30<br />

08/22/98 9:w<br />

08/22/98 12:30<br />

i 10<br />

10 58<br />

13 30<br />

15 58<br />

18 30<br />

33 85<br />

34 40<br />

35 40<br />

36 135<br />

39 44<br />

53 30<br />

58 37<br />

60 46<br />

91 40<br />

102 40<br />

119 60<br />

143<br />

236 962<br />

401 121<br />

429 561<br />

453 151<br />

525 388<br />

526 232<br />

568 408<br />

166<br />

1%<br />

577 168<br />

739 131<br />

929 55<br />

933 123<br />

1051 15<br />

1052 3<br />

1268 16<br />

1521 17<br />

1715 12<br />

1649 76<br />

2165 18<br />

2262 26<br />

2333 1271<br />

2764 571<br />

2959 70<br />

3170 120<br />

4424 54<br />

4428 38<br />

4669 52<br />

4671 57<br />

4840 52<br />

4843 55<br />

4933 51<br />

4936 50<br />

5200 15<br />

5203 12<br />

5365 41<br />

5366 37<br />

5604 14<br />

5607 37<br />

4500<br />

4500<br />

4500<br />

4500<br />

4500<br />

4500<br />

4000<br />

4000<br />

4000<br />

5000<br />

4000<br />

3900<br />

4000<br />

5000<br />

5000<br />

45W<br />

4900<br />

4800<br />

4500<br />

4800<br />

5000<br />

5000<br />

4700<br />

4200<br />

3600<br />

65W<br />

4600<br />

5000<br />

4300<br />

4600<br />

6400<br />

7000<br />

7100<br />

7000<br />

7100<br />

6900<br />

7800<br />

7100<br />

7100<br />

7000<br />

7900<br />

7700<br />

79M)<br />

7600<br />

7900<br />

7800<br />

79w<br />

8000<br />

7500<br />

7lW<br />

7500<br />

7100<br />

7400<br />

6300<br />

552<br />

560<br />

560<br />

560<br />

560<br />

547<br />

546<br />

546<br />

542<br />

535<br />

540<br />

548<br />

548<br />

542<br />

553<br />

527<br />

527<br />

527<br />

527<br />

545<br />

545<br />

531<br />

532<br />

530<br />

519<br />

519<br />

513<br />

526<br />

540<br />

547<br />

523<br />

531<br />

521<br />

517<br />

528<br />

539<br />

525<br />

520<br />

538<br />

553<br />

552<br />

542<br />

544<br />

556<br />

565<br />

565<br />

545<br />

558<br />

551<br />

557<br />

551<br />

554<br />

558<br />

567<br />

643 0.053<br />

831 0.308<br />

831 0.160<br />

831 0.308<br />

831 0.160<br />

850 0.346<br />

757 0.213<br />

757 0.213<br />

763 0.718<br />

966 0.238<br />

765 0.158<br />

738 0.197<br />

754 0.244<br />

954 0.213<br />

934 0.213<br />

883 0.319<br />

962<br />

942 5.114<br />

883 0.642<br />

910 3.090<br />

948 0.802<br />

974 1.956<br />

914 1.231<br />

818 2.170<br />

728 0.999<br />

1277 0.696<br />

880 0.295<br />

945 0.655<br />

850 0.078<br />

895 0.017<br />

1270 0.085<br />

1399 0.093<br />

1390 0.062<br />

1342 0.414<br />

1398 0.094<br />

1372 0.139<br />

1499 6.759<br />

1327 3.036<br />

1329 0.372<br />

1335 0.638<br />

1501 0.287<br />

1431 0.202<br />

1445 0.277<br />

1388 0.303<br />

1498 0.277<br />

1445 0.292<br />

1482 0.271<br />

1485 0.266<br />

1407 0.080<br />

1325 0.064<br />

1389 0.218<br />

1294 0.197<br />

551 1388 0.074<br />

565 IlW ".1YI<br />

4.0<br />

22.9<br />

11.9<br />

22.9<br />

11.9<br />

26.3<br />

14.4<br />

14.4<br />

49.0<br />

20.4<br />

10.8<br />

13.0<br />

16.5<br />

18.2<br />

17.8<br />

25.2<br />

431.2<br />

50.8<br />

251.7<br />

68.1<br />

170.5<br />

100.7<br />

158.9<br />

64.9<br />

79.5<br />

23.2<br />

55.4<br />

5.9<br />

1.4<br />

9.6<br />

11.6<br />

7.7<br />

49.7<br />

11.7<br />

17.0<br />

906.5<br />

360.6<br />

44.3<br />

76.2<br />

38.6<br />

25.9<br />

35.8<br />

37.7<br />

37.1<br />

37.8<br />

35.0<br />

35.3<br />

10.0<br />

7.6<br />

27.1<br />

22.6<br />

9.2<br />

ZO.3<br />

SVE Field<br />

1.6 SVE Field<br />

3.5 SVE Field<br />

4.9 SVE Field<br />

6.8 SVE Field<br />

19.1 SVE Field<br />

20.0 SVE Field<br />

20.5 SVE Field<br />

22.5 SVE Field<br />

26.3 SVE Field<br />

35.4 SVE Field<br />

37.7 SVE Field<br />

38.9 SVE Field<br />

61.6 SK/AS Fields 18<br />

69.7 SVVAS Field<br />

85.1 SVE!AS Field<br />

97.7 SK/AS Field<br />

936.5 SVEIAS Field<br />

2589.2 SVE Field<br />

2762.8 SVE Field<br />

2925.8 notrecordc<br />

3283.7 SVUAS Field<br />

3289.4 SVEIAS Field<br />

3516.6 SK/AS Field<br />

2185.5 SVEIAS Field<br />

2185.5 SK/AS Field<br />

2741.1 4 additional SVOAS wells on. SVElAS Field<br />

3228.4 SVOAS Field<br />

3634.9 SVEIAS Field<br />

3641.5 SVEIAS Field<br />

3792.1<br />

3792.2<br />

3841.6<br />

3953.3<br />

4031.2<br />

4191.4<br />

4595.7<br />

4653.8<br />

6019.8<br />

17397.9<br />

19043.0<br />

19572.8<br />

22572.5<br />

22577.9<br />

22887.4<br />

22890.5<br />

23153.6<br />

23158.3<br />

23296.7<br />

23301.1<br />

23550.7<br />

23551.8<br />

23668.8<br />

23671.9<br />

23829.5<br />

Field 1<br />

Field 1<br />

Field #<br />

Field I<br />

Field #<br />

Field #<br />

Field I


Site 2477 Updated: 11110100 Page 2 of 4<br />

OUTPUT TABLE Cumulative Ma.. olatile Hydrocarbons Discharged<br />

AirSparging(AS)/SoilVaporExtraction<br />

(SVE).System<br />

MCBCAMPLEJEUNE-l-r-2477178<br />

SVE Stack<br />

__._ -.__<br />

09/02/981 lid<br />

09/l 3196 8:45<br />

09/13/96 12:10<br />

09/19/98 9:35<br />

09/19/08 13:30<br />

0912398 11:45<br />

09/25/98 15105<br />

09/30/96 9:30<br />

09/30/98 13:OO<br />

10/09/96 9:25<br />

IO/IO/98 8153<br />

10/15/98 lo:15<br />

10115198 14:12<br />

10/20/98 1 I:45<br />

10120196 1435<br />

10/26/98 9:10<br />

10/28/98 13:30<br />

11/13/98 12:OO<br />

11/13/98 15:lO<br />

11/18/Q8 13:50<br />

II/W98 I 15:30 I<br />

12/10/98 11:35<br />

12/10/98 14:00<br />

12/14/98 0:25<br />

12/14/98 11:55<br />

12/21/98 IO:20<br />

12l22l98 0:50<br />

01/06/99 a:50<br />

01/w/99 1205<br />

01/15/0@ 1245<br />

01/19/09 15:45<br />

01/20/99 9:w<br />

01/20/99 IO:55<br />

01/25/o@ 12:10<br />

01/25/O@ 14:25<br />

02/25/o@ IO:00<br />

03/03/09 1230<br />

03/06/99 9:oo<br />

03/12/90 7:30<br />

03/25/99 6:42<br />

04/13/00 1O:W<br />

04/21/09 12:w<br />

05/01/99 6:W<br />

05/05/99 s:30<br />

05/14/09 7:15<br />

05/18/99 1O:W<br />

05/27/99 11:OO<br />

08/04/00 11:oo<br />

5672<br />

5676<br />

5817<br />

5821<br />

5953<br />

