october 2000 monthly progress report pol sites
october 2000 monthly progress report pol sites
october 2000 monthly progress report pol sites
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
OCTOBER <strong>2000</strong><br />
MONTHLYPROGRESSREPORTS<br />
POL SITES<br />
MCBCAMPLEJEUNE<br />
JACKSONVILLE,NORTHCAROLINA<br />
Contract Nos.<br />
N62470-93-D-3032<br />
and<br />
N62470-97-D-5000<br />
Prepared for:<br />
Environmental Management Division<br />
MCB Camp Lejeune<br />
Jacksonville, North Carolina<br />
Prepared by:<br />
A member of THE IT GROUP<br />
11560 Great Oaks Way, Suite 500<br />
Alpharetta, GA 30022
MONTHLY PROGRESS REPORT - SHORT FORM<br />
Report Dates: October 1, <strong>2000</strong> to October 31, <strong>2000</strong><br />
Contract No.: N62470-97-D-5000<br />
T<br />
ra”k<br />
Order No.: 0011<br />
Pr-,ect No.: 920704<br />
Project Name: Building 1613 SVE / Air Sparge<br />
Project Location: MCB Camp Lejeune, NC<br />
Project Manager: James A. Dunn, Jr., P.E.<br />
Project<br />
Description:<br />
Installation of Air Sparge/SVE systems at Building 1613 to remediate<br />
petroleum contaminated soils and groundwater and operation and<br />
maintenance of the systems.<br />
Hard Copies Distributed to:<br />
COTR:<br />
Karen Wilson (757) 322-4817<br />
Wilsonke@efdlant.navfac.navv.mil<br />
RAC CM:<br />
(757) 396-5121<br />
Greg Hedley<br />
Hedlevos@efdlant.navfac.navy.mil ext. 383<br />
Project Controls Manager:<br />
Linda Barberousse<br />
Lbarberousse@theitaroup.com<br />
Contract Files<br />
Scheduled Web Site Postinn Date:<br />
November 22,200O<br />
ROICC: Brent Rowse<br />
RPM: Lori Reuther<br />
(757) 363-7190<br />
Original Contract Start Date:<br />
Original Contract Completion Date:<br />
Current Contract Completion Date:<br />
O&M Completion Date:<br />
Current Projected Completion Date:<br />
Ceiling:<br />
Total $ to Date:<br />
Remaining Funds:<br />
Estimated Report Period:<br />
Forecast @ Completion:<br />
Previous Period Forecas<br />
609,512.OO<br />
391,934.oo<br />
217578.00<br />
18,760.OO<br />
607,693.OO<br />
n ,al operation and maintenance of the system. During October <strong>2000</strong>, removed an estimated total of 103 Ibs. of hydrocarbons<br />
from the site. See attached detailed Operating Report. Received results of soils borings and re-sampled three points for analyses<br />
by MADEP parameters. Conducted groundwater sampling event and received analytical results. System expansion plans are<br />
No changes<br />
None<br />
Orig<br />
Remedial Action at Bldg. 1613, Camp<br />
Lejeune. 06122198 04/30/99 $307,128.00 $12,916.00 $320,044.00<br />
1 Continue O&M for additional 12 Months 05128199 08131 /OO $156,054.00 $8,254.00 $164,308.00<br />
2 Continue O&M 05/I 2/00 0513 1 /o I $146,330.00 $7,396.00 $153,726.00<br />
Totals 1 $609,512.00 1 $28,566.00 1 $638,078.00<br />
Approved by: Attachments: Performance Report<br />
Cost Performance Curve<br />
P<br />
Roland Moreau, P.E. Work Directive Log<br />
Program Manager Building 1613 Data
_. -. ).<br />
IT Corporation order 11 - 920704 PAGE NO. 1<br />
START DATE 01 MA<br />
FIN DATE OIJUNOI ’ DATADATE 03NOVOC<br />
Performance<br />
Report<br />
WBS<br />
Code<br />
Description<br />
Oll<br />
Bud<br />
Qnt<br />
ant<br />
Rev<br />
CW<br />
Ctnt<br />
Task<br />
Unit<br />
Ins<br />
Qnt<br />
Task orlg.<br />
% Budg<br />
Comp S<br />
b current Earned Adual ETC Forecast Variance Variance % PhYSl<br />
Rev./ Budg. $ s CPI At from from of %<br />
Adjust f ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />
ooooowo Proposal Prep<br />
la,<br />
0<br />
1w %<br />
100<br />
103<br />
0 0 0 0 5 0 00 0 5 5 5 0.0 0.0<br />
o5woooo Add Sparge 8 SVE Wells<br />
100<br />
0<br />
loo %<br />
0<br />
0<br />
17626 0 17628 0 0 0.00 35c.w L75lm 17172 17172 2.9 0.0<br />
10000000 O&MMANUAL&ASSUILT<br />
1w<br />
0<br />
10 %<br />
loo<br />
100<br />
7372 0 7372 7372 12643 1.72 0 12643 5271 5271 1.2 1.2<br />
<strong>2000</strong>0000 WORK PLANS<br />
IW<br />
0<br />
ID3 36<br />
1M)<br />
1W<br />
135si 0 13593 13596 6656 0.64 0 6656 4940 4940 2.2 2.2<br />
21000000 DRAWINGS & SPECS<br />
1Ml<br />
0<br />
IW 56<br />
loo<br />
100<br />
8909 0 8909 8909 657 0.07 0 657 -8252 -8252 15 1.5<br />
2<strong>2000</strong>000 CONSTRUCTION SCHED<br />
IW<br />
0<br />
1DJ %<br />
100<br />
IO<br />
1813 0 1813 1813 399 0.22 0 399 -1414 4414 0.3 0.3<br />
23000000 INITIAL PROCUREMENT<br />
100<br />
0<br />
loo %<br />
IW<br />
100<br />
4160 0 4160 4160 8155 1.96 0 8155 3995 3995 0.7 0.7<br />
24000000 PROJECT MOB/DEMOS<br />
loo<br />
0<br />
100 %<br />
100<br />
loo<br />
145% 0 1455% 145-58 11170 0.77 0 11170 -3386 -3x38 2.4 2.4<br />
25OOooOO<br />
SITE PREP<br />
103<br />
0<br />
loo %<br />
100<br />
IW<br />
5304 0 5384 5384 1962 0.36 0 1962 -3422 -3422 0.9 0.9<br />
30000000 INSTALL AIR SPRAGE<br />
IO<br />
0<br />
IW 36<br />
10<br />
1CQ<br />
7044 0 7044 7044 2719 0.39 0 2719 -4325 -4325 1.2 1.2<br />
31000000 INSTALL SVE WELLS<br />
IW<br />
0<br />
loo 36<br />
1M)<br />
IW<br />
8995 0 8995 8995 15070 1.68 0 15070 6075 6075 1.5 1.5<br />
3<strong>2000</strong>000 SVE 8 AIR SPARGE TRE<br />
IW<br />
0<br />
100 %<br />
100<br />
1w<br />
2w4o 0 2w40 2cO4O 10889 0.54 0 10899 -9141 -9141 3.3 3.3<br />
33OOOocO WELL HEAD INSTALLAT<br />
IW<br />
0<br />
loo %<br />
1w<br />
loo<br />
31777 0 31777 31777 22672 0.71 0 22672 -9105 -9105 5.2 5.2<br />
34000000 REMED SYSTEM INSTALL<br />
IW<br />
0<br />
100 %<br />
1CiJ<br />
IW<br />
66175 0 65175 65175 31612 0.49 0 31612 -33563 -33563 10.7 10.7<br />
35000000 T&D DEBRISMIASTE<br />
IW<br />
0<br />
iw %<br />
IW<br />
IW<br />
2518 0 2518 2518 422 0.17 0 422 -2O+K -m 0.4 0.4<br />
36000000 SITE RESTORATION<br />
ica<br />
0<br />
IW %<br />
la,<br />
1W<br />
7070 0 7070 7070 3962 0.56 0 3962 -3108 3108 1.2 1.2<br />
37Mx)OOO SYSTEM STARTUP B OPT<br />
100<br />
0<br />
loo 36<br />
1CO<br />
1w<br />
11577 0 11577 11577 126r.0 1.09 0 1264x 1023 1023 1.9 1.9<br />
38000000 CARSON SYS DEMOE<br />
100<br />
0<br />
IO 36<br />
0<br />
100<br />
2902 0 2902 2902 0 0.00 0 0 -2932 -Em 0.5 0.0<br />
40000000 SYSTEM O&M<br />
IW<br />
0<br />
1M) 56<br />
ICO<br />
IW<br />
40029 0 40029 4w29 45618 1.14 0 45618 5589 5589 6.6 6.6<br />
41000000 ASlSVE Maintenance - 1613<br />
100<br />
0<br />
loo %<br />
25<br />
25<br />
45914 0 45914 11479 8345 0.73 28MxI 36345 -9569 -9569 75 1.9<br />
4<strong>2000</strong>000 Operation - Bldg 1613<br />
100<br />
0<br />
ml %<br />
25<br />
25<br />
107321 0 107321 26530 20283 0.76 6ww 80283 -27038 -27038 17.6 4.4<br />
43000000 AfvR<br />
1W<br />
0<br />
loo %<br />
0<br />
0<br />
27$65 0 27965 0 0 0.00 lOOD3 loo00 -17865 -17965 46 0.0<br />
44000000 Addrl CSA Investigation<br />
1w<br />
0<br />
1w %<br />
85<br />
85<br />
0 0 0 0 29154 0.00 5000 2.4151 34154 34154 0.0 0.0<br />
66666666 2WO Restructuring Costs<br />
0<br />
0<br />
0<br />
0<br />
0<br />
0 0 0 0 948 0.00 -1793 -845 -845 845 0.0 0.0<br />
90000000 Ft.@<br />
iw<br />
0<br />
loo 36<br />
85<br />
a5<br />
2374 0 2374 2018 1935 0.96 4w 2335 -39 39 0.4 0.3<br />
98016000 Per Diem<br />
1W<br />
0<br />
loo %<br />
30<br />
30<br />
521 0 521 156 32 0.20 489 521 0 0 0.1 0.0<br />
9809<strong>2000</strong> Equipment<br />
100<br />
0<br />
loo %<br />
30<br />
30<br />
25670 0 25678 7703 0 0.00 9500 9500 -16178 -16178 4.2 1.3<br />
99000100 ADMIN & SUPPORT<br />
100<br />
0<br />
loo %<br />
a5<br />
85<br />
102389 0 102389 87031 127643 1.47 58474 184118 61729 81729 16.6 14.3<br />
99400100 PER DIEMS<br />
!W<br />
0<br />
W %<br />
M<br />
w<br />
26603 0 m33 15962 14371 0.90 12690 27031 458 458 4.4 2.6<br />
609512 0 609512 404098 391934 0.97 215759 607693 -1819 -1819 100.0 65.8
Task Order 11 Cost Performance Curve<br />
700<br />
600<br />
500<br />
400<br />
f<br />
.-<br />
ft3<br />
300<br />
f----- Time Now 11/3/00<br />
200<br />
100<br />
Physical % Complete = 65.8<br />
Financial % Complete = 64.3<br />
0<br />
Jul-00 Aug-00 Sep-00 Ott-00 Nov-00 Dee-00 Jan-01 Feb-01<br />
Mar-01 Apr-01 May-01<br />
1<br />
Time in Months<br />
I --+- RevBaseline m w Actual -k #Earned - I
Work r’;)-ecfive Log<br />
Air spargel& s] stem Building 1613<br />
Task Order: 11<br />
Project Number: 920704<br />
_. 11 /I woo<br />
Impacts<br />
><br />
1 TD 1 O/l Q/99 Disapproved R N/A Respond to Dentz letter of 1 O/l l/99 including Soil Sampling. 30 Days N $7,800<br />
2 TD 11/10199 II/IO/99 A N/A Sampling all monitoring wells iin vicinity of remedial system for constituents of concern 30 N $4,000<br />
3 TD 8/l 7100 8/18/00 A 8/24/00 lnvestiaate for contamination. install three new monitorina wells. 50 N $34 A70<br />
Chancre Tvpe:<br />
TD - Technical Directive<br />
SG - Scope Growth<br />
SR - Scope Reduction<br />
Status:<br />
A - Approved<br />
P - Pending<br />
R - Rejected<br />
W - Withdrawn<br />
Page 1
Cumulative Mass of Volatk, ydrocarbons Discharged<br />
Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />
MCB CAMP LEJEUNE - Building 1613<br />
11 II 6198 11:30<br />
11 II 7198 9145<br />
1 l/20/98 IO:30<br />
12/01198 II:30<br />
12/11/98 II:00<br />
12/15/98 IO:35<br />
12122198 12:20<br />
01/08/99 1505<br />
01/11/99 13:50<br />
01/20/99 14:35<br />
01129l99 14:45<br />
02/05/99 17:06<br />
02/11/99 I!30<br />
02/18/99 14:lO<br />
02126199 IO:00<br />
03/05/99 II:00<br />
03/08/99 14:oo<br />
03118199 8:30<br />
03/25/99 16:04<br />
03/31/99 12:oo<br />
04/06/99 II:30<br />
04113199 13:oo<br />
04/20/99 II:00<br />
04/30/99 II:30<br />
05/04/99 12:oo<br />
05/12/99 8:30<br />
05/19/99 13:oo<br />
08/04/99 7:30<br />
06/08/99 9:45<br />
06/18/99 13:oo<br />
06/25/99 7:45<br />
07/01/99 13:oo<br />
07/09/99 7130<br />
07/14/99 8:00<br />
07122199 13:05<br />
07/27/99 15:55<br />
3087<br />
3093<br />
3166<br />
3427<br />
3662<br />
3757<br />
3927<br />
3982<br />
4052<br />
4227<br />
4444<br />
4498<br />
4640<br />
4807<br />
4995<br />
5162<br />
5239<br />
5473<br />
5640<br />
5784<br />
5930<br />
6020<br />
6192<br />
6433<br />
6524<br />
6716<br />
6882<br />
7267<br />
7368<br />
7575<br />
7738<br />
7885<br />
8078<br />
8196<br />
8385<br />
85791<br />
1130<br />
1130<br />
2350<br />
2672<br />
1700<br />
1833<br />
2193<br />
2635<br />
1032<br />
594.5<br />
402<br />
20716<br />
232<br />
682<br />
840<br />
1008<br />
778<br />
704<br />
1592<br />
367<br />
188<br />
303<br />
119<br />
108<br />
508<br />
184<br />
132<br />
144<br />
213<br />
279<br />
79<br />
88<br />
4<br />
36<br />
273<br />
91<br />
5000<br />
5000<br />
5000<br />
3300<br />
3100<br />
3100<br />
3500<br />
3400<br />
3100<br />
4000<br />
3300<br />
2400<br />
2700<br />
2200<br />
1600<br />
2500<br />
2500<br />
2700<br />
2500<br />
2400<br />
2600<br />
1800<br />
2400<br />
2800<br />
3300<br />
3000<br />
<strong>2000</strong><br />
1700<br />
2100<br />
1400<br />
2300<br />
550<br />
550<br />
550<br />
551<br />
543<br />
541<br />
551<br />
540<br />
540<br />
542<br />
556<br />
542<br />
559<br />
556<br />
539<br />
547<br />
548<br />
555<br />
552<br />
560<br />
558<br />
561<br />
553<br />
535<br />
554<br />
560<br />
564<br />
562<br />
574<br />
543<br />
576<br />
580<br />
580<br />
575<br />
588<br />
579<br />
418<br />
418<br />
418<br />
275<br />
262<br />
263<br />
292<br />
289<br />
264<br />
339<br />
273<br />
203<br />
222<br />
182<br />
136<br />
210<br />
210<br />
224<br />
208<br />
213<br />
247<br />
246<br />
199<br />
223<br />
149<br />
197<br />
228<br />
270<br />
240<br />
169<br />
180<br />
151<br />
135<br />
168<br />
109<br />
183<br />
6.01<br />
6.01<br />
12.50<br />
14.21<br />
9.04<br />
9.75<br />
11.66<br />
14.01<br />
5.49<br />
3.18<br />
2.14<br />
110.16<br />
1.23<br />
3.63<br />
4.47<br />
5.36<br />
4.14<br />
3.74<br />
8.47<br />
1.95<br />
1 .oo<br />
1.61<br />
0.63<br />
0.57<br />
2.70<br />
0.98<br />
0.70<br />
0.77<br />
1.13<br />
1.48<br />
0.42<br />
0.47<br />
0.02<br />
0.19<br />
1.45<br />
0.48<br />
224.61<br />
224.69<br />
467.28<br />
350.02<br />
212.28<br />
229.73<br />
304.69<br />
362.88<br />
129.58<br />
95.96<br />
52.19<br />
2006.40<br />
24.53<br />
59.02<br />
54.54<br />
100.77<br />
77.63<br />
74.91<br />
157.70<br />
37.27<br />
22.11<br />
35.44<br />
11.30<br />
11.48<br />
36.10<br />
17.25<br />
14.33<br />
18.49<br />
24.35<br />
22.48<br />
6.00<br />
6.31<br />
0.26<br />
2.88<br />
14.22<br />
7.91<br />
56.16<br />
1108.53<br />
5552.62<br />
8305.57<br />
9180.40<br />
11073.15<br />
11838.07<br />
12556.25<br />
13378.56<br />
14048.33<br />
16364.24<br />
22372.43<br />
22663.13<br />
23107.92<br />
23648.26<br />
23934.44<br />
24678.08<br />
25487.39<br />
26072.31<br />
26252.92<br />
26360.82<br />
26528.29<br />
26642.65<br />
26732.85<br />
26946.25<br />