5968<br />

0061<br />

6064<br />

6297<br />

6320<br />

6441<br />

6445<br />

6562<br />

6505<br />

6753<br />

6757<br />

6881<br />

6907<br />

6973<br />

6975<br />

7094<br />

7096<br />

7449<br />

7451<br />

7620<br />

7622<br />

7713<br />

7716<br />

7882<br />

7905<br />

8255<br />

8267<br />

8477<br />

8576<br />

8593<br />

8595<br />

8717<br />

8719<br />

6943<br />

0036<br />

9153<br />

9387<br />

9541<br />

9664<br />

9876<br />

9003<br />

10188<br />

10403<br />

10522<br />

10737<br />

10834<br />

11007<br />

11202<br />

ii<br />

32<br />

33<br />

25<br />

6<br />

23<br />

3<br />

33<br />

9<br />

19<br />

29<br />

26<br />

29<br />

27<br />

26<br />

12<br />

12<br />

24<br />

24<br />

23<br />

38<br />

20<br />

15<br />

0<br />

38<br />

26<br />

43<br />

125<br />

16<br />

26<br />

21<br />

3<br />

12<br />

12<br />

IO<br />

6<br />

3<br />

5<br />

2<br />

7<br />

5<br />

9<br />

10<br />

6<br />

.._<br />

7500<br />

7300<br />

6600<br />

2lW<br />

7000<br />

6300<br />

6000<br />

65W<br />

2900<br />

6100<br />

6000<br />

4900<br />

6000<br />

6100<br />

6100<br />

6000<br />

65W<br />

5100<br />

5600<br />

5600<br />

5000<br />

6700<br />

67W<br />

6400<br />

6700<br />

6400<br />

6500<br />

6000<br />

6600<br />

6100<br />

6900<br />

5700<br />

5400<br />

5400<br />

5900<br />

5700<br />

6100<br />

5800<br />

5700<br />

5900<br />

40#0<br />

57w<br />

5880<br />

5800<br />

5700<br />

64W<br />

5700<br />

6000<br />

5600<br />

5700<br />

5600<br />

5700<br />

6000<br />

556<br />

548<br />

561<br />

550<br />

555<br />

556<br />

561<br />

553<br />

556<br />

540<br />

537<br />

540<br />

555<br />

544<br />

544<br />

536<br />

552<br />

533<br />

526<br />

526<br />

528<br />

543<br />

541<br />

533<br />

541<br />

531<br />

535<br />

521<br />

529<br />

533<br />

642<br />

514<br />

513<br />

534<br />

540<br />

525<br />

538<br />

536<br />

539<br />

530<br />

558<br />

523<br />

531<br />

531<br />

542<br />

549<br />

535<br />

546<br />

531<br />

548<br />

460<br />

548<br />

558<br />

567<br />

460<br />

06/l l/991 9:30 11307<br />

W/19/991 12:30 11503 4 5400 557<br />

1394 0.175<br />

1377 0.170<br />

1253 0.175<br />

305 0.133<br />

1304 0.032<br />

1171 0.122<br />

1105 0.016<br />

1215<br />

530<br />

1168 0.175<br />

1155<br />

936<br />

1117<br />

1150<br />

1150<br />

1157 0.048<br />

1217 0.101<br />

969 0.152<br />

1096 0.138<br />

1100 0.154<br />

1155<br />

1275<br />

1280<br />

1241 0.141<br />

1260 0.138<br />

1246 0.061<br />

1256 0.W-l<br />

1190 0.128<br />

1329 0.128<br />

1163 0.122<br />

1316 0.202<br />

1146 0.106<br />

10.96 o.oao<br />

1045 0.040<br />

1129 0.202<br />

1122 0.138<br />

1172 0.226<br />

1118 0.665<br />

1093 0.082<br />

1151 0.136<br />

744 0.112<br />

1127 0.016<br />

1145 o.oe4<br />

1129 0.064<br />

1087 0.053<br />

1205 0.032<br />

1101 0.016<br />

1136 0.027<br />

1000 0.011<br />

1075 0.037<br />

1056 0.027<br />

1056 0.046<br />

1094 0.053<br />

0.032<br />

1wz “.“21<br />

21.9<br />

21.0<br />

10.7<br />

4.7<br />

3.7<br />

12.8<br />

1.6<br />

18.3<br />

5.0<br />

11.0<br />

13.4<br />

13.6<br />

15.2<br />

15.7<br />

15.8<br />

6.0<br />

7.2<br />

13.6<br />

15.2<br />

12.0<br />

23.8<br />

10.9<br />

7.8<br />

4.5<br />

20.4<br />

13.6<br />

23.7<br />

66.5<br />

8.1<br />

14.2<br />

7.4<br />

1.6<br />

6.5<br />

6.4<br />

5.2<br />

3.4<br />

1.6<br />

2.7<br />

1.0<br />

3.6<br />

2.5<br />

4.5<br />

5.2<br />

1.9<br />

23890.1 Field I<br />

23893.5 Field I<br />

23865.1 Field I<br />

23965.8 Field I<br />

24014.7 Field I<br />

24015.6 FieldI<br />

24019.4 Field#l, zero ppm asmethanedaiarecordc<br />

24019.4 Field% zero ppm as methanedata reuordt<br />

24100.6 Field 1<br />

24109.6 Field#2, no ppm as methane data giw<br />

24109.6 I Field#l,zero ppm asmethanedatarecordc<br />

24109.6 Field #2. zero ppm BS methanedate records<br />

24109.6 Field #l. zero mxn as methane data record<<br />

24109.6 Fiald#2, zero bpm asmethanedataremrdt<br />

24120.0<br />

24130.3<br />

24193.4<br />

24208.0<br />

24247.6<br />

24248.2<br />

24248.2<br />

24248.2<br />

24363.3<br />

24364.6<br />

24444.4<br />

24445.0<br />

24484.4<br />

24486.2<br />

24583.4<br />

24x01.0<br />

24854.1<br />

24858.8<br />

24912.4<br />

24963.7<br />

24975.8<br />

24977.4<br />

25206.7<br />

Field 1<br />

Field I<br />

Field I<br />

Field I<br />

Field I<br />

FieldI<br />

Field#<br />

Field 1<br />

Field1<br />

Field I<br />

Field+<br />

Field I<br />

Field1<br />

FieldI<br />

F&d I<br />

Field #<br />

Field I<br />

Field #<br />

Field 1<br />

Field d<br />

Field d<br />

Field1<br />

25209.6<br />

8loweroutfor repr<br />

25313.9 Blower Rep&d. Fields operating tczgeth<br />

25355.9<br />

25377.9<br />

25414.3<br />

25461.3<br />

25405.9<br />

25530.4<br />

25542.6<br />

25560.0<br />

25576.7<br />

25566.2<br />

25604.2 sampling duetoA/S fabrication & replaceme,<br />

25609.3<br />

25634.7<br />

25674.2<br />

25685.6 stack velocity or temperature field data give<br />

20603.4


OUTPUT TABLE Cumulative Ma’s &tile Hydrocarbons Discharged<br />

Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />

MCB CAMP LEJEUNE - -l-r-2477/78<br />

.<br />

07/05/00 14:oo 11665<br />

07108/00 13:oo 11060<br />

07/16/90 6:45 12151<br />

07/20/00 10:20 12243<br />

07/26/00 8:05 12385<br />

00103/80 6:20 12660<br />

08109199 IO:00 12705<br />

08/20/99 IO:18 12966<br />

08/23/09 lo:35 13037<br />

08/31/00 1150 13190<br />

10/28/90 920 14062<br />

11/05/09 11:oi 14088<br />

11/16/99 13:35 14134<br />

11/23/90 a:40 14292<br />

12/03/90 940 14460<br />

12/10/00 a:40 14460<br />

12/17/99 a:40 14460<br />

12/31199 9:40 14460<br />

01/09/W 8:49 14872<br />

01/28/W IO:18 15254<br />

02/03/w a:05 15353<br />

02/10/00 14:03 15526<br />

02/17/w 12:ll 15602<br />

02/27/w 12:oo 15032<br />

03102/w 14:w 16031<br />

03/06/00 13:oo 16173<br />

03/17/00 ii:20 16387<br />

03/24/w 10:22 16544<br />

03/26/W 030 16613<br />

04/06/00 1o:w 16853<br />

04/27/w 13:30 17321<br />

05/01/00 II:30 17405<br />

05/11/w 12:w 17621<br />

05/15/w 11:30 17666<br />

05/27/00 1O:W 17882<br />

@3/07/00 14:w 18142<br />

06/16/00 17:W 18361<br />

@6/20/W 12:16 18452<br />

06/20/00 11:57 18633<br />

07/05/00 12:25 18777<br />

07/14/00 16:45 18993<br />

07/17/W 13:21 19062<br />

07/28/00 15:lO 10306<br />

06/03/W a:47 10398<br />

08/l l/W 14:25 19505<br />

08/17/00 IO:05 10734<br />

08/23/W lo:07 10878<br />

o8/2o/w 9:40 10004<br />

00/20/w 1036 20107<br />

00/27/w 8:51 20281<br />

10/02/00 11:05 20409<br />

10131/00 11:05 20400<br />

4<br />

35<br />

0<br />

2<br />

27<br />

28<br />

12<br />

6<br />

I<br />

0<br />

1<br />

3<br />

2<br />

0<br />

7<br />

3<br />

2<br />

4<br />

2<br />

1<br />

6300<br />

6600<br />

5600<br />

6300<br />

6300<br />

5.300<br />

5800<br />

64W<br />

7wo<br />

6800<br />

4800<br />

6200<br />

5600<br />

6600<br />

3200<br />

5600<br />

3700<br />

3ow<br />

5100<br />

47w<br />

5100<br />

3900<br />

4400<br />

4200<br />

54w<br />

5200<br />

5600<br />

56W<br />

3000<br />

4909<br />

2169<br />

3260<br />

4298<br />

4050<br />

530<br />

2600<br />

4300<br />

5400<br />

3500<br />

5000<br />

3600<br />

3800<br />

3800<br />

3000<br />

6400<br />

6200<br />

8000<br />

7600<br />

7200<br />

7OOQ<br />

6700<br />

7500<br />

7200<br />

6700<br />

6100<br />

7500<br />

590<br />

585<br />

586<br />

561<br />

576<br />

568<br />

567<br />

571<br />

575<br />

565<br />

565<br />

564<br />

562<br />

556<br />

543<br />

540<br />

550<br />

551<br />

559<br />

460<br />

460<br />

460<br />

460<br />

544<br />

554<br />

535<br />

525<br />

524<br />

560<br />

546<br />

567<br />

568<br />

574<br />

556<br />

550<br />

585<br />

559<br />

569<br />

538<br />

571<br />

574<br />

585<br />

571<br />

570<br />

576<br />

582<br />

578<br />

572<br />

580<br />

578<br />

567<br />

581<br />

570<br />

577<br />

573<br />

577<br />

567<br />

560<br />

551<br />

566<br />

460<br />

980<br />

1161<br />

1131<br />

1050 0.021<br />

1057<br />

1150<br />

1258<br />

1244<br />

878<br />

1136<br />

1030<br />

1227<br />

600<br />

1002<br />

695<br />

563 0.166<br />

943<br />

693<br />

052<br />

753 0.046<br />

666<br />

828<br />

007<br />

084 0.010<br />

1021<br />

1023<br />

540<br />

011 0.144<br />

394<br />

596<br />

794 0.151<br />

738 0.062<br />

102<br />

471<br />

774 0.032<br />

954 0.008<br />

634<br />

893<br />

646<br />

675<br />

680 O.Wl<br />

705 0.005<br />

1141 0.016<br />

1109 0.011<br />

1409 0.002<br />

1352 0.037<br />

1306 0.016<br />

1254 0.011<br />

1200<br />

1344 0.021<br />

1313 0.011<br />

1217<br />

1144<br />

1365 0.005<br />

2.0<br />

9.4<br />

3.2<br />

0.8<br />

11.7<br />

10.7<br />

4.1<br />

2.2<br />

0.5<br />

0.1<br />

0.3<br />

1.6<br />

1.1<br />

0.3<br />

4.5<br />

1.0<br />

1.2<br />

2.6<br />

1.2<br />

0.6<br />

25722.3<br />

25722.3<br />

25722.3<br />

25722.3<br />

25722.3<br />

25728.7<br />

25735.6<br />

25735.8<br />

25735.6<br />

25735.6<br />

25735.6<br />

25735.6<br />

25735.6<br />

25735.8<br />

25735.8<br />

25735.8<br />

25735.8<br />

25744.7<br />

25775.6<br />

25775.6<br />

25775.6<br />

25775.6<br />

25775.6<br />

25775.6<br />

Blower down for repai<br />

Blower down for repai,<br />

Blower down for repail<br />

Blower down for repail<br />

25775.6<br />

25700.0<br />

25790.1<br />

25709.1<br />

25799.1<br />

25802.0<br />

25806.2<br />

25806.2<br />

25806.2<br />

25656.4<br />

25696.7<br />

25896.7<br />

25950.4<br />

25088.1<br />

25897.0<br />

25097.5<br />

26W1.7<br />

26014.1<br />

26014.6<br />

26014.6<br />

26014.6<br />

26014.6<br />

26014.7<br />

26016.2<br />

26022.1<br />

26034.2<br />

26038.1<br />

26060.4<br />

26072.6<br />

26085.1<br />

26088.6<br />

26096.2<br />

26105.4<br />

26108.4<br />

26108.4<br />

26110.1<br />

26110.1 System down for blower repail<br />

Notes:<br />

Site 2477 Updated: 11110100 Page 3 Of 4


OUTPUT TABLE Cumulative Mas, olattle Hydrocarbons Discharged<br />

Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />

MC9 CAMP LEJEUNE - TT-2477/78<br />

WE Field # 1 pipe diameter 6<br />

C=(PPtv&~)xKx@$MJ~lOOO<br />

c: “apormncentratian (ma/l)<br />

PPL FID reading W-PM)<br />

K: number of cmtwn atoms in calibration gas<br />

(I III methane)<br />

TH: total hydmcadwns calwlated as gasoline<br />

(GRQ<br />

Q=(1-6)xVxAx(P/~~x~~)<br />

Q: vapor “owl’& (SCFM)<br />

6: percent water vspa in f+nvnresm<br />

v: vapor velocity (fdmin)<br />

A: moss-sedllal area c-a. fo<br />

P: absokde pressure of flowstream (” Hg)<br />

PM: standard pressure (29.92” Hg)<br />

T: absolute temperature of flowstream (degrees Rankine)<br />

TM standard ,emperat”re (528 de‘~reeS Rankine)<br />

M=QxCxo.0696<br />

M: hydiocalbon ,~cxyely rate (Iblday)<br />

Assumptions:<br />

Mg = 128 mgimg-mole<br />

Kg = 24.07 dsmA3/10”6 gm -mole<br />

B = 0.003 from Perry’s Chemical Handbook<br />

A=O.W3%,.ft<br />

Site 2477 Updated: 11/10/00 Page 4 Of 4


TT- 2477178 VOC Pounds Removed and Costs<br />

1200<br />

1000<br />

800<br />

4<br />

5 600<br />

B<br />

400<br />

$4,000.00<br />

200<br />

$2,000.00<br />

0<br />

Now99 Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 O&O0<br />

Past 12 Months<br />

-4 ! 60.00<br />

- VOC Pounds -+ Cost/ VOC Pound Removed -Average -Average<br />

Task Order 33 - Project 780790 Camp Lejeune MCB. NC October 31.<strong>2000</strong>


2<br />

TT2477178<br />

Cumulative VOC Pounds Removed<br />

26206<br />

26000<br />

25800<br />

25700<br />

25600<br />

Now99<br />

Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00<br />

J<br />

Past 12 Months<br />

-Cumulative<br />

Pounds Removed<br />

Task Order 33 - Project 780790 Camp Lejeune MCB, NC October 31.<strong>2000</strong>