27055.47<br />
27318.78<br />
27408.93<br />
27610.87<br />
27707.57<br />
27745.28<br />
27771.64<br />
27779.34<br />
27846.64<br />
27936.06<br />
BOD-Receivedon12/15/98<br />
Bldg 1613 Updated: 11/10/00 Page1 of 3
Cumulative Mass of Volat,, ydrocarbons Discharged<br />
Air Sparging (AS) / Soil Vapor Extraction (SVE) System<br />
MCB CAMP LEJEUNE - Building 1613<br />
08112199 14:oo 8884<br />
86<br />
2900 572 233<br />
0.46 9.54<br />
28094.27<br />
08/19/99 14:50 9058<br />
84<br />
3000 573 241<br />
0.45 9.62<br />
28163.71<br />
08124199 7~56 9171<br />
120<br />
2200 565 179<br />
0.64 10.22<br />
28210.42<br />
09/01/99 9:54 9321<br />
197<br />
1400 560 115<br />
1.05 10.77<br />
28276.02<br />
09/09/99 lo:18 9468<br />
87<br />
3100 564 253<br />
0.46 10.46<br />
28341.04<br />
09/14/99 9:16 9589<br />
27<br />
3000 562 245<br />
0.14 3.15<br />
28375.36<br />
1 O/04/99 l4:45 9701<br />
434<br />
3400 564 277<br />
2.31 57.23<br />
28516.24<br />
10111199 15:lO 9876<br />
3100 561 254<br />
28724.87<br />
1 O/l 9199 14:16 10009<br />
126<br />
2900 560 238<br />
0.67 14.27<br />
28764.42<br />
759 10122<br />
3100 554 257<br />
28798.02<br />
11/03/99 9:40 10221<br />
2900 555 240<br />
28798.02<br />
11 /OQ/QQ IO:45 10349<br />
3000 561 246<br />
28798.02<br />
11 II 5199 13:13 10493<br />
2900 555 240<br />
28798.02<br />
11122l99 13:lO 10596<br />
71<br />
3100 555 257<br />
0.38 8.67<br />
28816.63<br />
12/03/99 1503 10866<br />
3200 546 269<br />
28865.42<br />
12/12/99 15:20 11080<br />
3000 544 253<br />
28865.42<br />
12/17/99 15:07 11202<br />
3400 541 289<br />
28865.42<br />
01/04/00 9:46 11629<br />
21<br />
3100 545 261<br />
0.11<br />
3<br />
28888.66<br />
01/08/00 1358 11729<br />
2900 549 243<br />
28894.11<br />
01112/00 9:58 11819<br />
23<br />
2900 540 247<br />
0.07<br />
2<br />
28896.97<br />
01/21/00 4133 12041<br />
9<br />
1400 532 121<br />
0.05<br />
1<br />
28906.43<br />
01/27/00 16:29 12187<br />
2300 535 198<br />
28908.00<br />
02/09/00 12:55 12306<br />
2<br />
2800 540 238<br />
0.01<br />
0<br />
28908.57<br />
02116lOO 14:24 12476<br />
2500 545 211<br />
28909.37<br />
02/27/00 17:15 12741<br />
2500 545 211<br />
28909.37<br />
03/08/00 9:30 12974<br />
3174 554 263<br />
28909.37<br />
03/14/00 14:25 13123<br />
254<br />
6054 538 517<br />
1.35 63<br />
29103.43<br />
03/20/00 II:36 13264<br />
2733 552 228<br />
29287.07<br />
03/27/00 IO:30 13430<br />
2340 559 192<br />
29287.07<br />
04/05/00 IO;15 13646<br />
1<br />
2516 560 207<br />
0.01<br />
0<br />
29287.51<br />
04/11/00 7:oo 13763<br />
3890 585 305<br />
29287.75<br />
04/17/00 7:oo 13932<br />
9.8<br />
2567 556 212<br />
0.05<br />
1<br />
29291.24<br />
04/27/00~ 9:301 14173) 4310 566 350 29296.21<br />
Bldg 1613 Updated: 11/10/00 Page2 of 3
Cumulative Mass of Volatb, ydrocarbons Discharged<br />
Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />
MCB CAMP LEJEUNE - Building 1613<br />
SVE Stack _,,, ,,,, ,, ., .“. ‘- ., ,.<br />
GuIQ~litt”*~Mdss ,.<br />
TRDischajge d;Hydfocartjoirs<br />
'.<br />
Rati' Discharged Comments<br />
(rgg/i] ;, (lb;/day), @a)<br />
05/02/00 II:301 14294 10.4 2922 558 241 0.06 1 29299.21<br />
05/09/00 8:00 14461<br />
10.8<br />
3100 560 254<br />
0.06 1<br />
29307.91<br />
05/15/00 7:30 14604<br />
2990 556 247<br />
29311.80<br />
05/25/00 8:21 14742<br />
23<br />
3200 565 260<br />
0.12 3<br />
29319.99<br />
06/01/00 8:40 14909<br />
35<br />
3300 558 272<br />
0.19 5<br />
29345.66<br />
06/06/00 9:20 15030<br />
23<br />
3200 561 262<br />
0.12 3<br />
29364.31<br />
06/15/00 1355 15203<br />
17<br />
3100 571 249<br />
0.09 2<br />
29381.92<br />
06/22/00 14:13 15415<br />
55<br />
3500 569 283<br />
0.29 7<br />
29423.52<br />
07/07/00 12:15 15740<br />
24<br />
3800 568 307<br />
0.13 4<br />
29497.40<br />
07/14/00 12:58 15907<br />
15<br />
3500 566 284<br />
0.08 2<br />
29516.68<br />
07/21/00 14144 16075<br />
9<br />
3000 560 246<br />
0.05 1<br />
29527.47<br />
07/28/00 13:44 16219<br />
26<br />
2900 582 229<br />
0.14 3<br />
29539.14<br />
08/02/00 12:48 16338<br />
11<br />
3100 582 245<br />
0.06 1<br />
29549.34<br />
08/11/00 12:37 16477<br />
18<br />
2800 583 221<br />
0.10 2<br />
29558.53<br />
08/15/00 8:05 16568<br />
6<br />
3200 569 258<br />
0.03 1<br />
29563.51<br />
08/22/00 8:15 16749<br />
7<br />
3300 566 268<br />
0.04 1<br />
29569.66<br />
08/28/00 1358 16885<br />
4<br />
3200 574 256<br />
0.02 0<br />
29573.57<br />
09/07/00 II:38 17073<br />
26<br />
2200 563 180<br />
0.14 2<br />
29584.18<br />
09/11/00 1451 17169<br />
7<br />
3200 569 258<br />
0.04 1<br />
29590.35<br />
09/19/00 IO:58 17254<br />
10<br />
3000 568 243<br />
0.05 1<br />
29593.92<br />
09/28/00 14:lO 17288<br />
16<br />
3900 561 319<br />
0.09 2<br />
29596.46<br />
10/03/00 13:17 17407<br />
11<br />
3900 568 316<br />
0.06 2<br />
29606.59<br />
10/11/00 15:40 17564<br />
3800 549 318<br />
29611.99<br />
10/16/00 13:40 17657<br />
4<br />
3700 564 301<br />
0.02<br />
1<br />
29613.11<br />
10/26/00 7~57 17891<br />
3<br />
3100 551 259<br />
0.02<br />
0<br />
29617.70<br />
10/31/00 757 18011<br />
6<br />
3500 553 291<br />
0.03<br />
1<br />
29620.70 Extra<strong>pol</strong>ated Data<br />
Notes:<br />
C = (PPM measured x K x (M&g) /IOCQ<br />
C: vapor concentration (mgll)<br />
PPM messu,ed FID reading (PPM)<br />
K: number of carbon atoms in calibration gas<br />
(1 in methane)<br />
TH: total hydrocarbons calculated as gasoline<br />
(GW<br />
percent water vapor by volume<br />
SVE Stack pipe diameter<br />
0.003<br />
4<br />
l<br />
Q = (1-B) x V x A x (P/P std) x (T&T)<br />
Q: vapor flowrate (SCFM)<br />
8: percent water vapor in flowstream, calculation assumes saturated water stream or B = 0.<br />
V: vapor velocity (fUmin)<br />
A: cross-sectional area (sq. ft)<br />
P: absolute pressure of flowstream (” Hg)<br />
Pstd: standard pressure (29.92” Hg)<br />
T: absolute temperature of flowstream (degrees Rankine)<br />
Tsfd standard temperature (528 degrees Rankine)<br />
at68degrees F(fromPerry'shandbook)<br />
Estimated value due to malfunctionng instrument<br />
M=QxCx0.0895<br />
M: hydrocarbon recovery rate (lb/day)<br />
Assumptions:<br />
Mg = 128 mglmg-mole<br />
Kg = 24.07 dsm’WlO% gm -mole<br />
B = 0.003 from Perry’s Chemical Handbook<br />
A = 0.0873 sq. ft<br />
Bldg 1613 Updated: 11/10/00 Page3of 3
n<br />
Building 1613<br />
VOC Pounds Removed and Costs<br />
400<br />
h<br />
$2.000.00<br />
250<br />
$1,200.00<br />
150<br />
Q 100<br />
r<br />
J\<br />
r 50<br />
<br />
0<br />
F- Nob99 Dee-99 Jan-00 Feb-00 Mar-00<br />
c.2<br />
Apr-00 May-00 Jun-00 J&O0 Aug-00 Sep-00 01%00<br />
Past 12 Months<br />
$600.00<br />
$400.00<br />
$200.00<br />
60.00<br />
- VOC Pounds Removed t Cost/ Pound Removed -Average -Average<br />
Task Order 11 - Project 920704<br />
Camp Lejeune MCB, NC<br />
October 31,200O
n<br />
Building 1613 Cumulative VOC Pounds Removed<br />
2g,&JlJ ,<br />
29.600<br />
29,400<br />
p”<br />
29,200<br />
:<br />
n 29,000<br />
26,600<br />
26.600<br />
26,400<br />
Now99<br />
Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00<br />
Past 12 Months<br />
/<br />
-Cumulative<br />
Pounds Removed<br />
Task Order 11 - Project 920704 Camp Lejeune MCB, NC October 31.<strong>2000</strong>
MONTHLY PROGRESS REPORT - SHORT FORM<br />
Report Dates: October 1, <strong>2000</strong> to October 31, <strong>2000</strong> Hard Copies Distributed to:<br />
Contract No.: N62470-97-D-5000 COTR:<br />
Karen Wilson<br />
(757)322-4817<br />
Order No.: 0014<br />
Wilsonke@efdlant.navfac.navv.mil<br />
I<br />
Pr-,ect No.: 920764<br />
RAC CM:<br />
(757)396-5121<br />
Greg Hedley<br />
Project Name: Hadnot Point Fuel Farm Hedlevqs@efdlant.navfac.navy.mil ext. 383<br />
Project Location: MCB Camp Lejeune, NC Project Controls Manager:<br />
Linda Barberousse<br />
(757)363-7190<br />
Project Manager: James A. Dunn, Jr., P.E.<br />
Lbarberousse@theitqroup.com<br />
Project Description: Contract Files<br />
Construction and Operation of Biosparging, Air Sparging, and Soil Vapor<br />
Extraction Systems with aggressive fluid vapor recovery at Hadnot Point<br />
Fuel Farm/Building 1115.<br />
Scheduled Web Site Posting Date:<br />
Original Contract Start Date:<br />
Original Contract Completion Date:<br />
Current Contract Completion Date:<br />
O&M Completion Date:<br />
Current Projected Completion Date:<br />
Current TO Ceiling:<br />
Total $ to Date:<br />
Remaining Funds:<br />
Estimated Report Period:<br />
Forecast @ Completion:<br />
2,826,904.00<br />
2,012,115.00<br />
814,789.OO<br />
70,696.OO<br />
2,822,147.00<br />
Ht a i extraction wells recovered 61 gals. of product. Normal O&M of the SE system resulted in recovery of 52,227 Ibs. of<br />
hydrocarbons. Continued daily gauging of wells and Buildings 1101 and 1068 at HPFF and twice weekly checking of all twelve<br />
buildings. Re-caulked buildings 1108, 1115 and 1068 to close potential vapor pathways. Conducted 6 AFVR events on various<br />
Current schedule attached.<br />
None.<br />
Orig<br />
Provide RA for Hadnot Point Fuel Farm bldg.<br />
1115, Camp Lejeune, NC.<br />
06/30/98 07122199 $1,483,522.00 $58,413.00 $1,541,935.00<br />
1 Additional 12 months of O&M through 8/31/00 05128199 08/31 /OO $214,989.00 $11,525.00 $226514.00<br />
2<br />
Install trench at East end of Bldg 1101 and<br />
install blower.<br />
12129199 08/01 /OO $0.00 $0.00 $0.00<br />
3<br />
Scope Change - Completely replace all O&M<br />
for the current period<br />
01/l 3/00 08/01 /OO $0.00 $0.00 $0.00<br />
Prep Work Plans to provide trenching around<br />
4 Bldg. 1101 and trenching at Wells HPFF-28 01/28/00 08/01 /OO $7,122 $431 .oo !§7,553.00<br />
-,m and MW-15<br />
Exploratory Excavation around MW HPFF-28<br />
5<br />
and MW-15 to attempt to determine the<br />
source of free product. Conduct SVE<br />
02/22/00 08/01 /OO $80,848.00 $3,166.00 $84,014.00<br />
influence testing program<br />
6 Seal Bldg. 1101 and conduct test of biosparge 03/01/00 08/01 /OO $28,004.00 $1,219.00 $29,223.00
located at Hadnot Pt. Fuel Farm and Bldg<br />
9 I Continue O&M for 12 months 1 05/12/00 / 04/30/01 / $559,288.00 1 $25,381.00 / $584,669.00<br />
10 / O&M Activities 1 09/02/00 / 04/30/01 1 $17,997.00 1 $1,103.00 1 $19,100.00<br />
11<br />
Event Monitoring on three occasions in Bldg.<br />
1101,1104,1114.<br />
09/28/00 04/30/01 $47,946.00 $l,660y<br />
I I I I I<br />
Totals $2,826,904.00 $119,218.00 $2,946,122.00<br />
Approved<br />
by:<br />
Roland Moreau, P.E.<br />
Program Manager<br />
Attachments: Performance Report (2)<br />
Cost Performance Curve (1)<br />
Schedule (1)<br />
Site Data (9)<br />
Work Directive Log (1)<br />
LANTDIV RAC Field Form (2)
ITCorporation<br />
START DATE 01 JA<br />
FIN DATE JOAPROI<br />
PAGE NO. 1<br />
DATA DATE<br />
03NOVOt<br />
Petformance<br />
Report<br />
WBS<br />
Code<br />
Description<br />
Otl<br />
Bud<br />
ant<br />
ant<br />
Rev<br />
ClU<br />
Qnt<br />
Task<br />
Unit<br />
Ins<br />
ant<br />
Task Orig.<br />
% Budg<br />
Camp S<br />
s<br />
Current<br />
Rev.1 Budg.<br />
Adjust $<br />
Earned Actual ETC Forecast Variance Variance % Physl<br />
$ t<br />
CPI At from from of %<br />
ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />
03001000 Abandon/Remove Fuel Lines<br />
100<br />
0<br />
loo %<br />
7<br />
7 238928 0 238928 16725 17277 1.03 221500 238777 -151<br />
-151 8.5 0.6<br />
05000000 SVE MW-15<br />
IW<br />
0<br />
IW %<br />
0<br />
0 20730 0 28730 0 0 0.00 26739 28730 0<br />
0 1.0 0.0<br />
OBOOI 000<br />
500 CY Soil Collection<br />
IO<br />
0<br />
loo %<br />
0<br />
0 54165 0 54165 0 0 0.00 54165 54165 0<br />
0 1.9 0.0<br />
10000000 O&M Manual 8 As-BUM<br />
IW<br />
0<br />
loo %<br />
loo<br />
100 11136 0 11138 11138 35806 3.21 0 35806 24668<br />
24668 0.4 0.4<br />
<strong>2000</strong>0000 work Plans<br />
100<br />
0<br />
loo %<br />
IW<br />
ICC 15109 0 15109 15109 10440 0.69 0 10440 469<br />
469 0.5 0.5<br />
21000000 Drawings & Specs<br />
100<br />
0<br />
1w %<br />
WJ<br />
100 16682 0 16682 16682 210 0.01 0 210 -16472<br />
-16472 0.6 0.6<br />
21006010 EventSummary Rpt _ 1101<br />
100<br />
0<br />
lee %<br />
50<br />
50 17997 0 17997 8999 9248 1.03 8750 17998 1<br />
1 0.6 0.3<br />
2<strong>2000</strong>000 Const Sched<br />
IW<br />
0<br />
lee %<br />
0<br />
103 3219 0 3219 3219 0 0.00 0 0 -3219<br />
-3219 0.1 0.0<br />
23000000 Initial Procurement<br />
IO<br />
0<br />
loo 56<br />
loo<br />
1w 9853 0 9853 9853 14523 1.47 0 14523 4670<br />
4670 0.3 0.3<br />
24000000 Mobmemob<br />
100<br />
0<br />
1w 56<br />
1w<br />
1W 37827 0 37827 37027 49438 1.31 0 49439 11611<br />
11611 1.3 1.3<br />
25OOoOGl<br />
NW Site Prep<br />
100<br />
0<br />
loo %<br />
lrn<br />
1w 7075 0 7075 7075 4614 0.68 0 4814 -2261<br />