Cumulative Mass of Volh ydrocarbons Discharged<br />

Air Sparging (AS) I Soil Vapor Extraction (WE) System<br />

MCB CAMP LEJEUNE - BM-820-<br />

10/29/87 8:20 2<br />

1 o/30/97 10:10 9<br />

10/30/97 13:49 10<br />

1 l/04/97 11:lO 15<br />

1 l/05/97 17:30 31<br />

1 l/0+3/97 14:25 49<br />

1 l/09/97 8:30 115<br />

11111/97 QTOO 164<br />

11/11/97 10:20 185<br />

1 l/14/97 14:30 232<br />

1 l/15/97 8:30 249<br />

1 l/16/97 14:oo 278<br />

1 l/28/97 14:30 400<br />

l2lOl197 9:30 467<br />

12/17/97 9:W 738<br />

12/18/97 9:15 760<br />

01/05/98 moo 1192<br />

01/0+3/98 15:lO 1215<br />

01/12/98 13:oo 1367<br />

01/12/98 14:00 1358<br />

01/21/98 14:oo 1572<br />

01/26/98 13:oo 1612<br />

02/02/98 17:oo 1879<br />

02/l 1198 14:OO 1645<br />

0212OiQ8 8:30 1911<br />

02X24198 11:oo 1987<br />

03x)3/98 9:Oo 2144<br />

03/15/98 7:30 2407<br />

03/28/98 9:45 2468<br />

04/10/98 1530 2889<br />

04/13/98 13:45 2780<br />

04/23/98 10:15 2998<br />

04/29/98 12:20 3142<br />

06/29/88 1o:oo 3885<br />

C%/29/98 12:30 3888<br />

07/09/98 11:15 4127<br />

07/09/98 15:45 4132<br />

07/13iQ8 9:45 4221<br />

07/13/98 12:30 4223<br />

07/22/98 9:30 4217<br />

07/22/98 12:oo 4220<br />

08/03/98 11:15 4505<br />

08/03/98 13:45 4506<br />

06/21/98 12:30 4745<br />

08/21/98 16:45 4749<br />

09/03/98 9:oo 4839<br />

09/03/98 13:30 4842<br />

09/Q/98 7:30 4909<br />

09/12/98 10:45 4912<br />

09/16/96 12:40 4935<br />

09/16/98 15:lO 4937<br />

09/24/98 ll:oo 5155<br />

09/24/98<br />

10/07/98 10:44 5279<br />

10107198<br />

10/14iQ8 8:50 5351<br />

10/14/98<br />

lo/21198<br />

IO/21198<br />

10/22/981<br />

10127198<br />

8~45<br />

14:05<br />

9:05<br />

8:21<br />

5472<br />

5477<br />

5496<br />

5617<br />

10/27/98 13:oo 5821<br />

38<br />

148<br />

139<br />

78.2<br />

123<br />

73<br />

77<br />

59.9<br />

84.3<br />

103.4<br />

63.7<br />

59.9<br />

SO.8<br />

46.7<br />

13.2<br />

5.3<br />

0.1<br />

1<br />

20.4<br />

2.1<br />

8.8<br />

2.5<br />

11<br />

11<br />

13<br />

30<br />

21<br />

16<br />

14<br />

14<br />

10<br />

IO<br />

7<br />

5<br />

7<br />

8<br />

10<br />

17<br />

19<br />

11<br />

8<br />

38<br />

18.5<br />

4776<br />

4026<br />

3730<br />

4093<br />

4659<br />

4218<br />

4802<br />

4837<br />

4697<br />

5286<br />

4882<br />

4597<br />

59W<br />

4700<br />

4100<br />

1700<br />

3700<br />

3300<br />

5800<br />

5500<br />

5100<br />

54W<br />

4500<br />

4500<br />

2200<br />

8WO<br />

4530<br />

2600<br />

1700<br />

2100<br />

1400<br />

2100<br />

2100<br />

700<br />

400<br />

700<br />

800<br />

1300<br />

1000<br />

1400<br />

1200<br />

1800<br />

15w<br />

IWO<br />

1100<br />

1000<br />

1100<br />

2400<br />

14w<br />

900<br />

1200<br />

6WO<br />

5600<br />

5500<br />

5800<br />

54W<br />

56W<br />

5900<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29 92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