-2261 0.3 0.3<br />
26OOOGJO Refwb Hadnot WWTP<br />
100<br />
0<br />
1w %<br />
100<br />
1w 12879 0 12079 12879 76.58 0.59 0 7658 -5221<br />
-5221 0.5 0.5<br />
3ooOOocKJ NW lnst Air Sparge Wells<br />
1W<br />
0<br />
ICC %<br />
IW<br />
IW 8245 0 8245 8245 12905 1.57 0 12905 4660<br />
4660 0.3 0.3<br />
30100900 NW lnst Bio Sparge Wells<br />
100<br />
0<br />
1w %<br />
IW<br />
1W 36564 0 36561 36564 30073 0.82 0 30073 6491<br />
4491 1.3 1.3<br />
30<strong>2000</strong>00 NW Bii Sparge Pilot Test<br />
100<br />
0<br />
loo %<br />
loo<br />
1cO 4786 0 4786 4706 20209 4.22 0 20209 15423<br />
15423 0.2 0.2<br />
31000000 NW SVE Horiz W&Trench<br />
loo<br />
0<br />
loo %<br />
1w<br />
loo 96388 0 96388 963s3 40367 0.42 0 40367 -56021<br />
-56021 3.4 3.4<br />
33OOOoOo NW BiolSVEIAir Sparge WH<br />
100<br />
0<br />
1w %<br />
IW<br />
IW 27714 0 27714 27714 15747 0.57 0 15747 -11967<br />
-11937 1.0 1.0<br />
34000000 NW Remed Sys Install<br />
1W<br />
0<br />
loo %<br />
loo<br />
loo 137685 0 137685 137685 96993 0.70 0 96996 -40689<br />
-40689 4.9 4.9<br />
35000000 T&D DebriwWaste<br />
1W<br />
0<br />
ICC %<br />
loo<br />
IW 10976 0 10976 10976 2570 0.23 0 2578 4395<br />
-8390 0.4 0.4<br />
36000000 NW Site Restoration<br />
IO<br />
0<br />
IW %<br />
la,<br />
loo 6271 0 6271 6271 219x 3.49 0 21900 15629<br />
15629 02 0.2<br />
37000000 NW Sys Startup/Opt<br />
100<br />
0<br />
10 %<br />
loo<br />
100 7681 0 7881 7681 10445 1.33 0 10445 2564<br />
2564 0.3 0.3<br />
40000000 Sye O&M<br />
IW<br />
0<br />
loo %<br />
IW<br />
IW 10162 0 10162 10162 31936 3.06 0 31086 20924<br />
20924 0.4 0.4<br />
40100000 ASlSVE Main&HPFF/NW & SE<br />
100<br />
0<br />
loo %<br />
70<br />
70 930&l 0 93oe4 65159 40504 0.62 33cw 78594 -14580<br />
-14530 3.3 2.3<br />
40<strong>2000</strong>00 Operation of HPPFF NW SE<br />
100<br />
0<br />
IW %<br />
70<br />
70 194146 0 194146 135902 74773 0.55 105000 179773 -14373<br />
-14373 6.9 4.8<br />
40300000 AFVRModl<br />
100<br />
0<br />
loo 56<br />
70<br />
70 76630 0 76630 53641 37529 0.70 39100 76629 -1<br />
-1 2.7 1.9<br />
40400000 Bldg 1101<br />
loo<br />
0<br />
loo %<br />
loo<br />
loo 61395 0 61395 61395 67640 1.10 0 67640 6245<br />
6245 2.2 2.2<br />
40500000 Gauging & Sniffing<br />
1w<br />
0<br />
loo 56<br />
70<br />
70 137324 0 137324 96127 901% 0.94 47064 137210 -114<br />
-114 4.9 3.4<br />
40609000 HPFF28&MW15ExplorEvac&SVE<br />
lea<br />
0<br />
loo %<br />
1W<br />
IW 88341 0 88341 68341 79579 0.90 0 79579 8762<br />
-8762 3.1 3.1<br />
4ffi50000 Emergency Pwr-Bldg 1101<br />
100<br />
0<br />
ml %<br />
17<br />
17 26750 0 26750 4548 4444 0.98 20823 25266 -1484<br />
-1484 0.9 0.2<br />
40700000 Caulk 1 101IBiosparge Tst<br />
loo<br />
0<br />
ICC %<br />
1w<br />
1w 28798 0 28799 20790 11728 0.41 0 11728 -17070<br />
-17070 1.0 1.0<br />
40800000 Install Monitoring Equipm<br />
loo<br />
0<br />
IW %<br />
4<br />
4 47946 0 47946 1918 2149 1.12 45797 47946 0<br />
0 1.7 0.1<br />
50000000 Site Investigation<br />
loo<br />
0<br />
loo %<br />
100<br />
1w 0 0 0 0 627 0.00 0 627 627<br />
627 0.0 0.0<br />
55000000 SE Site Prep<br />
IW<br />
0<br />
1w %<br />
1W<br />
100 7453 0 7453 7453 6247 0.84 0 6247 -1206<br />
-1206 0.3 0.3
ITCorporation “<br />
START DATE 01 JA.<br />
FIN DATE JOAPROI<br />
Order14-920764 PAGE NO. 2<br />
DATA DATE 03NOVO[<br />
Performance<br />
Report<br />
WBS<br />
Code<br />
Description<br />
Oil<br />
Bud<br />
Qnt<br />
Qnt<br />
Rev<br />
CUr<br />
Qnt<br />
Task<br />
Unit<br />
Ills<br />
Qnt<br />
Task orlg.<br />
% Budg<br />
Comp $<br />
$ Current Earned Actual ETC Forecast Variance Vartance % Physl<br />
RW.l Budg. s s CPI At from from of %<br />
Adjust $ ToDate Comp. Org. Bud Cur. Bud Praj Comp<br />
60000000<br />
SE lnst Air Sparge<br />
Wells<br />
loo<br />
0<br />
loo %<br />
100<br />
loo<br />
48961<br />
48951<br />
48961 41372 0.84 0 41372 -7589<br />
-7589<br />
1.7 1.7<br />
60100000<br />
SE lnst Bio Sparge<br />
Wells<br />
loo<br />
0<br />
ICC %<br />
IW<br />
loo<br />
29729<br />
29729<br />
29729 31323 1.05 0 31323 1594<br />
1594<br />
1.1 1.1<br />
61000000<br />
SE SVE Horiz<br />
WelVTrench<br />
1w<br />
0<br />
1Ca %<br />
100<br />
1w<br />
220957<br />
220957<br />
220957 291379 1.32 0 291379 70422<br />
70422<br />
7.8 7.8<br />
63000W0<br />
SE Bio/SVE/Air Sparge WH<br />
IW<br />
0<br />
IW %<br />
100<br />
IW<br />
74293<br />
74296<br />
742% 65485 0.88 0 65485 -8811<br />
-6811<br />
2.6 2.6<br />
64wooM)<br />
SE Remed<br />
Sys Install<br />
1w<br />
0<br />
la0 %<br />
ICC<br />
IW<br />
206879<br />
206879<br />
206879 185426 0.90 0 185426 -21453<br />
-21453<br />
7.3 7.3<br />
66woow<br />
SE Site Restoration<br />
loo<br />
0<br />
IW %<br />
100<br />
loo<br />
5969<br />
5969<br />
5969 55655 9.49 0 53655 50666<br />
5068s<br />
02 02<br />
86666666<br />
2W0 Restructuring<br />
Costs<br />
loo<br />
0<br />
1w 36<br />
0<br />
0<br />
0<br />
0<br />
0 9340 0.00 -9630 290 -290<br />
-290<br />
0.0 0.0<br />
67000000<br />
SE Sys StartuplOpt<br />
loo<br />
0<br />
loo %<br />
loo<br />
IW<br />
116%<br />
11656<br />
11656 16018 1.37 0 16018 4362<br />
4362<br />
04 0.4<br />
7woowo<br />
AFVR<br />
loo<br />
0<br />
loo %<br />
loo<br />
1w<br />
42C&5<br />
42035<br />
42036 68419 1.63 0 68419 as&l<br />
26384<br />
1.5 1.5<br />
awwwo<br />
Sampling<br />
&Analysis<br />
1w<br />
0<br />
1w %<br />
58<br />
58<br />
69548<br />
89546<br />
40337 33876 0.84 393W 72876 3330<br />
3330<br />
2.5 1.4<br />
9woowo<br />
Fuel<br />
1w<br />
0<br />
1w 56<br />
Bl<br />
90<br />
3211<br />
3211<br />
2890 19449 6.73 92 19541 16330<br />
16330<br />
0.1 0.1<br />
95owooo<br />
Conaete<br />
Pads<br />
loo<br />
0<br />
IW %<br />
loo<br />
loo<br />
0<br />
0<br />
0 5772 0.00 0 5772 5772<br />
5772<br />
0.0 0.0<br />
9809<strong>2000</strong><br />
Equipment<br />
loo<br />
0<br />
loo %<br />
58<br />
58<br />
153442<br />
153442<br />
as996 30035 0.34 87387 117422 -36020<br />
-36020<br />
5.4 31<br />
99WOlW<br />
Admin<br />
& Support<br />
loo<br />
0<br />
loo %<br />
80<br />
80<br />
252339<br />
252339<br />
201871 214006 1.06 41970 255977 3638<br />
3638<br />
a.9 7.1<br />
994WlW<br />
Per Lhls<br />
IW<br />
0<br />
loo %<br />
80<br />
80<br />
145743 0 145743 118594 96466 0.83 42293 138759 -6904 aa4 5.2 4.1<br />
2828994 0 2828994 2129829 2012115 0.95 810031 2822147 -4757 -4757 1w.o 74.9<br />
2828994 0 2828994 2129829 2012116 0.95 910031 2822147 -4757 4757 100.0 74.9
Task Order 14 Cost Performance Curve<br />
3000<br />
2500<br />
1500<br />
f--- Time Now 11/3/00<br />
1000<br />
500<br />
Physical % Complete = 74.9<br />
Financial % Complete = 71.2<br />
0<br />
Jul-00 Aug-00 Sep-00<br />
Nov-00 Dee-00 Jan-01 Feb-01 Mar-01<br />
Apr-01<br />
#<br />
Time in Months
start Date 01 JAN98 Eady Bar<br />
014x<br />
sheet1cf1<br />
Date Revision<br />
:inish Date 3OAPROl Progress Bar IT Corporation<br />
CW Appoved<br />
Data Date 03NOVOO<br />
Critical Activity<br />
iun Date IONOVOO 08:21<br />
Task Order 14 - Project 920764<br />
0 Primavera Systems, Inc.<br />
Fuel Line Removal
Cumulative Mass of Vo, Hydrocarbons Discharged<br />
Air Sparge I Soil Va r Extraction System<br />
MCB Camp1 Lejeune - Hadnot Point Fuel Farm, North West<br />
SVE Stack<br />
02/15/99 14:oo<br />
02/16/99 lo:oo<br />
02/17/99 13:30<br />
02/18/99 lo:30<br />
02/19/99 13:oo<br />
02/22/99 15:15<br />
03/05/SS 6:00<br />
03/111S9 9:30<br />
03/18/SS 1 I:00<br />
03/25/99 14:45<br />
04/01/99 1o:oo<br />
04/06/99 13:oo<br />
04/13/99 15:oo<br />
04/20/99 14:oo<br />
04/30/99 1430<br />
owo4/99 14:Oo<br />
05/13/99 moo<br />
05/21/99 14:oo<br />
06/03/SS 6:30<br />
06/08/99 13:oo<br />
06/14/99 13:oo<br />
06/25/99 12:oo<br />
07/01199 8:oO<br />
07/09/99 12:oo<br />
07/14/99 12:30<br />
07/22/99 IO:30<br />
07/30/99 14:oo<br />
08/05/99 11:Oo<br />
08/l 3199 12:oo<br />
08/20/99 7:30<br />
08/24/99 10:45<br />
09/02/99 7:26<br />
09/08/99 7:26<br />
09/13/99 13:10<br />
09/23/99 13:lO<br />
10/05/99 1450<br />
10/14/99 13:12<br />
10120/99 838<br />
10/29/99 9:49<br />
11/04/99 15:42<br />
11/12/99 11:45<br />
11115/99 11:39<br />
11/22/99 15:09<br />
e/02/99 13:33<br />
v/08/99 1454<br />
94<br />
115<br />
141<br />
215<br />
411<br />
556<br />
725<br />
666<br />
929<br />
1027<br />
IISO<br />
1364<br />
1603<br />
1626<br />
1788<br />
1923<br />
2160<br />
2265<br />
2429<br />
2620<br />
2726<br />
2919<br />
3029<br />
3216<br />
3410<br />
3551<br />
3721<br />
3864<br />
3983<br />
4152<br />
4296<br />
4334<br />
4574<br />
4696<br />
4828<br />
4892<br />
4976<br />
5122<br />
5266<br />
5337<br />
5511<br />
5748<br />
5894<br />
327<br />
371<br />
233<br />
140<br />
427<br />
168<br />
88<br />
51<br />
35<br />
38<br />
1700<br />
53<br />
236<br />
582<br />
285<br />
100<br />
124<br />
85<br />
31<br />
137<br />
119<br />
51<br />
97<br />
266<br />
92<br />
144<br />
115<br />
115<br />
19<br />
20<br />
126<br />
137<br />
14<br />
162<br />
79<br />
30<br />
21<br />
18<br />
18<br />
300 531<br />
1300 528<br />
3000 536<br />
5500 549<br />
5300 571<br />
6500 566<br />
4700 570<br />
5600 570<br />
6600 569<br />
2800 555<br />
2900 542<br />
1700 551<br />
600 542<br />
1600 554<br />
5900 589<br />
5900 591<br />
5000 560<br />
1000 585<br />
1300 586<br />
1200 592<br />
3700 588<br />
6900 603<br />
500 585<br />
3800 587<br />
7200 595<br />
6600 587<br />
7300 587<br />
6800 491<br />
6800 491<br />
7300 592<br />
7300 560<br />
6600 576<br />
6700 582<br />
6800 572<br />
6800 559<br />
7200 565<br />
6800 580<br />
6800 573<br />
6800 585<br />
6400 558<br />
6700 579<br />
29<br />
128<br />
292<br />
516<br />
488<br />
598<br />
430<br />
512<br />
604<br />
263<br />
279<br />
156<br />
54<br />
146<br />
506<br />
505<br />
451<br />
86<br />
112<br />
102<br />
318<br />
631<br />
47<br />
352<br />
668<br />
612<br />
677<br />
753<br />
753<br />
680<br />
719<br />
632<br />
626<br />
638<br />
652<br />
693<br />
638<br />
646<br />
623<br />
624<br />
621<br />
___<br />
1.43<br />
1.74<br />
1.97<br />
1.24<br />
0.74<br />
2.27<br />
0.89<br />
0.47<br />
0.27<br />
0.19<br />
0.20<br />
9.04<br />
0.28<br />
1.26<br />
3.09<br />
1.52<br />
0.53<br />
0.66<br />
0.45<br />
0.16<br />
0.73<br />
0.63<br />
0.27<br />
0.52<br />
1.41<br />
0.49<br />
0.77<br />
0.61<br />
0.61<br />
0.10<br />
0.11<br />
0.67<br />
0.73<br />
0.07<br />
0.86<br />
0.42<br />
0.16<br />
0.11<br />
0.10<br />
0.10<br />
^ .^<br />
3.71 2.01<br />
19.96 38.51<br />
51.49 330.29<br />
57.20 663.15<br />
32.51 975.25<br />
121.60 1492.14<br />
34.35 1631.84<br />
21.44 1745.74<br />
14.67 1868.36<br />
4.38 1937.40<br />
5.04 1984.31<br />
126.22 2047.21<br />
1.38 2477.79<br />
16.40 2527.74<br />
140.30 3301.46<br />
68.47 3845.14<br />
21.49 4115.01<br />
5.10 4220.81<br />
4.54 4242.10<br />
1.51 4266.43<br />
20.75 4317.44<br />
35.76 4537.56<br />
1.14 4686.70<br />
16.26 4737.83<br />
84.52 5094.76<br />
26.78 5472.74<br />
46.37 5623.62<br />
41.24 5932.08<br />
41.24 6179.52<br />
6.15 6217.03<br />
6.85 6282.03<br />
37.91 6395.78<br />
40.84 6612.34<br />
6666.79<br />
4.35 6674.58<br />
53.45 6847.99<br />
23.98 7083.53<br />
9.22 7131.25<br />
6.23 7187.26<br />
5.35 7244.42<br />
5.32 7276.85<br />
Extra<strong>pol</strong>ated Data, System not sampled duetofulltank& electrical problem<br />
Extra<strong>pol</strong>ated Da<br />
Extra<strong>pol</strong>ated Da<br />
Hpff-nw Updated: 11/10/00 Page 1 of2
Cumulative Mass of Vo, Hydrocarbons Discharged<br />
r Extraction System<br />
MCB Camp1 Lejeune - Hadnot Point Fuel Farm, North West<br />
SVE Stack<br />
Commehts<br />
01/12/00 11:30 6460<br />
01/21/W 1242 8665<br />
02/01/w 13:46 6744<br />
02/07/W 13:46 6744<br />
02/16/W lo:47 6808<br />
02/25/W 12:38 7014<br />
03/16/W 13:30 7429<br />
03/21/W IO:06 7529<br />
03/28/W 10:00 7610<br />
04/05/w 13:30 7774<br />
04/11/w 930 7915<br />
04/18/W 9:35 8040<br />
04/27/W 10:30 8161<br />
05/03/w 730 8305<br />
05/09/w lo:00 8391<br />
05/15/00 14:30 8536<br />
05/24/W 8:15 8745<br />
06/01/W Ml5 8819<br />
06/06/W 1430 8928<br />
06/15/w 15:50 9146<br />
06/23/W 14:20 9338<br />
07/06/W 13:12 9638<br />
07/13/w 13:31 9806<br />
07/20/W 13:16 9974<br />
07/28/W 11:41 10148<br />
08/l l/W II:02 10392<br />
06/15/w 10:12 10428<br />
08/23/w 7:35 10511<br />
08/29100 7:45 10628<br />
09/13/w 8:05 10854<br />
09/22/w 1319 11010<br />
10/06/W 13:56 11134<br />
10/12/w 13156 11220<br />
10/18/W lo:02 11359<br />
10/25/W 13:25 11530<br />
10/31/w 13:25 11674<br />
9<br />
94<br />
355.5<br />
36.9<br />
16.4<br />
46.4<br />
51.4<br />
112<br />
84<br />
187<br />
42<br />
16<br />
120<br />
35<br />
8<br />
13<br />
64<br />
66<br />
24<br />
36<br />
32<br />
24<br />
16<br />
26<br />
22<br />
22<br />
6300<br />
6900<br />
3800<br />
7300<br />
7700<br />
6652<br />
6758<br />
6980<br />
3588<br />
6891<br />
3500<br />
3500<br />
3500<br />
8100<br />
6000<br />
7100<br />
1200<br />
600<br />
7800<br />
7900<br />
5700<br />
7600<br />
7000<br />
7800<br />
7700<br />
7800<br />
8200<br />
8100<br />
8400<br />
8800<br />
9700<br />
7900<br />
8200<br />
7900<br />
8425<br />
568<br />
549<br />
548<br />
460<br />
558<br />
565<br />
571<br />
559<br />
584<br />
570<br />
565<br />
560<br />
562<br />
562<br />
578<br />
574<br />
583<br />
591<br />
582<br />
589<br />
594<br />
587<br />
586<br />
595<br />
579<br />
587<br />
584<br />
570<br />
569<br />
573<br />
579<br />
587<br />
574<br />
566<br />
574<br />
575<br />
603<br />
684<br />
379<br />
714<br />
710<br />
602<br />
632<br />
609<br />
297<br />
566<br />
290<br />
325<br />
325<br />
548<br />
545<br />
634<br />
110<br />
56<br />
870<br />
724<br />
528<br />
656<br />
595<br />
702<br />
683<br />
727<br />
783<br />
774<br />
798<br />
827<br />
861<br />
749<br />
788<br />
749<br />
789<br />
0.25<br />
0.29<br />
0.20<br />
0.05<br />
0.50<br />
13.50<br />
17.90<br />
6.67<br />
3.06<br />
26.91<br />
1.89 50.20<br />
0.20 9.95<br />
0.10 2.85<br />
0.25 12.11<br />
0.27 13.33<br />
0.60 33.82<br />
0.45 4.42<br />
0.99 4.99<br />
0.22 14.46<br />
0.09 4.02<br />
0.64 37.45<br />
0.19 9.91<br />
0.04 2.67<br />
0.07 4.23<br />
0.34 22.13<br />
0.35 24.58<br />
0.13 8.85<br />
0.19 13.87<br />
0.17 12.59<br />
0.13 9.83<br />
0.09 5.70<br />
0.14 9.75<br />
0.12 7.84<br />
0.12 8.26<br />
7592.87<br />
7726.96<br />
7787.39<br />
7767.39<br />
7771.47<br />
7784.60<br />
8017.30<br />
8073.37<br />
8073.37<br />
8244.88<br />
8421.56<br />
8447.46<br />
8454.64<br />
8463.19<br />
8484.88<br />
8561.73<br />
8767.08<br />
8826.01<br />
8847.38<br />
8870.05<br />
8927.30<br />
9043.61<br />
9188.78<br />
9354.55<br />
9400.18<br />
9435.24<br />
9455.01<br />
9535.79<br />
9617.28<br />
9723.28<br />
9808.62<br />
9866.55<br />
9894.39<br />
9939.15<br />
10001.82<br />
10050.12<br />
System down for repairs to Separate<br />
Extra<strong>pol</strong>ated<br />
Da<br />
Notes:<br />
C = (PPM-,& Y K x (M&J I1000<br />
C: vspar concentration (mgfl)<br />
PPMww: FID reading (PPM)<br />
K: numberofmrbon atoms in calibration gas<br />
(1 in methane)<br />
TH: total hydrocarbons calculated ss gasoline<br />
GRO)<br />
percent water vapor by volume 0.003<br />
SVE Stack pipe diameter 4<br />
Q=(l-B)xVxAx(P/P~)xCTsmlT)<br />
(1: vsporflowale (SCFM)<br />
8: percent vaster vspor in flowstream<br />
V: vapor velocity (ftlmin)<br />
A: cross-sectional area (sq. fl)<br />
P: absolute pressure offlowstrsam (” Hg)<br />
Pm standard pressure (29.92” Hg)<br />
r: absolute temperature of Rowstream (degrees Rankine)<br />
T*. standard lempsmture (528 degrees Rankine)<br />
at 68 degrees F (from Peny’s handbook)<br />
* Estimated value due to malfunctionng instrument<br />
M=QxCx0.0895<br />
M: hydrocarbon recovery rate (lb/day)<br />
CM = [delta (blower meter houn)/24) * [(Mprevious + Mwrrent)/Z) + CMprevious<br />
Assumptions:<br />
Mg = 128 mgimg-mole<br />
Kg = 24.07 dsm”3/l(r6 gm -mole<br />
B = 0.003 from Perry’s Chemical Handbook<br />
A = 0.0873 sq. ft<br />
Hpff-nw Updated: 1 l/10/00 Page 2 of 2
0<br />
A<br />
HPFF North West VOC Pounds Removed and Costs<br />
700 I-.<br />
$30.00<br />
600<br />
500<br />
$20.00<br />
4<br />
5<br />
0<br />
400<br />
n 300<br />
$15.00 5<br />
rs<br />
200<br />
$10.00<br />
100<br />
$5.00<br />
0<br />
Now99 De&99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 Ott-00<br />
Past 12 Months<br />
60.00<br />
- VOC Pounds -+- Cost/ Pound Removed -Average -Average<br />
Task Order 14 - Project 920764 Camp Lejeune MCB, NC October 31,200O
HPFF North West Cumulative VOC Pounds Removed<br />
lO,OO(<br />
a<br />
Nov-99 Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00<br />
Past 12 Months<br />
-Cumulative<br />
Pounds Removed<br />
Task Order 14 - Project 920794 Camp Lejeune MCB, NC October 31, <strong>2000</strong>
Cumulative Mass of Voli ydrocarbons Discharged<br />
Air Sparg I Soil Vapor Extraction System<br />
MCB Camp Lejeune - Hadnot Point Fuel Farm, South East<br />
SVE Stack<br />
03/30/99 7:30<br />
04/01/99 10:30<br />
04/02/99 IO:00<br />
04/09/99 8:00<br />
04/16/99 9:30<br />
w/23/99 8:30<br />
05/06/99 10%<br />
05/13/99 8:30<br />
05/19/99 8:30<br />
06/02/99 11:00<br />
06/09/99 1 I:00<br />
06118199 8:50<br />
06/24/99 12~30<br />
07/07/QQ 13:oo<br />
07/15/99 II:00<br />
07/21/99 9:oo<br />
08/02/99 950<br />
08/12@9 9:35<br />
08/19/99 lo:00<br />
08125199 7:30<br />
09/01/99 13:45<br />
09/10/99 13:45<br />
09/l 3/99 9:30<br />
10/06/Q9 12:30<br />
10/14/SS 9:19<br />
10/22/99 8:Ol<br />
10/28/99 13:ll<br />
11/04/99 12:oo<br />
11/12/99 752<br />
11116199 9:28<br />
11122199 IO:30<br />
12/02/99 IO:13<br />
12108199 11:33<br />
213<br />
236<br />
304<br />
402<br />
485<br />
563<br />
584<br />
652<br />
937<br />
1005<br />
1105<br />
1251<br />
1505<br />
1626<br />
1766<br />
2055<br />
2295<br />
2463<br />
2607<br />
2849<br />
3012<br />
3395<br />
3584<br />
3734<br />
3877<br />
4045<br />
4237<br />
4333<br />
4477<br />
4588<br />
4730<br />
6776<br />
5654<br />
17907<br />
13147<br />
4555<br />
10391<br />
8535<br />
3671<br />
2465<br />
2109<br />
9103<br />
2514<br />
1934<br />
2277<br />
1520<br />
2236<br />
2459<br />
4606<br />
5174<br />
10105<br />
1500<br />
1223<br />
3119<br />
1469<br />
961<br />
647<br />
14118<br />
8360<br />
11248<br />
2002<br />
1078<br />
3895<br />
1300<br />
6600<br />
6300<br />
6200<br />
600<br />
2200<br />
800<br />
7200<br />
7600<br />
7500<br />
3300<br />
6100<br />
5800<br />
4300<br />
5800<br />
5900<br />
6900<br />
6400<br />
6800<br />
7200<br />
7000<br />
7000<br />
6700<br />
6900<br />
6400<br />
6600<br />
7700<br />
6700<br />
6600<br />
7000<br />
544<br />
567<br />
567<br />
569<br />
544<br />
548<br />
546<br />
566<br />
572<br />
592<br />
543<br />
581<br />
587<br />
582<br />
588<br />
583<br />
584<br />
584<br />
577<br />
578<br />
572<br />
570<br />
574<br />
576<br />
552<br />
565<br />
564<br />
567<br />
566<br />
588<br />
584<br />
447<br />
2176<br />
2077<br />
2037<br />
209<br />
777<br />
284<br />
2431<br />
2717<br />
1341<br />
2316<br />
2180<br />
1766<br />
2297<br />
2295<br />
2607<br />
2418<br />
2748<br />
2700<br />
2709<br />
2432<br />
2201<br />
2131<br />
2147<br />
2509<br />
2172<br />
2143<br />
2188<br />
2140<br />
36.03<br />
30.07<br />
95.23<br />
69.91<br />
24.22<br />
55.26<br />
45.39<br />
19.52<br />
13.11<br />
11.22<br />
48.41<br />
13.37<br />
10.28<br />
12.11<br />
8.08<br />
11.89<br />
13.08<br />
24.49<br />
27.51<br />
53.74<br />
7.98<br />
6.50<br />
16.59<br />
7.81<br />
5.11<br />
4.50<br />
75.08<br />
44.46<br />
59.81<br />
10.65<br />
5.73<br />
6900 589 2153 20.71<br />
.^ _^<br />
1440.44 6,391.94<br />
5854.54 g-887.45<br />
17699.32 43.255.41<br />
12743.31 105,409.12<br />
454.10 128,229.64<br />
3843.79 135.213.72<br />
1152.29 137,399.51<br />
4248.29 145,050.33<br />
3343.36 190,125.75<br />
2727.50 198,726.14<br />
5809.11 216,510.73<br />
2771.59 242,610.35<br />
2006.58 2679894.87<br />
1914.06 277s778.15<br />
1662.02 288,208.39<br />
2442.26 312,919.57<br />
3050.74 340,384.56<br />
5300.31 369.613.25<br />
6402.80 404,722.60<br />
13217.57 503$X1.97<br />
1927.64 555.072.24<br />
1577.10 557,335.66<br />
3610.01 595.374.49<br />
1539.16 615‘649.35<br />
974.54 823,504.67<br />
865.40 628.986.15<br />
16858.57 691,020.02<br />
8640.40 793,015.89<br />
11471.99 833,240.66<br />
2084.59 873,910.39<br />
1097.87 881,269.83<br />
3990.96 896.324.28<br />
9303.37 931.221.90<br />
Extra<strong>pol</strong>ated<br />
t<br />
Hpff-se Updated: 11/10/00 Page1 of3
Cumulative Mass of Voli> ydrocarbons Discharged<br />
Air Sparg I Soil Vapor Extraction System<br />
MCB Camp Lejeune - Hadnot Point Fuel Farm, South East<br />
SVE Stack<br />
01/12/00 13:23 5461 6397<br />
7200<br />
569<br />
34.02 7079.99 1,107.956.60<br />
01121100 9:35 5664 2082<br />
7200<br />
555<br />
2384<br />
11.07 2362.41 1,147,890.08<br />
01/27/00 IO:31 5729 1594<br />
6700<br />
643<br />
8.48 1720.28 1,153,418.73<br />
02/01100 IO:01 5826 1733<br />
6600<br />
544<br />
2230<br />
9.22 1838.99 1,160,611.42<br />
02/04/00 10:15 5893 2017<br />
6600<br />
597<br />
2032<br />
10.73 1950.34 1,165,900.70<br />
02/07/00 $55 5961 1423<br />
7100<br />
614<br />
2125<br />
7.57 1439.23 1,170,702.60<br />
02/11IOO IO:23 6051 1616<br />
6200<br />
614<br />
1856<br />
8.59 1427.25 1,176,077.26<br />
02/15/00 13:53 6146 1442<br />
7000<br />
608<br />
2116<br />
7.67 1452.10 1.181,775.97<br />
02/18/00 12:41 6201 880<br />
7100<br />
585<br />
2230<br />
4.68 934.16 1,184,510.22<br />
02/25/00 14:39 6352 516<br />
7300<br />
586<br />
2289<br />
2.74 562.23 1,189.217.60<br />
03/07/M) 12:50 6557 404<br />
6700<br />
587<br />
2098<br />
2.15 403.32 1,193,341.30<br />
03/13/00 15:30 6660 1000<br />
6895<br />
564<br />
2170<br />
5.32 1032.66 1,198,422.68<br />
03Lmoo 900 6864 4372<br />
6800<br />
584<br />
2140<br />
23.25 4452.58 1,219,734.97<br />
03/29/00 955 7029 369<br />
7952<br />
593<br />
2464<br />
1.96 432.80 1,236,528.46<br />
04/07/00 10:30 7245 550<br />
6900<br />
589<br />
2185<br />
2.92 571.84 1,241,049.31<br />
04/12/00 7:30 7362 1459<br />
6700<br />
627<br />
1978<br />
7.76 1373.66 1,245,791.47<br />
04/18/00 IO:00 7508 2246<br />
7043<br />
593<br />
11.94 2354.21 1,257.130.41<br />
04128/00 7:30 7745 1205<br />
611<br />
2097<br />
6.41 1202.75 1,274,692.89<br />
05/04/00 IO:00 7820 25<br />
571<br />
1541<br />
0.13 18.34 1.276,600.85<br />
05/11/00 9:oo 7988 1025<br />
592<br />
2458<br />
5.45 1199.04 1,280,861.69<br />
05/15/00 8:00 8106 674.4<br />
7800<br />
583<br />
2897<br />
3.59 929.78 1,286,095.04<br />
05/23/00 8:30 8274 1469<br />
7700<br />
611<br />
2626<br />
7.81 1835.70 1,295.774.22<br />
05/31/00 8:15 8466 4168<br />
7600<br />
596<br />
2696<br />
22.16 5347.86 1,324,508.46<br />
06/05/00 lo:30 8589 4062<br />
8300<br />
600<br />
2967<br />
21.60 5736.08 1,352,911.06<br />
06/14/00 9:13 8782 433<br />
8300<br />
604<br />
2.30 607.40 1,378,417.15<br />
06/23/00 15:37 9004 495<br />
9600<br />
599<br />
3437<br />
2.63 809.84 1.384,971.90<br />
06/27/00 12:47 9097 1910<br />
7800<br />
601<br />
2784<br />
10.16 2530.47 1,391,443.75<br />
07/03/00 II:16 9165 1000<br />
8100<br />
595<br />
2836<br />
5.32 1349.89 1,396,940.93<br />
07/12/00 13:53 9381 5701<br />
8100<br />
598<br />
2905<br />
30.32 7882.85 1,438,488.27<br />
07/21/00 12:03 9586 2023<br />
8000<br />
613<br />
10.76 2849.45 1,484,324.15<br />
07/26/00 II:16 9660 1292<br />
7800<br />
576<br />
3320<br />
6.87 2041.74 1,491,864.73<br />
08/10/00 12:24 9946 1282<br />
594<br />
4375<br />
8.82 2669.76 1,519,937.39<br />
08/16/00 9:15 10087 1263<br />
589<br />
2465<br />
6.72 1481.67 1.532,132.21<br />
08/22/00 lo:23 10121 1371<br />
588<br />
7.29 2120.94 1,534,684.06<br />
08/28/W IO:29 10265 1006<br />
590<br />
3239<br />
5.35 1551.01 1,545.699.93<br />
09/07/00 7:45 10446 992<br />
577<br />
5.28 1533.81 1,557,332.28<br />
OS/l 1100 1 I:32 10545 842<br />
586<br />
4.48 1380.98 1,563,344.05<br />
09/21/00 8:09 10716 847<br />
588<br />
4.50 1371.02 1,573,148.06<br />
09/28/OOj 10:36j 088i 1443 10700 571 31&J 7.67 2602.24 1,581,591.25<br />
FID estimatc<br />
FID estimate<br />
Hpff-se Updated: 1 l/10/00 Page 2 of 3
Cumulative Mass of Vol, Hydrocarbons Discharged<br />
Air Sparg I Soil Vi Extraction System<br />
MCB Camp Lejeune - Hadnot Point Fuel Farm, South East<br />
SVE Stack<br />
Extra<strong>pol</strong>ated<br />
Dati<br />
Notes:<br />
C = (PPM~) x K x (M&J / 1000<br />
C: vapor concentration (mgll)<br />
PPM- FID reading (PPM)<br />
K: number of carbon atoms in calibration gas<br />
(1 in methane)<br />
TH: total hydrocarbons calculated as gasoline<br />
(GRO)<br />
percent water vapor by volume 0.003<br />
SVE Stack pipe diameter 8<br />
Q = (1-B) x V x A x (P/P,)<br />
Q: vapor flowate (SCFM)<br />
x (T&-f)<br />
B: percent water vapor in Rowstream<br />
v: vapor velocity (ftlmin)<br />
A: cross-sectional area (sq. ft)<br />
P: absolute pressure of flowstream (” Hg)<br />
Pstd: standard pressure (29.92” Hg)<br />
T: absolute temperature of flowstream (degrees Rankine)<br />
Tm standard temperature (528 degrees Rankine)<br />
at 68 degrees F (from Peny’s handbook)<br />
* Estimated value due to malfunctionng instrument<br />
M=QxCx0.0895<br />
M: hydrocarbon recovery rate (lb/day)<br />
CM = [delta (blower meter hours)L.4]<br />
* [(Mprevious + Mcurrent)/Z] + CMprevious<br />
Assumptions:<br />
Mg = 126 mglmg-mote<br />