29.92<br />

5800 29.92<br />

588<br />

606<br />

520<br />

522<br />

541<br />

532<br />

522<br />

530<br />

532<br />

536<br />

524<br />

527<br />

546<br />

534<br />

534<br />

526<br />

544<br />

549<br />

538<br />

537<br />

529<br />

536<br />

539<br />

543<br />

542<br />

539<br />

528<br />

544<br />

549<br />

541<br />

548<br />

522<br />

544<br />

563<br />

557<br />

566<br />

586<br />

558<br />

557<br />

556<br />

558<br />

550<br />

549<br />

580<br />

555<br />

554<br />

556<br />

541<br />

549<br />

580<br />

556<br />

548<br />

460<br />

550<br />

460<br />

542<br />

460<br />

531<br />

541<br />

530<br />

537<br />

2330<br />

1906<br />

2058<br />

2250<br />

2471<br />

2274<br />

2637<br />

2618<br />

2533<br />

2831<br />

2672<br />

2504<br />

3104<br />

2526<br />

2206<br />

928<br />

1953<br />

1728<br />

3095<br />

2941<br />

2768<br />

2893<br />

2397<br />

2379<br />

1185<br />

3196<br />

2447<br />

1372<br />

889<br />

1114<br />

734<br />

1155<br />

1108<br />

357<br />

206<br />

361<br />

303<br />

671<br />

515<br />

723<br />

817<br />

835<br />

784<br />

513<br />

569<br />

518<br />

568<br />

1274<br />

732<br />

481<br />

620<br />

3144<br />

0.202 42.1<br />

0.787 134.3<br />

0.739 138.1<br />

0.405 81.6<br />

0.654 144.8<br />

0.368 79.0<br />

0.409 96.6<br />

0.319 74.6<br />

0.448 101.8<br />

0.550 139.3<br />

0.339 81.0<br />

0.319 71.4<br />

0.483 1342<br />

0.248 56.1<br />

0.070 5.8<br />

0.028 4.4<br />

0.001<br />

o.w5<br />

0.1<br />

1.5<br />

0.108 13.3<br />

0.011 1.1<br />

0.035 2.3<br />

0.013 1.4<br />

0.058 5.8<br />

0.058 1.9<br />

0.069 1.3<br />

0.160 5.2<br />

0.112 3.0<br />

0.085 5.1<br />

0.074 3.4<br />

0.074 4.8<br />

0.053 2.9<br />

0.053 4.0<br />

0.037 2.6<br />

0.027 1.2<br />

0.037 1.9<br />

0.043 2.0<br />

0.053 2.7<br />

0.090 10.3<br />

0.101 6.6<br />

0.058 2.4<br />

0.043 2.4<br />

1.9<br />

26.9<br />

31.5<br />

55.0<br />

130.4<br />

214.7<br />

456.6<br />

629.6<br />

634.5<br />

970.8<br />

1049.9<br />

1140.9<br />

1663.3<br />

1929.0<br />

2243.8<br />

2246.5<br />

2299.0<br />

2301.1<br />

2314.0<br />

2314.0<br />

2314.0<br />

2314.0<br />

2314.0<br />

2314.0<br />

2314.1<br />

2316.6<br />

2321.5<br />

2394.5<br />

2417.0<br />

2421.7<br />

2430.1<br />

2448.2<br />

2470.0<br />

2588.7<br />

2588.9<br />

2621.0<br />

2621.8<br />

2636.9<br />

2637.3<br />

2638.3<br />

2636.7<br />

2677.8<br />

2678.2<br />

2697.1<br />

2697.4<br />

2704.7<br />

2704.9<br />

2723.1<br />

2724.2<br />

2728.5<br />

2728.7<br />

2739.4<br />

2739.4<br />

2739.4<br />

2739.4<br />

2739.4<br />

2739.4<br />

2739.4<br />

2739.4<br />

2739.4<br />

2880.8<br />

ASISVE Fields la2<br />

AS/SVE Fields la2<br />

AS/S/E Fields l&2<br />

ASJSVE Fields l&2<br />

AS/SVE Fields la2<br />

ASISVE Fields 384<br />

ASISVE Fields 3&4<br />

ASISVE Fields 3a4<br />

AS/SVE Fields l&2<br />

ASISVE Fields la2<br />

AS/SVE Fields ia<br />

ASISVE Fields 384<br />

ASLSVE Fields la2<br />

ASISVE Fields 3&4<br />

ASISVE Fields 3&4<br />

AWSVE Fields la2<br />

AWSVE Fields 182<br />

AS/SVE Fields 384<br />

ASISVE Fields la2<br />

ASISVE Fields 384<br />

AWSVE Fields 384<br />

AWSVE Fields 384<br />

AWSVE Fields 384<br />

ASISVE Fields 3a4<br />

AS/SVE Fields 3&4<br />

ASISVE Fields 3&4<br />

ASlSVE Fields 3&4<br />

ASISVE Fields 3&4<br />

ASISVE Fields l&2<br />

AS/SVE Fields la2<br />

Stack vel est., AS/SVE Fields la2<br />

AS/SVE Fields Ia2<br />

#3&4. Meter data given not cumulative I<br />

#l&2. Meter data given not cumulative<br />

#3a4<br />

#W<br />

#3a4<br />

#l&2<br />

#3a4<br />

#l&2<br />

ma2<br />

#3a4<br />

#l&2<br />

#3&4<br />

ma4<br />

Field # l&2 in repair for water in line<br />

2923<br />

#3a4<br />

Field # l&2 in repair for water in line<br />

2914<br />

#3a4. water in lines<br />

Field # la2 in repair for water in line<br />

540<br />

3136<br />

2886<br />

3034<br />

3101<br />

3084<br />

0.202<br />

0.098<br />

56.1<br />

27.2<br />

2867.7<br />

373a4<br />

#l&2<br />

#I Offline<br />

#ia2<br />

#3a4(<br />

Site 820<br />

Updated:<br />

1 l/10/00<br />

Page 1 of 3


Cumulative Mass of Vola.. ydrocarbons Discharged<br />

Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />

MCB CAMP LEJEUNE - BM-820<br />

SVE Stack<br />

11114lQ8 9:21 5815<br />

11119/98 IO:15 5931<br />

II/IS/98 14:oo 5935<br />

12/05/98 14:oo 8319<br />

12/31/98 14:oo 8391<br />

01/07/99 9:40 6478<br />

01/07/99 13:O.S 6481<br />

01/12/99 9:10 6593<br />

01/12/99 13:15 8597<br />

01/2l/QS 10:05 8810<br />

01/21/99 13:oo 6818<br />

01/28/99 8~35 8929<br />

Oli26/99 12:05 6932<br />

02/05/99 9:30 7172<br />

02/a/99 15:w 7337<br />

02/17/99 13:oo 7448<br />

02mi99 9:45 7561<br />

03/03/99 1o:oo 7666<br />

03/12/99 8:30 7878<br />

03/17/99 13:w 8W2<br />

03/29/99 1l:W 8188<br />

04/08/99 1200 8403<br />

04/15/99 9:oo 8589<br />

04/21/99 8:00 8712<br />

05105199 1l:W 8933<br />

05llO/QQ 7:30 9051<br />

05/21/99 8:30 9071<br />

05/28/99 9:30 9240<br />

06/04/99 15:30 9413<br />

06/11/99 13:30 9580<br />

06/19/99 9:w 9750<br />

08/22/99 12:w 9788<br />

07/05/99 9:W 10100<br />

07/08/99 8:00 10174<br />

07/16/QQ 10:45 10363<br />

07121199 15:30 10488<br />

07/27/99 7:30 10822<br />

08/03/99 11:45 10771<br />

08/10/99 8:15 10934<br />

OW20/99 13:40 11175<br />

08/23/99 13:45 11242<br />

08/31/99 13:21 11395<br />

09/08/99 13:40 11474<br />

10/05/99 10:20 11790<br />

10/12/99 11:15 1195s<br />

10/19/99 a:15 12124<br />

10/28/99 11:15 12341<br />

11/05/99 15:35 12519<br />

1 l/12/99 1355 12631<br />

11/19/99 12:35 12699<br />

11/23/99 11:01 12797<br />

12/03/99 10:50 13028<br />

12112199 12:47 13185<br />

12/18/99 11:40 13308<br />

01/03/00 1350 13428<br />

01/09/00 10:12 13545<br />

01/11/w 14:20 13597<br />

o112o/w 13:30 13718<br />

OlR8/W 13:25 13783<br />

02/03/00 10:49 13901<br />

02/10/00 9:58 14058<br />

02/17/Wl 14:391 14226<br />

78 5200 29.92 530 2817 0.415<br />

57<br />

4sO0<br />

8100<br />

2649<br />

3288<br />

0.303<br />

8100<br />

3255<br />

6100<br />

3255<br />

6100<br />

3255<br />

14<br />

17<br />

15<br />

IO<br />

21<br />

23<br />

27<br />

9.5<br />

5400<br />

5400<br />

5000<br />

5OW<br />

6100<br />

woo<br />

6000<br />

6000<br />

8W<br />

2970<br />

2931<br />

2719<br />

2709<br />

3298<br />

3208<br />

3313<br />

3288<br />

318<br />

0.074<br />

0.090<br />

0.080<br />

0.053<br />

0.112<br />

0.122<br />

0.144<br />

0.051<br />

1200<br />

832<br />

2200<br />

1140<br />

7.3<br />

22<br />

9<br />

23<br />

38<br />

22<br />

0<br />

5<br />

1900<br />

2wo<br />

43w<br />

4700<br />

5900<br />

5700<br />

57w<br />

5200<br />

1049<br />

1054<br />

2365<br />

2401<br />

3063<br />

2943<br />

2978<br />

2833<br />

0.039<br />

0.117<br />

0.048<br />

0.122<br />

0.191<br />

0.117<br />

0.032<br />

0.027<br />

9<br />

9<br />

10<br />

10<br />

1295<br />

60<br />

4<br />

4<br />

907<br />

4<br />

48<br />

5900<br />

5800<br />

5400<br />

500<br />

400<br />

500<br />

800<br />

Qw<br />

<strong>2000</strong><br />

4900<br />

5200<br />

2100<br />

4200<br />

1800<br />

5400<br />

5900<br />

55w<br />

5600<br />

5900<br />

5800<br />

5800<br />

5900<br />

5800<br />

5700<br />

5800<br />

56W<br />

6300<br />

5900<br />

8100<br />

5800<br />

5900<br />

34W<br />

5900<br />

8400<br />

5900<br />

29.92 531<br />

29.92 538<br />

29.92 538<br />

29.92 538<br />

29.92 538<br />

29.92 522<br />

29.92 529<br />

29.92 528<br />

29.92 530<br />

29.92 531<br />

29.92 537<br />

29.92 520<br />

29.92 524<br />

29.92 542<br />

29.92 545<br />

29.92 554<br />

29.92 520<br />

29.92 545<br />

29.92 522<br />

29.92 562<br />

29.92 553<br />

29.92 556<br />

29.92 550<br />

29.92 527<br />

30.92 460<br />

31.92 480<br />

32.92 561<br />

33.92 553<br />

34.92 567<br />

35.92 556<br />

38.92 544<br />

37.92 552<br />

38.92 581<br />

39.92 578<br />

40.92 573<br />

41.92 577<br />

42.92 572<br />

43.92 567<br />

44.92 554<br />

45.92 574<br />

48.92 573<br />

47.92 558<br />

48.92 571<br />

49.92 549<br />

50.92 553<br />

51.92 540<br />

52.92 542<br />

53.92 553<br />

64.92 554<br />

55.92 540<br />

56.92 551<br />

57.92 539<br />

58.92 a44<br />

59.92 535<br />

60.92 544<br />

61.92 535<br />

62.92 551<br />

63.92 530<br />

84.92 515<br />

65.92 523<br />

66.92 534<br />

3020<br />

3011<br />

2734<br />

258<br />