Kg = 24.07 dsm”3/10% gm -mole<br />
B = 0.003 from Per@ Chemical Handbook<br />
A = 0.3491 sq. ft<br />
Hpff-se Updated: 1 l/10/00 Page 3 of 3
A <br />
HPFF South East<br />
VOC Pounds Removed and Costs<br />
300,000<br />
_..<br />
$0.40<br />
250,000<br />
$0.35<br />
$0.30<br />
200,000<br />
$0.25<br />
4<br />
5 150,000<br />
:<br />
100,000<br />
$0.20<br />
$0.15<br />
$0.10<br />
50,000<br />
$0.05<br />
0<br />
I Nov-99 Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 J&O0 Aug-00 Sep-00 Ott-00<br />
Past 12 Months<br />
- VOC Pounds Removed t Cost! Pound Removed -Average -Average<br />
$0.00<br />
Task Order 14 - Project 920794 Camp Lejeune MCB, NC October 31,200O
HPFF South East<br />
Cumulative Pounds Removed<br />
600,000<br />
400,000<br />
200,000<br />
0,<br />
Nov-99 Dee99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00<br />
Past 12 Months<br />
-Cumulative<br />
Pounds Removed<br />
Task Order 14 - Project 920764 Camp Lejeune MCB. NC October 31. <strong>2000</strong>
cfive Log<br />
Hadnot Point Fiel Farm/Building 1115<br />
Task Order: 14<br />
Project Number: 920764<br />
1 1 1 SG 1116/98 ll/%l98 A N/A Free Product Investigation 3 N 1 $5,000 1<br />
2 SG 1219198 1219198 A N/A Concrete Slab Building 1111 3 IV 1 .-$O,UUII<br />
3 SC, -- 17/9/98 .- .-.-- 12/9ws .-- -.-- A N/A T&D of Free Product Produced During AFVR Events. 90 N 1 $2,5OC<br />
t<br />
-- -_-<br />
4 SG 5/19/99 5/19/99 i N/A IAbandon Well 11-15-16 1 10 1 N 1 12,500<br />
TDI SG 717199 7l7i99 A N/A Ilnvcxtinata .“.““..J’.” n&-w “““. rnmnlaintc ““...v*“....” RIlildinn ““..“...= 1101 . .-. I 30 I N 1 $5,000<br />
TD2 SG 12/16/99 N/A R 12/17/9Q install Trench alongside east wall of Building 1101 - will be awarded as a Modification 45 N $551000<br />
(-I'D)003 SG 114/00 N/A R N/A Apply acrylic caulking to cracks in floor of Building 1101 7 N $2,500<br />
7 hl a232 nnn<br />
(TD)004 SG 115100 IWO0 A l/5/00 Install 3 new monitoring wells at we-’ SI ena --’ or -< cwatng ---“_l’-- *rnr I IV I<br />
~“,“YY<br />
(TD)005 SG 1112100 N/A R N/A Install trench around remainder of LU,,u,lly 2, #a&VI 11<br />
I Iv l-l1 a<br />
;0 ii TBoi -I<br />
(To)006 SG 6l2OlOO N/A R N/A Additional Fuel Line Investigation near Ash Street and Building I( 1115 I I .-<br />
!i N !%I _. o.ooc .,_-<br />
(TD)007 SG 6/20/00 N/A R N/A Investigate purchase of monitoring equipment for Building 1101 30 i $3,500)<br />
(-l-D)008 sx Cil3nlnn P N/A Additional fingerprinting and soil analyses 5 N $1,000<br />
WV “.““1””<br />
.--.<br />
I<br />
I<br />
(TD)OOQ SC, _- l nI75lOO -.-. 1 Q/26/00 1 A 1 NiA IAdd Bldo - .” 1068 ___ to ~~ dailv , samoling , list. Procure readings from suspect sampling points. 30 N $3,000<br />
VR-09 TD 9/2L.,- slnn , I Ql28Inn -.- -,-- I , A 1 , N/A ..~ ,---. /Cost reduction -..-._ for analvses , I of benzene from coconut charcoal tubes due to favorable pricing. 90 N ($6,345)<br />
(TD)OlO TD iommn I I nl23mn I A I N/A lfie-caulk ’ ioints in buik-tinnc 1 IX8 11 IVI am-i I 115 I 3 I N I $1.550 I<br />
_- -. --. - -<br />
.“‘~Y l”““, I I”” I..” . I .”<br />
.~~<br />
I ~~ ~~ J-<br />
I x-I I ii16100 I NIA I Procure a samele from soil stockpile alona drainage ditch and analyze for disposal criteria I 10 I N 1 $550 I<br />
”<br />
Chanae Type:<br />
TD - Technical Directive<br />
SG - Scope Growth<br />
SR - Scope Reduction<br />
Status:<br />
A - Approved<br />
P - Pending<br />
R - Rejected<br />
W-Withdrawn<br />
Page 1
LA<br />
IV RAC FIELD FORM<br />
Contract No, N62470-97-D-5000<br />
Task Order No. 0014<br />
Title/Location Additional Caulking<br />
Buildings 1068, 108 and 1115<br />
DISTRIBUTION:<br />
x<br />
- -- ROrCC<br />
-x<br />
x- RPM<br />
-- x COTR<br />
OTHER: E MD<br />
CONTRACTING OFFICEFUSPECIALIST (TD’S)<br />
FILE: 920764<br />
Form No. (TD) 090 Data: Oct. 23,ZOOO Respond ‘NLT: NA<br />
Initiated By: XX Navy 0 C0ntr6ct0r 0 Other<br />
X Technical Direction c1 RF1 0 Variance Request 0 Overtime Authorization<br />
Descrlptlon<br />
(Include location 8 attachments If necessary):<br />
Re-caulk joints in Buildings 1068,1108 and 1115 6s Per the &ached <strong>report</strong>.<br />
Drawing Ref:<br />
1 Sp6c.qRef.<br />
Explanation/Recommendation: _ -<br />
Work to be petformed using existing funding in the TO ’<br />
Fee Bearing<br />
xx Yes No<br />
Associated Cost: $1,550.00<br />
WBS Code6 Affsctod: 40500000<br />
New<br />
Existing xx<br />
Work to be pe!formed using existing funding within the<br />
task order.<br />
/r<br />
w Yes H No<br />
Schedule lmpoct (assume response by ‘NLT date)<br />
Norm<br />
0 Increase in Time<br />
ODecrease in Time<br />
Appro%imate Calendar Days: 3<br />
I<br />
Contractor:<br />
Date<br />
Site Representative: \ Fi<br />
met Managec James A. Dunn, Jr, Originator) !/ Oct. 23,ZODO<br />
\I V<br />
Reviewer Comments, In&l RFI Respon66:<br />
Task Order Modification to Follow (contract action) XX No Tesk Order Modification Required
LANTDIV RAC FIELD FORM<br />
l3l~UnON:
MONTHLY PROGRESS REPORT<br />
Contract N62470-97-D-5000<br />
Task Order 0033<br />
OHM Project 780790<br />
October 31,200O<br />
Operate and Maintain Three Treatment Plants<br />
And Four Air Sparge / SVE Systems<br />
MCB.Camp Lejeune, North Carolina<br />
Project Manager:<br />
6l-&i-<br />
James A. Dunn, Jr., P.E.<br />
Approved<br />
By:<br />
Roland Moreau, P.E.<br />
Program Manager<br />
Hard Copies Distributed<br />
COTR:<br />
Karen Wilson (757) 322-4817<br />
Wilsonke@efdlant.navfac.navy.mil<br />
RAC CM:<br />
Greg Hedley<br />
(757) 396-5121<br />
Hedlevas~efdlant.navfac.navy.mil ext* 383<br />
Project Controls Manager:<br />
Linda Barberousse (757) 363-7190<br />
Lbarberousse@theitgroup.com<br />
Contract Files<br />
Scheduled Web Site Posting Date:<br />
November 22,200O<br />
ROICC:<br />
RPM:<br />
to:<br />
Brent Rowse<br />
Kirk Stevens / Lori Ruether<br />
1.0 PROJECT DESCRIPTION<br />
This Monthly Progress Report has been prepared to summarize the activities performed from October 1,200O to<br />
October 31, <strong>2000</strong>, as well as a summary of the work planned for the month of November <strong>2000</strong> by OHM<br />
emediation Services Corp., (OHM), on Task Order 0033 of the Navy-LANTDIV RAC Contract N62470-97-<br />
j-5000. This Task Order was signed on March 10, 1999.<br />
The remediation effort consists of:<br />
1. Relocation of the field offices to the rear of Lot 203 and the purchase of offices, equipment and vehicles.<br />
2. Operation and maintenance of the Hadnot Point North and South Plants for a period of two years.<br />
3. Operation and maintenance of the Lot 203 Groundwater Treatment Plant for a period of two years.<br />
4. Operation and maintenance of the Air Sparging and SVE systems at TT-2477/78 and Berkley Manor 820<br />
for a period of two years and support in the NFA Requests for AS 822 and STT 69.<br />
5. FY 00 and FY 01 Site Management Plan and RAB Support.<br />
6. Administrative and field support services for a period of two years.<br />
7. Corrective actions as may be required during the course of two years of field operations.<br />
8. RCRA Closure of Buildings TP 452 and TP 463.<br />
The total current value of this task order including modifications is $3,039,712.00 exclusive of fee.<br />
2.0 WORK ACCOMPLISHED<br />
During the month of October <strong>2000</strong>, OHM has performed the following:<br />
1. Operated and maintained the Groundwater Treatment Plant at Lot 203 for the month experiencing 48<br />
hours of downtime due to changing the cartridge filters 8 times, pressure washing and cleaning the<br />
Polymax unit, backwashing the carbon cells, repairing the filter press feed pump, cleaning the mix tank<br />
and performing <strong>monthly</strong> maintenance items. Treated 12,046,100 gallons of groundwater and 425,000<br />
OHM Project 780790<br />
Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />
Page 1 of4<br />
October 3 1,200O
gallons of collected stormwater from Site 89 (see detailed operating <strong>report</strong> attached) [WBS 21000000 &<br />
21500000].<br />
2. Operated and maintained the Hadnot Point North Plant for the month experiencing 12 hours of<br />
downtime. Changed the filters 11 times and performed <strong>monthly</strong> maintenance on the plant. Treated a<br />
total of 199,299 gallons of groundwater and 16,620 gallons of produced fluids from AFVR events, SVE<br />
systems and Site 54 (see detailed operating <strong>report</strong> attached) [WBS <strong>2000</strong>0000 & 20500000].<br />
3. Operation and maintenance of the air sparging/SVE units at BM 820 and TT 2477/78 was conducted<br />
under this T.O. Blower unit at TT 2477 spun a shaft and the unit was repaired onsite. Total downtime<br />
was two weeks. (See detailed operating <strong>report</strong> attached.)[WBS Codes 9100000 and 91500000]<br />
4. Conducted background sampling of soils and potable water for closure of Buildings TP 452 and TP 463.<br />
[WBS Code 50000000]<br />
5. Continued preparation of the final design of the system expansion at TT 2477 to remediate the area of<br />
contamination associated with Building TT 2453. [WBS Code 91401000].<br />
3.0 WORK PLANNED<br />
During the month of November <strong>2000</strong>, OHM is scheduled to perform the following:<br />
1. Conduct normal operation and maintenance of the Lot 203 and North Plant systems and the operation<br />
and maintenance of the BM 820 and TT 2477/78 air sparge/SVE systems.<br />
2. Continue preparatory activities for the RCRA facility closures.<br />
3. Submit results of the activities conducted at TT 2477.<br />
PROBLEMS AND SOLUTIONS<br />
,A0<br />
luring the month no new problems arose and all previous issues have been satisfactorily resolved.<br />
5.0 COST SCHEDULE SUMMARY<br />
Cost Summarv<br />
The following<br />
attached.<br />
is a summary of the costs associated with this task order.<br />
A detailed performance <strong>report</strong> is<br />
T.O. ceiling amount (without fee)<br />
Approximate cost through October <strong>2000</strong><br />
Approximate cost for October <strong>2000</strong><br />
Remaining funds<br />
Estimated cost to complete<br />
Current estimated cost at completion<br />
Prior period estimate at complete<br />
Physical % complete<br />
Financial % complete<br />
3,039,712.00<br />
1,528,255.00<br />
115,468.OO<br />
1,511,457.00<br />
1,508,161.00<br />
3,036,416.00<br />
3,037,171.00<br />
55.5<br />
50.3<br />
We expect that the project will be completed within budget.<br />
hedule Summarv<br />
Original contract completion date<br />
Current contract completion date<br />
06/30/00<br />
09/30/01<br />
OHM Project 780790<br />
Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />
Page 2 of4<br />
October 3 1,200O
Prior period 0 & M completion date<br />
Current period 0 & M completion date<br />
:F-<br />
0.0 NON-COMPLIANCE CHECK OFF LIST<br />
No non-compliance issues have been associated with this task order.<br />
09/30/01<br />
09/30/01<br />
7.0 WASTE MATERIALS TRACKING<br />
No waste materials were generated during the month.<br />
8.0 GOVERNMENT MATERIALS TRACKING<br />
All government owned materials (trucks, offices and equipment) have been properly documented and are being<br />
tracked.<br />
9.0 MODIFICATION LOG<br />
2<br />
3<br />
4<br />
5<br />
6<br />
Description<br />
O&M at Treatment<br />
System and provide<br />
Quarterly Reports of<br />
Status for 29 weeks past<br />
current expiration<br />
Provide continued O&M<br />
for an additional 23 weeks<br />
and relocate to rear of lot<br />
203.<br />
O&M Extension through<br />
09/3 o/o0<br />
Delete all cost associated<br />
with installing new<br />
telephone cable along<br />
Piney Green Rd.<br />
Demolish Building TP-<br />
45 1 and TP-463<br />
Continue O&M Activities<br />
for additional 12 months<br />
Install 750’ of fence to<br />
separate the front from the<br />
rear of Lot 203<br />
Award Contract<br />
Date End Date Cost Value Award Fee<br />
03/10/99 1 O/20/99 $568,061 .OO $25,454.00<br />
05/l 3199 N/A $0.00 $0.00<br />
Total Mod<br />
Value<br />
$593,515.00<br />
$0.00<br />
06/03/99 06/30/00 $973,545.00 $45,291 .OO $1,018,836.33<br />
09/03/99 06/30/00 -$25,121 .OO -$979.00 -$26,100.00<br />
02/l 2/00 06/30/00 $191,582.00<br />
06/ 16/00 04/30/o 1 $1,322,055.00<br />
06/ .6/00<br />
$9,590.00<br />
-<br />
$7,667.00<br />
-<br />
$64,692.00<br />
-<br />
$311.00<br />
-<br />
$199,249.00<br />
$1,386,747.00<br />
$9,901 .oo<br />
L<br />
10.0 WORK DIRECTIVE LOG<br />
he current work directive log is attached.<br />
Totals<br />
$3.039.712.00 $142,436.00 $3,182,148.33<br />
OHM Project 780790<br />
Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />
Page 3 of 4<br />
October 3 1,200O
11.0 ATTACHMENTS<br />
F”*.<br />
i<br />
‘erformance Report (1 page)<br />
Performance Curve (1 page)<br />
Schedule (1 page)<br />
Work Directive Log (1 page)<br />
Work Directive (TD)OOS (1 page)<br />
Treatment Plant Reports<br />
-Lot 203 (4 pages)<br />
-Site 78 (4 pages)<br />
POL Operating Reports<br />
-TT2477/78 (6 pages)<br />
-BM 820 (5 pages)<br />
OHM Project 780790<br />
Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />
Page 4 of 4<br />
October 3 1,200O
IT COtpOratiOn<br />
START DATE 01 MA<br />
FIN DATE 30APROl’<br />
performance<br />
Report<br />
WBS<br />
Code<br />
LbSCriptiOfl<br />
orig.<br />
Budg<br />
anty<br />
Qnt Curre Task lnst<br />
RW Qnty unit anty<br />
Task orig.<br />
% Budg<br />
Comp f<br />
5 current Earned Actual ETC Forecast Variance variance % Physl<br />
RW.l s J CPI Al from from Of %<br />
Adjust ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />
00000000<br />
TO Award<br />
1w<br />
0<br />
la, 56<br />
100<br />
loo<br />
1oowwo<br />
M6 Site Management<br />
Plan<br />
loo<br />
0<br />
loo %<br />
30<br />
20<br />
12390 0 12390 3717 3314 0.89 8048 11362 1028 -1026 0.4 a1<br />
15000000<br />
M6 Systems<br />
Optimization<br />
loo<br />
0<br />
IW %<br />
0<br />
0<br />
45237 0 45237 0 0 0.00 46237 45237 0 0 1.5 0.c<br />
<strong>2000</strong>0000<br />
M6 Operation<br />
of N 8 S<br />
10<br />
0<br />
103 %<br />
53<br />
63<br />
113668 0 113668 71611 29718 0.41 58112 87830 -25830 -25838 3.7 2.4<br />
20500000<br />
M6 Maintenance<br />
of N&S<br />
1CU<br />
0<br />
IW %<br />
63<br />
63<br />
990% 0 99886 62928 49960 0.79 50185 100146 259 259 3.3 2.1<br />
21000000<br />
M6 Operation<br />
of GWTP<br />
1Gl<br />
0<br />
1w 56<br />
63<br />
63<br />
192809 0 I 92809 121470 69287 0.57 109257 178545 -14264 -14264 6.3 4.c<br />
21500000<br />
M6 Maintenance<br />
of GWTP<br />
100<br />
0<br />
loo %<br />
ii3<br />
63<br />
172006 0 172006 108364 84633 0.78 91118 175751 3745 3745 5.7 3.8<br />
22500000<br />
M6 Monthly Sampling 9 Anaiys<br />
la,<br />
0<br />
100 36<br />
33<br />
33<br />
235276 0 235276 77641 76618 0.99 150647 227265 4KJ11 8011 7.7 2.6<br />
31500000<br />
O&M Bill Lot 203<br />
100<br />
0<br />
loo %<br />
0<br />
IW<br />
41105 0 41105 41105 0 0.00 46 46 -41059 -41059 1.4 0.c<br />
33000000<br />
Bio-Cell Batch Load Lot 203<br />
lea<br />
0<br />
loo %<br />
0<br />
IW<br />
2700 0 2700 2700 0 0.00 0 0 -27W -2700 0.1 0.C<br />
50000000<br />
M4 Demolish<br />
Bldgs TP4528463<br />
IW<br />
0<br />
loo %<br />
IO<br />
IO<br />
191582 0 191582 19156 19768 1.03 172070 191838 256 256 6.3 0.E<br />
66666666<br />
<strong>2000</strong> Restructuring Costs<br />
0<br />
0<br />
0<br />
0<br />
0<br />
0 0 0 0 14623 0.00 -16416 -1793 -1793 -1793 0.0 OS<br />
70000000<br />
Move to Back of Lot 203<br />
loo<br />
0<br />
1w %<br />
IW<br />
loo<br />
78302 0 78362 78302 147484 1.68 0 147484 69182 69182 2.6 2.8<br />
70600100<br />
M7 Fence Install -Lot 203<br />
100<br />
0<br />
100 %<br />
100<br />
IW<br />
9566 0 9566 95% 5953 0.62 0 5953 -3613 -3613 0.3 0.:<br />
8WOOWO<br />
M6 Administration<br />
8 Support<br />
100<br />
0<br />
loo %<br />
6.3<br />
63<br />
1228756 0 1228756 774116 771305 1.00 497946 1269251 40495 40495 40.4 25.5<br />
9ocmooo<br />
Fuel<br />
loo<br />
0<br />
loo 56<br />
63<br />
63<br />
21703 0 21703 13673 15151 1.11 7736 22887 1184 1184 0.7 0.4<br />
91wo000<br />
M6 ASlSVE Maintenance 820/24<br />
loo<br />
0<br />
IW %<br />
63<br />
63<br />
137197 0 137197 86434 48948 0.57 85403 134431 -2766 -2766 4.5 2.8<br />
91400000<br />
Btdg 2455 System<br />
lnvestttati<br />
100<br />
0<br />
IW %<br />
IW<br />
100<br />
0 0 0 0 22829 0.00 0 22829 22829 22829 a0 0.C<br />
91401000<br />
M6 2455-Plume<br />
Delineation<br />
loo<br />
0<br />
loo %<br />
95<br />
95<br />
37692 0 37692 35807 49719 1.39 2164 51883 14191 14191 1.2 1.2<br />
91405000<br />
M6 Install AS/SVE at 2455<br />
loo<br />
0<br />
loo 56<br />
0<br />
0<br />
47910 0 47910 0 0 0.00 6owo GMXX) 12090 12090 1.6 0.c<br />
91500000<br />
M6 Operation<br />
of BM 82012477T<br />
1w<br />
0<br />
100 %<br />
63<br />
63<br />
237257 0 237257 149472 40659 0.27 130887 171547 -65710 -65710 7.8 4.:<br />
9<strong>2000</strong>000<br />
Well InstallationIAbandmt<br />
IW<br />
0<br />
1w 56<br />
17<br />
17<br />
45873 0 45873 7798 6942 0.89 36742 37684 -8189 -8189 1.5 0.2<br />
92500000<br />
M6 Equipment Truck, B&hoe<br />
100<br />
0<br />
la, %<br />
63<br />
63<br />
49753 0 49753 31344 28029 0.89 22550 50576 825 825 1.6 1.c<br />
98016000<br />
M6 Par Diem/Lodging<br />
IW<br />
0<br />
IW %<br />
95<br />
95<br />
39045 0 39645 37093 43315 1.17 2349 45&&l 6619 6619 1.3 I.2<br />
I 99999999<br />
TO Complete<br />
103<br />
0<br />
IW %<br />
0<br />
0<br />
3039712 0 3039712 1732299 1528255 0.88 1599161 3036416 a98 -3295 100.0 55.!<br />
3039712 0 3939712 1732299 1526255 0.99 1566161 3039416 3299 -3296 100.0 55.f
Task Order 33 Cost Performance Curve<br />
3500<br />
3000<br />
Time Now 11/3/00 -+<br />
2500<br />
<strong>2000</strong><br />
1500<br />
1000<br />
500<br />
0<br />
Physical % Complete = 55.5<br />
Financial % Complete = 50.3<br />
Jul-00 Aug-00 Sep-00 Nov-00 Dee-00 Jan-01 Feb-01 Mar-01 Apr-01<br />
Time in Months<br />
I +RevBaseline - - - Actual --Ir #Earned -- Forecast 1<br />
I
dive Log<br />
Continued O&b - One Year<br />
Task Order: 33<br />
Project Number: 780790<br />
Costs are a Rough Order of Magnitude (ROM). It is not actual cost, nor is it a final change request value.<br />
, 11/10/00<br />
3 impacts<br />
WDI TD 4128199 4128199 A N/A Relocate Offices 180 N $100,000<br />
(WD)OOl SG 7127199 7127199 A N/A Plug &Abandon Wells 360 N $5,000<br />
(TD)OOl SG 8/I 7199 8117199 A N/A Increase Size of Waterline 15 N $8,000<br />
(TD)004 SG 1 on199 10/20/99 A N/A Fencing Repairs 30 N $23,000<br />
(TD)005 TD 1 Ill o/99 II/10199 A N/A Procure groundwater samples from all monitoring wells and adjacent to remedial system. 30 N $12,000<br />
(TD)006 TD 1 Ill 0199 ll/lOl99 A N/A Procure groundwater samples from all monitoring wells and adjacent to remedial system. 30 N $1,500<br />
(TD)007 TD 11/10/99 II/IO/99 A N/A Remove debris (concertina wire and shingles)and install signs. 30 N $12,700<br />
(TD)008 TD 1 O/l 9100 10/20/00 A N/A ‘rovide drums for NFESC subcontractor at Site 88 (Building 25) and analyze contents for dispos; 60 N $8,000<br />
Chanae Tvpe:<br />
TD - Technical Directive<br />
SG - Scope Growth<br />
SR - Scope Reduction<br />
Status<br />
A-Approved<br />
P - Pending<br />
R - Rejected<br />
W-Withdrawn<br />
Page1
Site 2477 Updated: 1 l/10/00 Page 1 of 4<br />
OUTPUT TABLE Cumulative hIa& olatile Hydrocarbons Discharged<br />
Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />
MCB CAMP LEJEUNE -l-r-2477/78<br />
IO/IO/97 II:32<br />
IO/IO/97 1422<br />
10/10197 17:oo<br />
10114i97 14:22<br />
10/14/97 17:oo<br />
10/15/97 8:30<br />
10/15/97 12:lO<br />
10/15/97 13:oo<br />
10/15/97 14:30<br />
10/16/97 11:15<br />
10/18/97 8:49<br />
10/18/97 13:30<br />
10/18/97 15:20<br />
10/20/97 9:45<br />
10/21/97 14:20<br />
10/22/97 7:30<br />
10/23/97 I 11:20 I<br />
lOi 8:43<br />
11/04/97 8:26<br />
11/05/97 12:oo<br />
11/07/97 1345<br />
11/10/97 9:oo<br />
11/10/97 15:30<br />
11/12/97 IO:20<br />
11119197 9:oo<br />
11119/97 9:oo<br />
12/09/97 10:41<br />
12/19/97 10:22<br />
01/07/98 8:30<br />
01/07/98 12:30<br />
01112/98 IO:20<br />
01112lS8 II:00<br />
01/21/98 12:25<br />
02/04/98 12~40<br />
02/13/98 14:30<br />
02/23/98 Ii:30<br />
03/13/98 II:30<br />
03/17/98 1:30<br />
03/25/98 12:50<br />
04/07/98 14:30<br />
04/15/98 13:30<br />
04/24/98 13:OO<br />
06/30/98 8:30<br />
06/30/98 12:30<br />
07/10/98 12:OO<br />
07/10/98 I%30<br />
07/17/98 9:30<br />
07/17/98 13:OO<br />
07/21/98 1O:W<br />
07/21/98 13:OO<br />
08/05/98 IO:30<br />
08/05/98 13:30<br />
08/12/98 1O:W<br />
08/12/98 13:30<br />
08/22/98 9:w<br />
08/22/98 12:30<br />
i 10<br />
10 58<br />
13 30<br />
15 58<br />
18 30<br />
33 85<br />
34 40<br />
35 40<br />
36 135<br />
39 44<br />
53 30<br />
58 37<br />
60 46<br />
91 40<br />
102 40<br />
119 60<br />
143<br />
236 962<br />
401 121<br />
429 561<br />
453 151<br />
525 388<br />
526 232<br />
568 408<br />
166<br />
1%<br />
577 168<br />
739 131<br />
929 55<br />
933 123<br />
1051 15<br />
1052 3<br />
1268 16<br />
1521 17<br />
1715 12<br />
1649 76<br />
2165 18<br />
2262 26<br />
2333 1271<br />
2764 571<br />
2959 70<br />
3170 120<br />
4424 54<br />
4428 38<br />
4669 52<br />
4671 57<br />
4840 52<br />
4843 55<br />
4933 51<br />
4936 50<br />
5200 15<br />
5203 12<br />
5365 41<br />
5366 37<br />
5604 14<br />
5607 37<br />
4500<br />
4500<br />
4500<br />
4500<br />
4500<br />
4500<br />
4000<br />
4000<br />
4000<br />
5000<br />
4000<br />
3900<br />
4000<br />
5000<br />
5000<br />
45W<br />
4900<br />
4800<br />
4500<br />
4800<br />
5000<br />
5000<br />
4700<br />
4200<br />
3600<br />
65W<br />
4600<br />
5000<br />
4300<br />
4600<br />
6400<br />
7000<br />
7100<br />
7000<br />
7100<br />
6900<br />
7800<br />
7100<br />
7100<br />
7000<br />
7900<br />
7700<br />
79M)<br />
7600<br />
7900<br />
7800<br />
79w<br />
8000<br />
7500<br />
7lW<br />
7500<br />
7100<br />
7400<br />
6300<br />
552<br />
560<br />
560<br />
560<br />
560<br />
547<br />
546<br />
546<br />
542<br />
535<br />
540<br />
548<br />
548<br />
542<br />
553<br />
527<br />
527<br />
527<br />
527<br />
545<br />
545<br />
531<br />
532<br />
530<br />
519<br />
519<br />
513<br />
526<br />
540<br />
547<br />
523<br />
531<br />
521<br />
517<br />
528<br />
539<br />
525<br />
520<br />
538<br />
553<br />
552<br />
542<br />
544<br />
556<br />
565<br />
565<br />
545<br />
558<br />
551<br />
557<br />
551<br />
554<br />
558<br />
567<br />
643 0.053<br />
831 0.308<br />
831 0.160<br />
831 0.308<br />
831 0.160<br />
850 0.346<br />
757 0.213<br />
757 0.213<br />
763 0.718<br />
966 0.238<br />
765 0.158<br />
738 0.197<br />
754 0.244<br />
954 0.213<br />
934 0.213<br />
883 0.319<br />
962<br />
942 5.114<br />
883 0.642<br />
910 3.090<br />
948 0.802<br />
974 1.956<br />
914 1.231<br />
818 2.170<br />
728 0.999<br />
1277 0.696<br />
880 0.295<br />
945 0.655<br />
850 0.078<br />
895 0.017<br />
1270 0.085<br />
1399 0.093<br />
1390 0.062<br />
1342 0.414<br />
1398 0.094<br />
1372 0.139<br />
1499 6.759<br />
1327 3.036<br />
1329 0.372<br />
1335 0.638<br />
1501 0.287<br />
1431 0.202<br />
1445 0.277<br />
1388 0.303<br />
1498 0.277<br />
1445 0.292<br />
1482 0.271<br />
1485 0.266<br />
1407 0.080<br />
1325 0.064<br />
1389 0.218<br />
1294 0.197<br />
551 1388 0.074<br />
565 IlW ".1YI<br />
4.0<br />
22.9<br />
11.9<br />
22.9<br />
11.9<br />
26.3<br />
14.4<br />
14.4<br />
49.0<br />
20.4<br />
10.8<br />
13.0<br />
16.5<br />
18.2<br />
17.8<br />
25.2<br />
431.2<br />
50.8<br />
251.7<br />
68.1<br />
170.5<br />
100.7<br />
158.9<br />
64.9<br />
79.5<br />
23.2<br />
55.4<br />
5.9<br />
1.4<br />
9.6<br />
11.6<br />
7.7<br />
49.7<br />
11.7<br />
17.0<br />
906.5<br />
360.6<br />
44.3<br />
76.2<br />
38.6<br />
25.9<br />
35.8<br />
37.7<br />
37.1<br />
37.8<br />
35.0<br />
35.3<br />
10.0<br />
7.6<br />
27.1<br />
22.6<br />
9.2<br />
ZO.3<br />
SVE Field<br />
1.6 SVE Field<br />
3.5 SVE Field<br />
4.9 SVE Field<br />
6.8 SVE Field<br />
19.1 SVE Field<br />
20.0 SVE Field<br />
20.5 SVE Field<br />
22.5 SVE Field<br />
26.3 SVE Field<br />
35.4 SVE Field<br />
37.7 SVE Field<br />
38.9 SVE Field<br />
61.6 SK/AS Fields 18<br />
69.7 SVVAS Field<br />
85.1 SVE!AS Field<br />
97.7 SK/AS Field<br />
936.5 SVEIAS Field<br />
2589.2 SVE Field<br />
2762.8 SVE Field<br />
2925.8 notrecordc<br />
3283.7 SVUAS Field<br />
3289.4 SVEIAS Field<br />
3516.6 SK/AS Field<br />
2185.5 SVEIAS Field<br />
2185.5 SK/AS Field<br />
2741.1 4 additional SVOAS wells on. SVElAS Field<br />
3228.4 SVOAS Field<br />
3634.9 SVEIAS Field<br />
3641.5 SVEIAS Field<br />
3792.1<br />
3792.2<br />
3841.6<br />
3953.3<br />
4031.2<br />
4191.4<br />
4595.7<br />
4653.8<br />
6019.8<br />
17397.9<br />
19043.0<br />
19572.8<br />
22572.5<br />
22577.9<br />
22887.4<br />
22890.5<br />
23153.6<br />
23158.3<br />
23296.7<br />
23301.1<br />
23550.7<br />
23551.8<br />
23668.8<br />
23671.9<br />
23829.5<br />
Field 1<br />
Field 1<br />
Field #<br />
Field I<br />
Field #<br />
Field #<br />
Field I
Site 2477 Updated: 11110100 Page 2 of 4<br />
OUTPUT TABLE Cumulative Ma.. olatile Hydrocarbons Discharged<br />
AirSparging(AS)/SoilVaporExtraction<br />
(SVE).System<br />
MCBCAMPLEJEUNE-l-r-2477178<br />
SVE Stack<br />
__._ -.__<br />
09/02/981 lid<br />
09/l 3196 8:45<br />
09/13/96 12:10<br />
09/19/98 9:35<br />
09/19/08 13:30<br />
0912398 11:45<br />
09/25/98 15105<br />
09/30/96 9:30<br />
09/30/98 13:OO<br />
10/09/96 9:25<br />
IO/IO/98 8153<br />