211<br />

260<br />

297<br />

449<br />

1002<br />

2438<br />

2610<br />

1063<br />

2177<br />

900<br />

2706<br />

3036<br />

2766<br />

2929<br />

3063<br />

3084<br />

3072<br />

3083<br />

2902<br />

3031<br />

3022<br />

2983<br />

3325<br />

3186<br />

3219<br />

3113<br />

3074<br />

2925<br />

3289<br />

3513<br />

3172<br />

0.048<br />

0.048<br />

0.053<br />

0.053<br />

6.887<br />

0.319<br />

0.021<br />

0.021<br />

4.823<br />

0.021<br />

0.255<br />

0.005<br />

104.6<br />

71.9<br />

19.8<br />

23.7<br />

19.4<br />

12.9<br />

33.0<br />

35.1<br />

42.8<br />

14.9<br />

3.6<br />

11.0<br />

10.1<br />

26.3<br />

52.5<br />

30.8<br />

8.5<br />

6.7<br />

12.9<br />

1.1<br />

1.0<br />

1.2<br />

617.7<br />

69.6<br />

5.0<br />

2.0<br />

388.7<br />

5.3<br />

66.9<br />

1.4<br />

3417.4 #I1<br />

3421.1 #31<br />

3594.8 Field # l(<br />

3594.8 Field#31<br />

3594.8 Data lnter<strong>pol</strong>atil<br />

3594.8 Data lnterpalatil<br />

3630.6 Field # 11<br />

3633.4 Field # 3(<br />

3734.0 Field# I(<br />

3738.7 Field # 3f<br />

3940.2 Field # 12<br />

3948.7 Field # 3(<br />

4131.6 Field #If<br />

4135.2 Field # 3E<br />

4209.5 No FID data for this eve<br />

4209.5<br />

4209.5<br />

4218.2<br />

4250.3<br />

4343.8<br />

4437.9<br />

4739.8<br />

5118.4<br />

5252.4<br />

5297.8<br />

5328.8 No readings aveilableduetobad equi<br />

5328.8 System down,heatexchangE<br />

5328.8 No FID dataforthis eve<br />

5374.3<br />

5420.8 NO FID data for this eve<br />

5424.6<br />

5432.1<br />

6433.9<br />

5441.9<br />

5441.9<br />

7874.0<br />

9635.2<br />

9846.5<br />

9868.3<br />

9875.1<br />

11826.6<br />

12389.1<br />

12369.1<br />

12377.8<br />

12852.9<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13088.5<br />

13093.4<br />

Site 820 Updated: 11/10/00 Pagezof3


Cumulative Mass of Volh...dHydrocarbons Discharged<br />

Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />

MCB CAMP LEJEUNE - BM-820<br />

03/02/00 l&30 14662<br />

03/18/00 9:OO 14589<br />

03/28/00 1295 14828<br />

04/08/W 8:W 15093<br />

04/14/00 7:15 15093<br />

04/17/00 IO:00 15097<br />

04/28/W lo:00 15353<br />

05/05/00 8:48 15473<br />

05/09mO ll:oo 15573<br />

05/16!00 ll:w 15693<br />

05R6/W lo:oo 15924<br />

W/08/W 8:30 16235<br />

oa/18/W 14:05 16431<br />

06R2m 12% 16574<br />

C8R8lW 13:55 16691<br />

07/05ml 14~02 16858<br />

07/14/00 15:23 17076<br />

07/19m 11:09 17192<br />

07R8m 16:31 17389<br />

08/03/00 II:03 17525<br />

08/11/00 1455 17605<br />

08/18/W 9:11 17758<br />

08R4lOO 8:Ol 17901<br />

09101100 9:50 18033<br />

09/07/00 1403 18181<br />

09/12/w lo:36 18240<br />

09/20/w 8:05 18381<br />

OSR7/00 10:31 18517<br />

10/02/w 12:55 18639<br />

10112/00 IO:10 18876<br />

10/28/W 9:35 19108<br />

10/31100 9:35 19228<br />

0.4 6100<br />

5642<br />

6537<br />

6500<br />

48W<br />

5870<br />

4900<br />

0.2 6300<br />

0.3 6100<br />

0.6 7300<br />

0.3 77w<br />

5800<br />

3 7600<br />

7200<br />

7200<br />

0.2 7000<br />

6900<br />

1 76W<br />

2 7300<br />

2 7300<br />

20 7800<br />

7200<br />

4 7400<br />

4 7200<br />

6 7000<br />

0.5 7200<br />

8200<br />

0.6 88W<br />

7300<br />

7500<br />

73w<br />

69.92<br />

70.92<br />

71.92<br />

71.92<br />

71.92<br />

71.92<br />

71.92<br />

71.92<br />

72.92<br />

73.92<br />

74.92<br />

75.92<br />

78.92<br />

77.92<br />

78.92<br />

79.92<br />

80.92<br />

81.92<br />

82.92<br />

83.92<br />

84.82<br />

85.92<br />

86.92<br />

87.92<br />

88.92<br />

89.92<br />

90.92<br />

91.92<br />

92.92<br />

93.92<br />

94.92<br />

95.92<br />

545<br />

576<br />

559<br />

561<br />

555<br />

590<br />

571<br />

578<br />

570<br />

460<br />

588<br />

585<br />

608<br />

599<br />

594<br />

599<br />

600<br />

605<br />

593<br />

593<br />

587<br />

594<br />

5B4<br />

582<br />

587<br />

572<br />

582<br />

558<br />

586<br />

570<br />

587<br />

572<br />

3214<br />

2812<br />

3358<br />

3327<br />

2483<br />

2780<br />

2465<br />

3129<br />

3073<br />

3565<br />

3779<br />

2739<br />

3643<br />

3480<br />

3451<br />

3350<br />

3275<br />

3680<br />

3534<br />

3511<br />

3770<br />

3540<br />

3851<br />

3522<br />

3514<br />

3552<br />

4145<br />

4312<br />

3677<br />

3798<br />

3664<br />

0.002<br />

0.001<br />

0.002<br />

0.003<br />

0.002<br />

0.016<br />

0.001<br />

0.005<br />

0.011<br />

0.011<br />

0.106<br />

0.021<br />

0.021<br />

0.032<br />

0.003<br />

0.003<br />

0.6<br />

0.3<br />

0.4<br />

1.0<br />

0.5<br />

5.2<br />

0.3<br />

1.8<br />

3.4<br />

3.3<br />

35.9<br />

6.9<br />

6.7<br />

10.0<br />

0.8<br />

1.2<br />

13107.0<br />

13107.4<br />

13107.4<br />

13107.4<br />

13107.4<br />

13107.4<br />

13107.4<br />

13108.1<br />

13109.6<br />

13110.7<br />

13115.6<br />

13125.7<br />

13127.9<br />

13143.4<br />

13158.1<br />

13156.1<br />

13157.5<br />

13158.3<br />

13185.5<br />

13180.0<br />

13191.2<br />

13316.2<br />

13423.1<br />

13442.3<br />

13464.4<br />

13504.9<br />

13536.9<br />

13539.3<br />

13842.4<br />

13548.5<br />

13548.5<br />

13548.5<br />

System down for samptk<br />

Extra<strong>pol</strong>ated<br />

Dal<br />

Notes:<br />

C=(PP~~xKx(~ll(WO<br />

C: vapor concentration (m@l<br />

PP&. FID reading (PPM)<br />

K: number of catin atoms in calibration gas<br />

(t I” methane)<br />

TH: total hydmcarbas cakxlated as gasoline<br />

IGRO)<br />

percent water vapor by volume 0.003<br />

SVE Stack pipe diameter 10<br />

‘2=(1-8)xVxAx(P/P,,)x(T.JTl<br />

a: “.3p4rflowrate (SCFM)<br />

8: percent water vapor in flow5tmarn<br />

V: vawr vekiiy (Ehnin)<br />

A: aosJ-Sedion.3l area (sq. I)<br />

P: absolute pressure of Rowstrain (” Hg)<br />

Paa standard pressure (29.92” Hg)<br />

T: absolute tOmpe‘at”,e ‘if Rowstream (degrees Rsnkine)<br />

T, standard temperature (528 degrees Rankinef<br />

at 68 degrees F (from Pervs handbwk)<br />

* Estimated value due to malfunctionng iwtrument<br />

M-QxCxO.0895<br />

M: hydmtin remwly rate (lb/day)<br />

ASSWllpOOtlS:<br />

MQ = 128 mglnlg-mole<br />

Kg = 24.07 dsm%wCw gm mole<br />

B = 0.003 from Percy’s Chemical Handbook<br />

A = 0.545 sq. fl<br />

Site 820 Updated: 1 l/10/00 Page 3 of 3


Building 820<br />

VOC Pounds Removed and Costs<br />

300<br />

$8.000.00<br />

200<br />

100<br />

$2,000.00<br />

50<br />

$1,000.00<br />

0<br />

lov-99 Dee99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 O&O0<br />

Past 12 Months<br />

$0.00<br />

- VOC Pounds -+- Cost/ Pound Removed -Average -Average<br />

Task Order 33 - Project 780790 Camp Lejeune MCB. NC October 31,200O


n, <br />

Building 820<br />

Cumulative VOC Pounds Removed<br />

14000<br />

13000<br />

12500<br />

Nov-99<br />

Dee-99<br />

Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 oct-oo<br />

I<br />

Past 12 Months<br />

/-Cumulative Pounds Removed /<br />

Task Order 33 - Project 780790 Camp Lejeune MCB, NC October 31.<strong>2000</strong>


MONTHLY PROGRESS REPORl r- ’ SHORT FORM<br />

Report Dates: October 1, <strong>2000</strong> to October 31,200O<br />

Contract No.: N62470-97-D-5000<br />

Order No.: 0036<br />

Pr,sct No.: 781774<br />

Project Name: Monitoring Well Abandonment<br />

Project Location: MCB Camp Lejeune, NC<br />

Project Manager: James A. Dunn, Jr., P.E.<br />

Project<br />

Description:<br />

Plug and properly abandon monitoring wells at various locations<br />

throughout Camp Lejeune.<br />

Hard Copies Distributed to:<br />

COTR:<br />

Karen Wilson (757)322-4817<br />

Wilsonke@efdlant.navfac.navv.mil<br />

RAC CM:<br />

(757)396-5121<br />

Greg Hedley<br />

Hedlevos@efdlant.navfac.navv.mil ext’ 383<br />

Project Controls Manager:<br />

Linda Barberousse<br />

Lbarberousse@theitaroup.com<br />

Contract Files<br />

Scheduled Web Site Posting Date:<br />

ROICC:<br />

November 22,200O<br />

Brent Rowse<br />

(757)363-7190<br />

Original Contract Start Date:<br />

Original Contract Completion Date:<br />

Current Contract Completion Date:<br />

O&M Completion Date:<br />

Current Projected Completion Date:<br />

esting an extension to the Period of Performance<br />

Current TO Ceiling:<br />

Total $ to Date:<br />

Remaining Funds:<br />

Estimated Report Period:<br />

Forecast @ Completion:<br />

Previous Period Forecast @ Completion:<br />

51,340.oo<br />

8,014.OO<br />

43,326.OO<br />

2,766.OO<br />

50,848.OO<br />

51,330.oo<br />

During October, plugged and abandoned 12 wells in accordance with Addendum 6 to the Work Plans.<br />