10/15/98 lo:15<br />
10115198 14:12<br />
10/20/98 1 I:45<br />
10120196 1435<br />
10/26/98 9:10<br />
10/28/98 13:30<br />
11/13/98 12:OO<br />
11/13/98 15:lO<br />
11/18/Q8 13:50<br />
II/W98 I 15:30 I<br />
12/10/98 11:35<br />
12/10/98 14:00<br />
12/14/98 0:25<br />
12/14/98 11:55<br />
12/21/98 IO:20<br />
12l22l98 0:50<br />
01/06/99 a:50<br />
01/w/99 1205<br />
01/15/0@ 1245<br />
01/19/09 15:45<br />
01/20/99 9:w<br />
01/20/99 IO:55<br />
01/25/o@ 12:10<br />
01/25/O@ 14:25<br />
02/25/o@ IO:00<br />
03/03/09 1230<br />
03/06/99 9:oo<br />
03/12/90 7:30<br />
03/25/99 6:42<br />
04/13/00 1O:W<br />
04/21/09 12:w<br />
05/01/99 6:W<br />
05/05/99 s:30<br />
05/14/09 7:15<br />
05/18/99 1O:W<br />
05/27/99 11:OO<br />
08/04/00 11:oo<br />
5672<br />
5676<br />
5817<br />
5821<br />
5953<br />
5968<br />
0061<br />
6064<br />
6297<br />
6320<br />
6441<br />
6445<br />
6562<br />
6505<br />
6753<br />
6757<br />
6881<br />
6907<br />
6973<br />
6975<br />
7094<br />
7096<br />
7449<br />
7451<br />
7620<br />
7622<br />
7713<br />
7716<br />
7882<br />
7905<br />
8255<br />
8267<br />
8477<br />
8576<br />
8593<br />
8595<br />
8717<br />
8719<br />
6943<br />
0036<br />
9153<br />
9387<br />
9541<br />
9664<br />
9876<br />
9003<br />
10188<br />
10403<br />
10522<br />
10737<br />
10834<br />
11007<br />
11202<br />
ii<br />
32<br />
33<br />
25<br />
6<br />
23<br />
3<br />
33<br />
9<br />
19<br />
29<br />
26<br />
29<br />
27<br />
26<br />
12<br />
12<br />
24<br />
24<br />
23<br />
38<br />
20<br />
15<br />
0<br />
38<br />
26<br />
43<br />
125<br />
16<br />
26<br />
21<br />
3<br />
12<br />
12<br />
IO<br />
6<br />
3<br />
5<br />
2<br />
7<br />
5<br />
9<br />
10<br />
6<br />
.._<br />
7500<br />
7300<br />
6600<br />
2lW<br />
7000<br />
6300<br />
6000<br />
65W<br />
2900<br />
6100<br />
6000<br />
4900<br />
6000<br />
6100<br />
6100<br />
6000<br />
65W<br />
5100<br />
5600<br />
5600<br />
5000<br />
6700<br />
67W<br />
6400<br />
6700<br />
6400<br />
6500<br />
6000<br />
6600<br />
6100<br />
6900<br />
5700<br />
5400<br />
5400<br />
5900<br />
5700<br />
6100<br />
5800<br />
5700<br />
5900<br />
40#0<br />
57w<br />
5880<br />
5800<br />
5700<br />
64W<br />
5700<br />
6000<br />
5600<br />
5700<br />
5600<br />
5700<br />
6000<br />
556<br />
548<br />
561<br />
550<br />
555<br />
556<br />
561<br />
553<br />
556<br />
540<br />
537<br />
540<br />
555<br />
544<br />
544<br />
536<br />
552<br />
533<br />
526<br />
526<br />
528<br />
543<br />
541<br />
533<br />
541<br />
531<br />
535<br />
521<br />
529<br />
533<br />
642<br />
514<br />
513<br />
534<br />
540<br />
525<br />
538<br />
536<br />
539<br />
530<br />
558<br />
523<br />
531<br />
531<br />
542<br />
549<br />
535<br />
546<br />
531<br />
548<br />
460<br />
548<br />
558<br />
567<br />
460<br />
06/l l/991 9:30 11307<br />
W/19/991 12:30 11503 4 5400 557<br />
1394 0.175<br />
1377 0.170<br />
1253 0.175<br />
305 0.133<br />
1304 0.032<br />
1171 0.122<br />
1105 0.016<br />
1215<br />
530<br />
1168 0.175<br />
1155<br />
936<br />
1117<br />
1150<br />
1150<br />
1157 0.048<br />
1217 0.101<br />
969 0.152<br />
1096 0.138<br />
1100 0.154<br />
1155<br />
1275<br />
1280<br />
1241 0.141<br />
1260 0.138<br />
1246 0.061<br />
1256 0.W-l<br />
1190 0.128<br />
1329 0.128<br />
1163 0.122<br />
1316 0.202<br />
1146 0.106<br />
10.96 o.oao<br />
1045 0.040<br />
1129 0.202<br />
1122 0.138<br />
1172 0.226<br />
1118 0.665<br />
1093 0.082<br />
1151 0.136<br />
744 0.112<br />
1127 0.016<br />
1145 o.oe4<br />
1129 0.064<br />
1087 0.053<br />
1205 0.032<br />
1101 0.016<br />
1136 0.027<br />
1000 0.011<br />
1075 0.037<br />
1056 0.027<br />
1056 0.046<br />
1094 0.053<br />
0.032<br />
1wz “.“21<br />
21.9<br />
21.0<br />
10.7<br />
4.7<br />
3.7<br />
12.8<br />
1.6<br />
18.3<br />
5.0<br />
11.0<br />
13.4<br />
13.6<br />
15.2<br />
15.7<br />
15.8<br />
6.0<br />
7.2<br />
13.6<br />
15.2<br />
12.0<br />
23.8<br />
10.9<br />
7.8<br />
4.5<br />
20.4<br />
13.6<br />
23.7<br />
66.5<br />
8.1<br />
14.2<br />
7.4<br />
1.6<br />
6.5<br />
6.4<br />
5.2<br />
3.4<br />
1.6<br />
2.7<br />
1.0<br />
3.6<br />
2.5<br />
4.5<br />
5.2<br />
1.9<br />
23890.1 Field I<br />
23893.5 Field I<br />
23865.1 Field I<br />
23965.8 Field I<br />
24014.7 Field I<br />
24015.6 FieldI<br />
24019.4 Field#l, zero ppm asmethanedaiarecordc<br />
24019.4 Field% zero ppm as methanedata reuordt<br />
24100.6 Field 1<br />
24109.6 Field#2, no ppm as methane data giw<br />
24109.6 I Field#l,zero ppm asmethanedatarecordc<br />
24109.6 Field #2. zero ppm BS methanedate records<br />
24109.6 Field #l. zero mxn as methane data record<<br />
24109.6 Fiald#2, zero bpm asmethanedataremrdt<br />
24120.0<br />
24130.3<br />
24193.4<br />
24208.0<br />
24247.6<br />
24248.2<br />
24248.2<br />
24248.2<br />
24363.3<br />
24364.6<br />
24444.4<br />
24445.0<br />
24484.4<br />
24486.2<br />
24583.4<br />
24x01.0<br />
24854.1<br />
24858.8<br />
24912.4<br />
24963.7<br />
24975.8<br />
24977.4<br />
25206.7<br />
Field 1<br />
Field I<br />
Field I<br />
Field I<br />
Field I<br />
FieldI<br />
Field#<br />
Field 1<br />
Field1<br />
Field I<br />
Field+<br />
Field I<br />
Field1<br />
FieldI<br />
F&d I<br />
Field #<br />
Field I<br />
Field #<br />
Field 1<br />
Field d<br />
Field d<br />
Field1<br />
25209.6<br />
8loweroutfor repr<br />
25313.9 Blower Rep&d. Fields operating tczgeth<br />
25355.9<br />
25377.9<br />
25414.3<br />
25461.3<br />
25405.9<br />
25530.4<br />
25542.6<br />
25560.0<br />
25576.7<br />
25566.2<br />
25604.2 sampling duetoA/S fabrication & replaceme,<br />
25609.3<br />
25634.7<br />
25674.2<br />
25685.6 stack velocity or temperature field data give<br />
20603.4
OUTPUT TABLE Cumulative Ma’s &tile Hydrocarbons Discharged<br />
Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />
MCB CAMP LEJEUNE - -l-r-2477/78<br />
.<br />
07/05/00 14:oo 11665<br />
07108/00 13:oo 11060<br />
07/16/90 6:45 12151<br />
07/20/00 10:20 12243<br />
07/26/00 8:05 12385<br />
00103/80 6:20 12660<br />
08109199 IO:00 12705<br />
08/20/99 IO:18 12966<br />
08/23/09 lo:35 13037<br />
08/31/00 1150 13190<br />
10/28/90 920 14062<br />
11/05/09 11:oi 14088<br />
11/16/99 13:35 14134<br />
11/23/90 a:40 14292<br />
12/03/90 940 14460<br />
12/10/00 a:40 14460<br />
12/17/99 a:40 14460<br />
12/31199 9:40 14460<br />
01/09/W 8:49 14872<br />
01/28/W IO:18 15254<br />
02/03/w a:05 15353<br />
02/10/00 14:03 15526<br />
02/17/w 12:ll 15602<br />
02/27/w 12:oo 15032<br />
03102/w 14:w 16031<br />
03/06/00 13:oo 16173<br />
03/17/00 ii:20 16387<br />
03/24/w 10:22 16544<br />
03/26/W 030 16613<br />
04/06/00 1o:w 16853<br />
04/27/w 13:30 17321<br />
05/01/00 II:30 17405<br />
05/11/w 12:w 17621<br />
05/15/w 11:30 17666<br />
05/27/00 1O:W 17882<br />
@3/07/00 14:w 18142<br />
06/16/00 17:W 18361<br />
@6/20/W 12:16 18452<br />
06/20/00 11:57 18633<br />
07/05/00 12:25 18777<br />
07/14/00 16:45 18993<br />
07/17/W 13:21 19062<br />
07/28/00 15:lO 10306<br />
06/03/W a:47 10398<br />
08/l l/W 14:25 19505<br />
08/17/00 IO:05 10734<br />
08/23/W lo:07 10878<br />
o8/2o/w 9:40 10004<br />
00/20/w 1036 20107<br />
00/27/w 8:51 20281<br />
10/02/00 11:05 20409<br />
10131/00 11:05 20400<br />
4<br />
35<br />
0<br />
2<br />
27<br />
28<br />
12<br />
6<br />
I<br />
0<br />
1<br />
3<br />
2<br />
0<br />
7<br />
3<br />
2<br />
4<br />
2<br />
1<br />
6300<br />
6600<br />
5600<br />
6300<br />
6300<br />
5.300<br />
5800<br />
64W<br />
7wo<br />
6800<br />
4800<br />
6200<br />
5600<br />
6600<br />
3200<br />
5600<br />
3700<br />
3ow<br />
5100<br />
47w<br />
5100<br />
3900<br />
4400<br />
4200<br />
54w<br />
5200<br />
5600<br />
56W<br />
3000<br />
4909<br />
2169<br />
3260<br />
4298<br />
4050<br />
530<br />
2600<br />
4300<br />
5400<br />
3500<br />
5000<br />
3600<br />
3800<br />
3800<br />
3000<br />
6400<br />
6200<br />
8000<br />
7600<br />
7200<br />
7OOQ<br />
6700<br />
7500<br />
7200<br />
6700<br />
6100<br />
7500<br />
590<br />
585<br />
586<br />
561<br />
576<br />
568<br />
567<br />
571<br />
575<br />
565<br />
565<br />
564<br />
562<br />
556<br />
543<br />
540<br />
550<br />
551<br />
559<br />
460<br />
460<br />
460<br />
460<br />
544<br />
554<br />
535<br />
525<br />
524<br />
560<br />
546<br />
567<br />
568<br />
574<br />
556<br />
550<br />
585<br />
559<br />
569<br />
538<br />
571<br />
574<br />
585<br />
571<br />
570<br />
576<br />
582<br />
578<br />
572<br />
580<br />
578<br />
567<br />
581<br />
570<br />
577<br />
573<br />
577<br />
567<br />
560<br />
551<br />
566<br />
460<br />
980<br />
1161<br />
1131<br />
1050 0.021<br />
1057<br />
1150<br />
1258<br />
1244<br />
878<br />
1136<br />
1030<br />
1227<br />
600<br />
1002<br />
695<br />
563 0.166<br />
943<br />
693<br />
052<br />
753 0.046<br />
666<br />
828<br />
007<br />
084 0.010<br />
1021<br />
1023<br />
540<br />
011 0.144<br />
394<br />
596<br />
794 0.151<br />
738 0.062<br />
102<br />
471<br />
774 0.032<br />
954 0.008<br />
634<br />
893<br />
646<br />
675<br />
680 O.Wl<br />
705 0.005<br />
1141 0.016<br />
1109 0.011<br />
1409 0.002<br />
1352 0.037<br />
1306 0.016<br />
1254 0.011<br />
1200<br />
1344 0.021<br />
1313 0.011<br />
1217<br />
1144<br />
1365 0.005<br />
2.0<br />
9.4<br />
3.2<br />
0.8<br />
11.7<br />
10.7<br />
4.1<br />
2.2<br />
0.5<br />
0.1<br />
0.3<br />
1.6<br />
1.1<br />
0.3<br />
4.5<br />
1.0<br />
1.2<br />
2.6<br />
1.2<br />
0.6<br />
25722.3<br />
25722.3<br />
25722.3<br />
25722.3<br />
25722.3<br />
25728.7<br />
25735.6<br />
25735.8<br />
25735.6<br />
25735.6<br />
25735.6<br />
25735.6<br />
25735.6<br />
25735.8<br />
25735.8<br />
25735.8<br />
25735.8<br />
25744.7<br />
25775.6<br />
25775.6<br />
25775.6<br />
25775.6<br />
25775.6<br />
25775.6<br />
Blower down for repai<br />
Blower down for repai,<br />
Blower down for repail<br />
Blower down for repail<br />
25775.6<br />
25700.0<br />
25790.1<br />
25709.1<br />
25799.1<br />
25802.0<br />
25806.2<br />
25806.2<br />
25806.2<br />
25656.4<br />
25696.7<br />
25896.7<br />
25950.4<br />
25088.1<br />
25897.0<br />
25097.5<br />
26W1.7<br />
26014.1<br />
26014.6<br />
26014.6<br />
26014.6<br />
26014.6<br />
26014.7<br />
26016.2<br />
26022.1<br />
26034.2<br />
26038.1<br />
26060.4<br />
26072.6<br />
26085.1<br />
26088.6<br />
26096.2<br />
26105.4<br />
26108.4<br />
26108.4<br />
26110.1<br />
26110.1 System down for blower repail<br />
Notes:<br />
Site 2477 Updated: 11110100 Page 3 Of 4
OUTPUT TABLE Cumulative Mas, olattle Hydrocarbons Discharged<br />
Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />
MC9 CAMP LEJEUNE - TT-2477/78<br />
WE Field # 1 pipe diameter 6<br />
C=(PPtv&~)xKx@$MJ~lOOO<br />
c: “apormncentratian (ma/l)<br />
PPL FID reading W-PM)<br />
K: number of cmtwn atoms in calibration gas<br />
(I III methane)<br />
TH: total hydmcadwns calwlated as gasoline<br />
(GRQ<br />
Q=(1-6)xVxAx(P/~~x~~)<br />
Q: vapor “owl’& (SCFM)<br />
6: percent water vspa in f+nvnresm<br />
v: vapor velocity (fdmin)<br />
A: moss-sedllal area c-a. fo<br />
P: absokde pressure of flowstream (” Hg)<br />
PM: standard pressure (29.92” Hg)<br />
T: absolute temperature of flowstream (degrees Rankine)<br />
TM standard ,emperat”re (528 de‘~reeS Rankine)<br />
M=QxCxo.0696<br />
M: hydiocalbon ,~cxyely rate (Iblday)<br />
Assumptions:<br />
Mg = 128 mgimg-mole<br />
Kg = 24.07 dsmA3/10”6 gm -mole<br />
B = 0.003 from Perry’s Chemical Handbook<br />
A=O.W3%,.ft<br />
Site 2477 Updated: 11/10/00 Page 4 Of 4
TT- 2477178 VOC Pounds Removed and Costs<br />
1200<br />
1000<br />
800<br />
4<br />
5 600<br />
B<br />
400<br />
$4,000.00<br />
200<br />
$2,000.00<br />
0<br />
Now99 Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 O&O0<br />
Past 12 Months<br />
-4 ! 60.00<br />
- VOC Pounds -+ Cost/ VOC Pound Removed -Average -Average<br />
Task Order 33 - Project 780790 Camp Lejeune MCB. NC October 31.<strong>2000</strong>
2<br />
TT2477178<br />
Cumulative VOC Pounds Removed<br />
26206<br />
26000<br />
25800<br />
25700<br />
25600<br />
Now99<br />
Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00<br />
J<br />
Past 12 Months<br />
-Cumulative<br />
Pounds Removed<br />
Task Order 33 - Project 780790 Camp Lejeune MCB, NC October 31.<strong>2000</strong>
Cumulative Mass of Volh ydrocarbons Discharged<br />
Air Sparging (AS) I Soil Vapor Extraction (WE) System<br />
MCB CAMP LEJEUNE - BM-820-<br />
10/29/87 8:20 2<br />
1 o/30/97 10:10 9<br />
10/30/97 13:49 10<br />
1 l/04/97 11:lO 15<br />
1 l/05/97 17:30 31<br />
1 l/0+3/97 14:25 49<br />
1 l/09/97 8:30 115<br />
11111/97 QTOO 164<br />
11/11/97 10:20 185<br />
1 l/14/97 14:30 232<br />
1 l/15/97 8:30 249<br />
1 l/16/97 14:oo 278<br />