None<br />

None<br />

ne Sites at the<br />

Totals 1 $51,340.89 ) $2,194.99 1 $53,535.8E<br />

Approved by: qOatim . Attachments: ;~r;;;~~q$<br />

Roland Moreau, P.E.<br />

Program Manager


IT Corporation<br />

START DATE 01 JA.<br />

FIN DATE OJJANOI<br />

Task Orde onitoring Well Abandonment PAGE NO. 1<br />

DATE<br />

OJNOVW<br />

Performance<br />

Report<br />

WBS<br />

Code<br />

Description<br />

Oll<br />

Bud<br />

ant<br />

Qnt<br />

Rev<br />

CW<br />

ant<br />

Task<br />

Unit<br />

Ins Task orig. s Current Eamed<br />

ant % Budg Rev./ Budg. S<br />

Comp $ Adjust $<br />

Actual ETC Forecast Variance Variance K Physl<br />

s CPI At from from of %<br />

ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />

01000010<br />

Precon<br />

Mut. Und. Meeting<br />

ml<br />

0<br />

loo %<br />

IW<br />

103<br />

1950 0 1950 1950<br />

0<br />

0.00 0 0 -1950<br />

-1950<br />

3.6 3.6<br />

01000100<br />

Mobe Construction<br />

Equipme<br />

103<br />

0<br />

loo %<br />

0<br />

0<br />

8667 0 6667 0<br />

0<br />

0.00 6667 6667 0<br />

0<br />

16.9 0.0<br />

01000200<br />

Submittalsllmplementation<br />

100<br />

0<br />

lco %<br />

30<br />

30<br />

4442 0 4442 1333<br />

279<br />

0.21 4163 4442 0<br />

0<br />

a.7 26<br />

01003000<br />

Estimate<br />

Prep<br />

100<br />

0<br />

ml %<br />

1CO<br />

IW<br />

0 0 0 0<br />

1961<br />

0.00 0 1961 1961<br />

1961<br />

0.0 0.0<br />

01003010<br />

DO@6<br />

Cost Proposal<br />

KY3<br />

0<br />

1Mf 96<br />

IW<br />

100<br />

3456 0 3456 3458<br />

311<br />

0.09 0 311 3147<br />

-3147<br />

6.7 6.7<br />

02004000<br />

Monitoring<br />

Wells<br />

100<br />

0<br />

loo %<br />

2.2<br />

22<br />

16823 0 16623 4141<br />

4036<br />

0.98 16014 20053 1230<br />

1230<br />

36.7 8.1<br />

21004000<br />

Demoba Construction Equip<br />

KC<br />

0<br />

la, 56<br />

0<br />

0<br />

2325 0 2325 0<br />

0<br />

0.00 2325 2325 0<br />

0<br />

4.5 0.0<br />

66666666<br />

2WO Rastrwiuring<br />

Costs<br />

1W<br />

0<br />

la, %<br />

0<br />

0<br />

0 0 0 0<br />

10<br />

0.00 72 a2 a2<br />

82<br />

0.0 0.0<br />

90000000<br />

Fud<br />

103<br />

0<br />

IO %<br />

30<br />

30<br />

304 0 204 91<br />

0<br />

0.00 304 334 0<br />

0<br />

0.6 0.2<br />

96001000<br />

Supervision<br />

andManagemen<br />

1CQ<br />

0<br />

loo 36<br />

30<br />

30<br />

1320 0 1320 3%<br />

1242<br />

3.14 1349 2591 1271<br />

1271<br />

2.6 0.8<br />

98004000<br />

EngklWrillg<br />

100<br />

0<br />

la, %<br />

30<br />

30<br />

3144 0 3144 943<br />

0<br />

0.00 3144 3144 0<br />

0<br />

6.1 1.8<br />

98005000<br />

Purchasing<br />

Assistance<br />

100<br />

0<br />

loo %<br />

30<br />

30<br />

479 0 479 144<br />

54<br />

0.36 426 460 1<br />

0.9 0.3<br />

98016000<br />

Per Diem<br />

100<br />

0<br />

100 %<br />

30<br />

30<br />

1841 0 1841 552<br />

32<br />

0.06 1809 1641 0<br />

0<br />

3.6 1.1<br />

9809<strong>2000</strong><br />

Equipment<br />

100<br />

0<br />

lco %<br />

30<br />

20<br />

4566 0 4566 1376 86 0.06 4560 4647 60 W a.9 2.7<br />

51340 0 51340 14384 8014 0.56 42835 50848 -492 -492 100.0 28.0<br />

51340 0 51340 14394 8014 0.56 4283.5 50848 492 492 100.0 28.0


Work<br />

cfive Log<br />

Monitoring Wei1 Abandonment<br />

Task Order: 36<br />

Project Number: 781774<br />

1/10/00<br />

Impacts<br />

(TD)OOl<br />

(TD)OOZ<br />

SG<br />

TD<br />

6/20/00<br />

Q/l 3100<br />

6127100 A<br />

9/13/00 A<br />

N/A Abandon monitoring well at Site TC 647 30 N $1,000<br />

N/A Abandon 4 monitoring wells at Site CGI; abandon 8 monitoring wells at Boldg 1450. 30 N $3,050<br />

Chanae Tvoe:<br />

TD - Technical Directive<br />

SG - Scope Growth<br />

SR - Scope Reduction<br />

Status:<br />

A -Approved<br />

P - Pending<br />

R - Rejected<br />

W-Withdrawn<br />

Page 1


Report Dates:<br />

MONTHLY PROGRESS REPORT - SHORT FORM<br />

October 1, <strong>2000</strong> to October 31,200O Hard Copies Distributed to:<br />

Contract No.: N62470-97-D-5000<br />

I COTR:<br />

Karen Wilson<br />

(757)322-4817<br />

Order No.: 0039<br />

I<br />

PrVJect No.:<br />

785143<br />

RAC CM:<br />

(757)396-5121<br />

Greg Hedley<br />

Project Name: Monitoring Well Abandonment<br />

Hedlevqs@efdlant.navfac.navv.mil ext’ 383<br />

Project Location: MCB Camp Lejeune, NC<br />

Project Controls Manager:<br />

Linda Barberousse<br />

(757)363-7190<br />

Project Manager: James A. Dunn, Jr., P.E.<br />

Lbarberousse@theitnrouo.com-<br />

Project<br />

Description:<br />

Plug and properly abandon monitoring wells at various locations<br />

throughout Camp Lejeune.<br />

Contract Files<br />

Scheduled Web Site Postinn Date:<br />

November 22,200O<br />

ROICC: Brent Rowse<br />

Original Contract Start Date:<br />

Original Contract Completion Date:<br />

Current Contract Completion Date:<br />

O&M Completion Date:<br />

Current Projected Completion Date:<br />

A letter requesting an extension in the Period of Performance<br />

Current TO Ceiling:<br />

Total $ to Date:<br />

Remaining Funds:<br />

Estimated Report Period:<br />

Forecast @ Completion:<br />

37,819.OO<br />

11,267.OO<br />

26,5x52.00<br />

5,006.OO<br />

37,749.oo<br />

37 800.00<br />

None<br />

None<br />

Orig Monitoring Well Abandonment. 08/01199 09/30/00 $37,819.00 $1,518.00 $39,337.OC<br />

Totals 1 $37,819.00 1 $1,518.00 1 $39,337.OC<br />

Approved by: 40dfih Attachments: ;~r;;$s,“e,p,o,rt<br />

Roland Moreau, P.E.<br />

Program Manager


IT COIpOratiOn<br />

START DATE 01 JAh<br />

FIN DATE OSJANOI<br />

PAGE NO. 1<br />

DATE<br />

OSNOVOO<br />

performance<br />

Report<br />

WBS<br />

C0de<br />

Description<br />

On’<br />

Bud<br />

Qnt<br />

Qnt<br />

Rev<br />

CW<br />

ant<br />

Task<br />

Unit<br />

Ins Task orlg. 0 current<br />

Qnt % Budg Rev./ Budg.<br />

Comp $ Adjust $<br />

EanWd Actual ETC Forecast Variance Variance % Physl<br />

$ t CPI At from from Of %<br />

ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />

01001000 Mobe Canstructiin Equip 100 0 1w 56 45 45<br />

01003000 Submittaldlmplementatian ml 0 loo % 50 50<br />

02004000 Monitoring Wells ID3 0 loo % 45 45<br />

21 w4000 Demob Construct Equip 1W 0 loo % 0 0<br />

66666666 <strong>2000</strong> Restrududng Costs 100 0 loo % 0 0<br />

9wooooo FUel 100 0 IW % 0 0<br />

99001000 Supervision/Management 1W 0 lco % 70 70<br />

99004000 Engineering 100 0 la, % 0 0<br />

99005ow Purchasing Assistance lco 0 ltx % 45 45<br />

99016000 Per Diem ICC 0 100 % 45 45<br />

2016<br />

15301<br />

2114<br />

0<br />

710<br />

693<br />

3008<br />

234<br />

1924<br />

0 7399 3330 529 0.16 5870 6399 -law) -loco 19.6 8.8<br />

0 2016 1008 0 0.00 1016 1016 -ICC0 -ICC0 5.3 2.7<br />

0 15301 6886 6875 1 .oo 9991 16866 1565 1565 40.5 10.2<br />

0 2114 0 0 0.00 2114 2114 0 0 5.6 00<br />

0 0 0 60 0.00 242 353 3x3 Z-3 0.0 0.0<br />

0 710 0 46 0.00 6% 710 0 0 1.9 0.0<br />

0 m 627 2094 3.34 818 2912 2016 2016 2.4 1.7<br />

0 3008 0 0 0.00 2470 2478 -530 -530 8.0 0.0<br />

0 234 153 101 0.96 133 234 0 0 0.6 0.3<br />

0 1924 866 319 0.37 1000 1319 -605 -605 5.1 2.3<br />

9909<strong>2000</strong> Equipment 1CO 0 loo % 45 45<br />

4217 0 4217 1898 1243 0.65 2155 3398 -819 -919 11.1 5.0<br />

37819 0 37819 14719 11267 0.77 26482 37749 -70 -70 100.0 38.9<br />

37819 0 37819 14719 11267 0.77 26482 37749 -70 -70 100.0 38.9


Work r<br />

cfive Log<br />

Monitoring Well Abandonment<br />

Task Order: 39<br />

Project Number: 785143<br />

Costs are a Rough Order of Magnitude (ROM). It is not actual cost, nor is it a final change request value.<br />

1/10/00<br />

Impacts<br />

(TD)OOl SG l/6/00<br />

(TD)002 SG 9/l 3100<br />

l/6/00<br />

9i13lOO<br />

A<br />

A<br />

N/A Abandon 4 monitoring wells at Sites 9 and 63 30 N $3,675<br />

N/A Abandon 34 monitoring wells at Site TC 2455, six at BB-71 and eleven at Bldg 21. 30 N $8,500<br />

Chanae Tvoe:<br />

TD - Technical Directive<br />

SG - Scope Growth<br />

SR - Scope Reduction<br />

Status:<br />

A - Approved<br />

P - Pending<br />

R - Rejected<br />

W-Withdrawn<br />

Page1


MONTHLY PROGRESS REPORT - SHORT FORM<br />

Report Dates: October 1, <strong>2000</strong> to October 31,ZOOO Hard Copies Distributed to:<br />

Contract No.: N62470-97-D-5000 COTR:<br />

Karen Wilson (757)322-4817<br />

Order No.: 0058 W~lsonke@efcilant.navfac.navv.mil<br />

PI ,ect No.: 808021<br />

Project Name: Basewide AFVR Activities<br />

Project<br />

Project<br />

Project<br />

Location:<br />

Manager:<br />

Description:<br />

MCB Camp Lejeune, NC<br />

James A. Dunn, Jr., P.E.<br />

Perform basewide AFVR activities at Marine Corps Air Station New<br />

Riverand Marine Corps Base,Camp Lejeune.<br />

RAC CM:<br />

(757)396-5121<br />

Greg Hedley<br />

Hedlevos@,efdlant.navfac.navv.mil ext’ 383<br />

Project Controls Manager:<br />

Linda Barberousse<br />

Lbarberousse@theitoroup.com<br />

Contract Files<br />

Scheduled Web Site Postinn Date:<br />

November 22,200O<br />

ROICC: Brent Rowse<br />

(757)363-7190<br />

Original Contract Start Date: 04/25/00<br />

Original Contract Completion Date: 05/12/00<br />

Current Contract Completion Date: 05/31/01<br />

O&M Completion Date: 05/31/01<br />

Current Projected Completion Date: 05/31/01<br />

Current TO Ceiling:<br />

Total $ to Date:<br />

Remaining Funds:<br />

Estimated Report Period:<br />

Forecast @ Completion:<br />

Previous Period Forecast @ Completion:<br />

25,983.OO<br />

421.00<br />

25,562.OO<br />

0.00<br />

25,975.oo<br />

25,975.oo<br />

None<br />

None<br />

Orig<br />

1<br />

Prepare Fee Proposal for Basewide<br />

AFVR Activities<br />

Basewide AFVR Activities at New<br />

River and Camp Lejeune<br />

04/25/00 05/12/00 $2,731.00 $169.00 $2,9OO.O<br />

05/23/00 05/31/01 $23,252.00 $1,145.00 $24,397.OC<br />

Totals 1 $25,983.00 1 $1,314.00 / $27,297.OC<br />

Approved by: QO& nlmedL-- Attachments: Pe=f$m;;rn&Grt<br />

Roland Moreau, P.E.<br />

Program Manager


IT Corporation<br />

START DATE OIJA.<br />

FIN DATE 31MAYOl’<br />

Order 58 - 808021 PAGE NO. 1<br />

DATA DATE<br />

03NOVOC<br />

WBS<br />

Code<br />

Description<br />

Ott<br />

Bud<br />

ant<br />

ant<br />

RW<br />

Cur<br />

clnt<br />

Task<br />

Unit<br />

Ins<br />

Qnt<br />

Task olig. s Current<br />

% Budg RW.l Budg.<br />

Comp S Adjust $<br />

Earned Achral ETC Forecast VWtWW Valiance % Physl<br />

t S CPI At from from of %<br />

ToDate Comp. Org. Bud Cur. Bud Proj camp<br />

40000000 AFVR IW 0 loI % 0 0 20440 0 20440 0 0 0.00 20440 20440 0 0 70.7 0.0<br />

66666666 2WORest1wtufingCosts 103 0 IW % 0 0 0 0 0 0 2 0.00 1141 439 -439 439 0.0 0.0<br />

98016000 Per Diem ICYI 0 100 % 0 0 2812 0 2812 0 0 0.00 2812 2812 0 0 10.8 0.0<br />

99w0100<br />

Admin&Support<br />

lo0 0 103 % 16 16 2731 0 2731 437 420 0.96 2743 3163 432 432 10.5 1.7<br />

25983 0 25983 437 421 0.96 28554 26975 -8 -8 100.0 1.7<br />

25983 0 25983 437 421 0.96 25554 28975 -8 -8 100.0 1.7


cfive Log<br />

Monitoring Well Abandonment<br />

Task Order: 58<br />

Project Number: 808021<br />

Costs are a Rough Order of Magnitude (ROM). It is not actual cost, nor is it a final change request value.<br />

1 /l o/o0<br />

Impacts<br />

(TD)OOl SG 6/20/00<br />

(TD)002 SG 6127100<br />

(TD)003 SG 8/30/00<br />

6126100 A<br />

6i28lOO A<br />

8i3OlOO A<br />

N/A Perform AFVR event on monitoring well MW-1 1 at Berkeley Manor 820 5 N $400<br />

N/A Perform AFVR activities at H-28 on the source well USTH28-MW-I I. 15 N $1,000<br />

NIA Perform AFVR activities at A-47-5 (Site 73) on monitoring well 73-MW-14. 15 N $1,000<br />

Chanae Tvpe:<br />

TD - Technical Directive<br />

SG - Scope Growth<br />

SR - Scope Reduction<br />

Status:<br />

A - Approved<br />

P - Pending<br />

R - Rejected<br />

W - Withdrawn<br />

Page 1