1 l/28/97 14:30 400<br />
l2lOl197 9:30 467<br />
12/17/97 9:W 738<br />
12/18/97 9:15 760<br />
01/05/98 moo 1192<br />
01/0+3/98 15:lO 1215<br />
01/12/98 13:oo 1367<br />
01/12/98 14:00 1358<br />
01/21/98 14:oo 1572<br />
01/26/98 13:oo 1612<br />
02/02/98 17:oo 1879<br />
02/l 1198 14:OO 1645<br />
0212OiQ8 8:30 1911<br />
02X24198 11:oo 1987<br />
03x)3/98 9:Oo 2144<br />
03/15/98 7:30 2407<br />
03/28/98 9:45 2468<br />
04/10/98 1530 2889<br />
04/13/98 13:45 2780<br />
04/23/98 10:15 2998<br />
04/29/98 12:20 3142<br />
06/29/88 1o:oo 3885<br />
C%/29/98 12:30 3888<br />
07/09/98 11:15 4127<br />
07/09/98 15:45 4132<br />
07/13iQ8 9:45 4221<br />
07/13/98 12:30 4223<br />
07/22/98 9:30 4217<br />
07/22/98 12:oo 4220<br />
08/03/98 11:15 4505<br />
08/03/98 13:45 4506<br />
06/21/98 12:30 4745<br />
08/21/98 16:45 4749<br />
09/03/98 9:oo 4839<br />
09/03/98 13:30 4842<br />
09/Q/98 7:30 4909<br />
09/12/98 10:45 4912<br />
09/16/96 12:40 4935<br />
09/16/98 15:lO 4937<br />
09/24/98 ll:oo 5155<br />
09/24/98<br />
10/07/98 10:44 5279<br />
10107198<br />
10/14iQ8 8:50 5351<br />
10/14/98<br />
lo/21198<br />
IO/21198<br />
10/22/981<br />
10127198<br />
8~45<br />
14:05<br />
9:05<br />
8:21<br />
5472<br />
5477<br />
5496<br />
5617<br />
10/27/98 13:oo 5821<br />
38<br />
148<br />
139<br />
78.2<br />
123<br />
73<br />
77<br />
59.9<br />
84.3<br />
103.4<br />
63.7<br />
59.9<br />
SO.8<br />
46.7<br />
13.2<br />
5.3<br />
0.1<br />
1<br />
20.4<br />
2.1<br />
8.8<br />
2.5<br />
11<br />
11<br />
13<br />
30<br />
21<br />
16<br />
14<br />
14<br />
10<br />
IO<br />
7<br />
5<br />
7<br />
8<br />
10<br />
17<br />
19<br />
11<br />
8<br />
38<br />
18.5<br />
4776<br />
4026<br />
3730<br />
4093<br />
4659<br />
4218<br />
4802<br />
4837<br />
4697<br />
5286<br />
4882<br />
4597<br />
59W<br />
4700<br />
4100<br />
1700<br />
3700<br />
3300<br />
5800<br />
5500<br />
5100<br />
54W<br />
4500<br />
4500<br />
2200<br />
8WO<br />
4530<br />
2600<br />
1700<br />
2100<br />
1400<br />
2100<br />
2100<br />
700<br />
400<br />
700<br />
800<br />
1300<br />
1000<br />
1400<br />
1200<br />
1800<br />
15w<br />
IWO<br />
1100<br />
1000<br />
1100<br />
2400<br />
14w<br />
900<br />
1200<br />
6WO<br />
5600<br />
5500<br />
5800<br />
54W<br />
56W<br />
5900<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29 92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
29.92<br />
5800 29.92<br />
588<br />
606<br />
520<br />
522<br />
541<br />
532<br />
522<br />
530<br />
532<br />
536<br />
524<br />
527<br />
546<br />
534<br />
534<br />
526<br />
544<br />
549<br />
538<br />
537<br />
529<br />
536<br />
539<br />
543<br />
542<br />
539<br />
528<br />
544<br />
549<br />
541<br />
548<br />
522<br />
544<br />
563<br />
557<br />
566<br />
586<br />
558<br />
557<br />
556<br />
558<br />
550<br />
549<br />
580<br />
555<br />
554<br />
556<br />
541<br />
549<br />
580<br />
556<br />
548<br />
460<br />
550<br />
460<br />
542<br />
460<br />
531<br />
541<br />
530<br />
537<br />
2330<br />
1906<br />
2058<br />
2250<br />
2471<br />
2274<br />
2637<br />
2618<br />
2533<br />
2831<br />
2672<br />
2504<br />
3104<br />
2526<br />
2206<br />
928<br />
1953<br />
1728<br />
3095<br />
2941<br />
2768<br />
2893<br />
2397<br />
2379<br />
1185<br />
3196<br />
2447<br />
1372<br />
889<br />
1114<br />
734<br />
1155<br />
1108<br />
357<br />
206<br />
361<br />
303<br />
671<br />
515<br />
723<br />
817<br />
835<br />
784<br />
513<br />
569<br />
518<br />
568<br />
1274<br />
732<br />
481<br />
620<br />
3144<br />
0.202 42.1<br />
0.787 134.3<br />
0.739 138.1<br />
0.405 81.6<br />
0.654 144.8<br />
0.368 79.0<br />
0.409 96.6<br />
0.319 74.6<br />
0.448 101.8<br />
0.550 139.3<br />
0.339 81.0<br />
0.319 71.4<br />
0.483 1342<br />
0.248 56.1<br />
0.070 5.8<br />
0.028 4.4<br />
0.001<br />
o.w5<br />
0.1<br />
1.5<br />
0.108 13.3<br />
0.011 1.1<br />
0.035 2.3<br />
0.013 1.4<br />
0.058 5.8<br />
0.058 1.9<br />
0.069 1.3<br />
0.160 5.2<br />
0.112 3.0<br />
0.085 5.1<br />
0.074 3.4<br />
0.074 4.8<br />
0.053 2.9<br />
0.053 4.0<br />
0.037 2.6<br />
0.027 1.2<br />
0.037 1.9<br />
0.043 2.0<br />
0.053 2.7<br />
0.090 10.3<br />
0.101 6.6<br />
0.058 2.4<br />
0.043 2.4<br />
1.9<br />
26.9<br />
31.5<br />
55.0<br />
130.4<br />
214.7<br />
456.6<br />
629.6<br />
634.5<br />
970.8<br />
1049.9<br />
1140.9<br />
1663.3<br />
1929.0<br />
2243.8<br />
2246.5<br />
2299.0<br />
2301.1<br />
2314.0<br />
2314.0<br />
2314.0<br />
2314.0<br />
2314.0<br />
2314.0<br />
2314.1<br />
2316.6<br />
2321.5<br />
2394.5<br />
2417.0<br />
2421.7<br />
2430.1<br />
2448.2<br />
2470.0<br />
2588.7<br />
2588.9<br />
2621.0<br />
2621.8<br />
2636.9<br />
2637.3<br />
2638.3<br />
2636.7<br />
2677.8<br />
2678.2<br />
2697.1<br />
2697.4<br />
2704.7<br />
2704.9<br />
2723.1<br />
2724.2<br />
2728.5<br />
2728.7<br />
2739.4<br />
2739.4<br />
2739.4<br />
2739.4<br />
2739.4<br />
2739.4<br />
2739.4<br />
2739.4<br />
2739.4<br />
2880.8<br />
ASISVE Fields la2<br />
AS/SVE Fields la2<br />
AS/S/E Fields l&2<br />
ASJSVE Fields l&2<br />
AS/SVE Fields la2<br />
ASISVE Fields 384<br />
ASISVE Fields 3&4<br />
ASISVE Fields 3a4<br />
AS/SVE Fields l&2<br />
ASISVE Fields la2<br />
AS/SVE Fields ia<br />
ASISVE Fields 384<br />
ASLSVE Fields la2<br />
ASISVE Fields 3&4<br />
ASISVE Fields 3&4<br />
AWSVE Fields la2<br />
AWSVE Fields 182<br />
AS/SVE Fields 384<br />
ASISVE Fields la2<br />
ASISVE Fields 384<br />
AWSVE Fields 384<br />
AWSVE Fields 384<br />
AWSVE Fields 384<br />
ASISVE Fields 3a4<br />
AS/SVE Fields 3&4<br />
ASISVE Fields 3&4<br />
ASlSVE Fields 3&4<br />
ASISVE Fields 3&4<br />
ASISVE Fields l&2<br />
AS/SVE Fields la2<br />
Stack vel est., AS/SVE Fields la2<br />
AS/SVE Fields Ia2<br />
#3&4. Meter data given not cumulative I<br />
#l&2. Meter data given not cumulative<br />
#3a4<br />
#W<br />
#3a4<br />
#l&2<br />
#3a4<br />
#l&2<br />
ma2<br />
#3a4<br />
#l&2<br />
#3&4<br />
ma4<br />
Field # l&2 in repair for water in line<br />
2923<br />
#3a4<br />
Field # l&2 in repair for water in line<br />
2914<br />
#3a4. water in lines<br />
Field # la2 in repair for water in line<br />
540<br />
3136<br />
2886<br />
3034<br />
3101<br />
3084<br />
0.202<br />
0.098<br />
56.1<br />
27.2<br />
2867.7<br />
373a4<br />
#l&2<br />
#I Offline<br />
#ia2<br />
#3a4(<br />
Site 820<br />
Updated:<br />
1 l/10/00<br />
Page 1 of 3
Cumulative Mass of Vola.. ydrocarbons Discharged<br />
Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />
MCB CAMP LEJEUNE - BM-820<br />
SVE Stack<br />
11114lQ8 9:21 5815<br />
11119/98 IO:15 5931<br />
II/IS/98 14:oo 5935<br />
12/05/98 14:oo 8319<br />
12/31/98 14:oo 8391<br />
01/07/99 9:40 6478<br />
01/07/99 13:O.S 6481<br />
01/12/99 9:10 6593<br />
01/12/99 13:15 8597<br />
01/2l/QS 10:05 8810<br />
01/21/99 13:oo 6818<br />
01/28/99 8~35 8929<br />
Oli26/99 12:05 6932<br />
02/05/99 9:30 7172<br />
02/a/99 15:w 7337<br />
02/17/99 13:oo 7448<br />
02mi99 9:45 7561<br />
03/03/99 1o:oo 7666<br />
03/12/99 8:30 7878<br />
03/17/99 13:w 8W2<br />
03/29/99 1l:W 8188<br />
04/08/99 1200 8403<br />
04/15/99 9:oo 8589<br />
04/21/99 8:00 8712<br />
05105199 1l:W 8933<br />
05llO/QQ 7:30 9051<br />
05/21/99 8:30 9071<br />
05/28/99 9:30 9240<br />
06/04/99 15:30 9413<br />
06/11/99 13:30 9580<br />
06/19/99 9:w 9750<br />
08/22/99 12:w 9788<br />
07/05/99 9:W 10100<br />
07/08/99 8:00 10174<br />
07/16/QQ 10:45 10363<br />
07121199 15:30 10488<br />
07/27/99 7:30 10822<br />
08/03/99 11:45 10771<br />
08/10/99 8:15 10934<br />
OW20/99 13:40 11175<br />
08/23/99 13:45 11242<br />
08/31/99 13:21 11395<br />
09/08/99 13:40 11474<br />
10/05/99 10:20 11790<br />
10/12/99 11:15 1195s<br />
10/19/99 a:15 12124<br />
10/28/99 11:15 12341<br />
11/05/99 15:35 12519<br />
1 l/12/99 1355 12631<br />
11/19/99 12:35 12699<br />
11/23/99 11:01 12797<br />
12/03/99 10:50 13028<br />
12112199 12:47 13185<br />
12/18/99 11:40 13308<br />
01/03/00 1350 13428<br />
01/09/00 10:12 13545<br />
01/11/w 14:20 13597<br />
o112o/w 13:30 13718<br />
OlR8/W 13:25 13783<br />
02/03/00 10:49 13901<br />
02/10/00 9:58 14058<br />
02/17/Wl 14:391 14226<br />
78 5200 29.92 530 2817 0.415<br />
57<br />
4sO0<br />
8100<br />
2649<br />
3288<br />
0.303<br />
8100<br />
3255<br />
6100<br />
3255<br />
6100<br />
3255<br />
14<br />
17<br />
15<br />
IO<br />
21<br />
23<br />
27<br />
9.5<br />
5400<br />
5400<br />
5000<br />
5OW<br />
6100<br />
woo<br />
6000<br />
6000<br />
8W<br />
2970<br />
2931<br />
2719<br />
2709<br />
3298<br />
3208<br />
3313<br />
3288<br />
318<br />
0.074<br />
0.090<br />
0.080<br />
0.053<br />
0.112<br />
0.122<br />
0.144<br />
0.051<br />
1200<br />
832<br />
2200<br />
1140<br />
7.3<br />
22<br />
9<br />
23<br />
38<br />
22<br />
0<br />
5<br />
1900<br />
2wo<br />
43w<br />
4700<br />
5900<br />
5700<br />
57w<br />
5200<br />
1049<br />
1054<br />
2365<br />
2401<br />
3063<br />
2943<br />
2978<br />
2833<br />
0.039<br />
0.117<br />
0.048<br />
0.122<br />
0.191<br />
0.117<br />
0.032<br />
0.027<br />
9<br />
9<br />
10<br />
10<br />
1295<br />
60<br />
4<br />
4<br />
907<br />
4<br />
48<br />
5900<br />
5800<br />
5400<br />
500<br />
400<br />
500<br />
800<br />
Qw<br />
<strong>2000</strong><br />
4900<br />
5200<br />
2100<br />
4200<br />
1800<br />
5400<br />
5900<br />
55w<br />
5600<br />
5900<br />
5800<br />
5800<br />
5900<br />
5800<br />
5700<br />
5800<br />
56W<br />
6300<br />
5900<br />
8100<br />
5800<br />
5900<br />
34W<br />
5900<br />
8400<br />
5900<br />
29.92 531<br />
29.92 538<br />
29.92 538<br />
29.92 538<br />
29.92 538<br />
29.92 522<br />
29.92 529<br />
29.92 528<br />
29.92 530<br />
29.92 531<br />
29.92 537<br />
29.92 520<br />
29.92 524<br />
29.92 542<br />
29.92 545<br />
29.92 554<br />
29.92 520<br />
29.92 545<br />
29.92 522<br />
29.92 562<br />
29.92 553<br />
29.92 556<br />
29.92 550<br />
29.92 527<br />
30.92 460<br />
31.92 480<br />
32.92 561<br />
33.92 553<br />
34.92 567<br />
35.92 556<br />
38.92 544<br />
37.92 552<br />
38.92 581<br />
39.92 578<br />
40.92 573<br />
41.92 577<br />
42.92 572<br />
43.92 567<br />
44.92 554<br />
45.92 574<br />
48.92 573<br />
47.92 558<br />
48.92 571<br />
49.92 549<br />
50.92 553<br />
51.92 540<br />
52.92 542<br />
53.92 553<br />
64.92 554<br />
55.92 540<br />
56.92 551<br />
57.92 539<br />
58.92 a44<br />
59.92 535<br />
60.92 544<br />
61.92 535<br />
62.92 551<br />
63.92 530<br />
84.92 515<br />
65.92 523<br />
66.92 534<br />
3020<br />
3011<br />
2734<br />
258<br />
211<br />
260<br />
297<br />
449<br />
1002<br />
2438<br />
2610<br />
1063<br />
2177<br />
900<br />
2706<br />
3036<br />
2766<br />
2929<br />
3063<br />
3084<br />
3072<br />
3083<br />
2902<br />
3031<br />
3022<br />
2983<br />
3325<br />
3186<br />
3219<br />
3113<br />
3074<br />
2925<br />
3289<br />
3513<br />
3172<br />
0.048<br />
0.048<br />
0.053<br />
0.053<br />
6.887<br />
0.319<br />
0.021<br />
0.021<br />
4.823<br />
0.021<br />
0.255<br />
0.005<br />
104.6<br />
71.9<br />
19.8<br />
23.7<br />
19.4<br />
12.9<br />
33.0<br />
35.1<br />
42.8<br />
14.9<br />
3.6<br />
11.0<br />
10.1<br />
26.3<br />
52.5<br />
30.8<br />
8.5<br />
6.7<br />
12.9<br />
1.1<br />
1.0<br />
1.2<br />
617.7<br />
69.6<br />
5.0<br />
2.0<br />
388.7<br />
5.3<br />
66.9<br />
1.4<br />
3417.4 #I1<br />
3421.1 #31<br />
3594.8 Field # l(<br />
3594.8 Field#31<br />
3594.8 Data lnter<strong>pol</strong>atil<br />
3594.8 Data lnterpalatil<br />
3630.6 Field # 11<br />
3633.4 Field # 3(<br />
3734.0 Field# I(<br />
3738.7 Field # 3f<br />
3940.2 Field # 12<br />
3948.7 Field # 3(<br />
4131.6 Field #If<br />
4135.2 Field # 3E<br />
4209.5 No FID data for this eve<br />
4209.5<br />
4209.5<br />
4218.2<br />
4250.3<br />
4343.8<br />
4437.9<br />
4739.8<br />
5118.4<br />
5252.4<br />
5297.8<br />
5328.8 No readings aveilableduetobad equi<br />
5328.8 System down,heatexchangE<br />
5328.8 No FID dataforthis eve<br />
5374.3<br />
5420.8 NO FID data for this eve<br />
5424.6<br />
5432.1<br />
6433.9<br />
5441.9<br />
5441.9<br />
7874.0<br />
9635.2<br />
9846.5<br />
9868.3<br />
9875.1<br />
11826.6<br />
12389.1<br />
12369.1<br />
12377.8<br />
12852.9<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13088.5<br />
13093.4<br />
Site 820 Updated: 11/10/00 Pagezof3
Cumulative Mass of Volh...dHydrocarbons Discharged<br />
Air Sparging (AS) I Soil Vapor Extraction (SVE) System<br />
MCB CAMP LEJEUNE - BM-820<br />
03/02/00 l&30 14662<br />
03/18/00 9:OO 14589<br />
03/28/00 1295 14828<br />
04/08/W 8:W 15093<br />
04/14/00 7:15 15093<br />
04/17/00 IO:00 15097<br />
04/28/W lo:00 15353<br />
05/05/00 8:48 15473<br />
05/09mO ll:oo 15573<br />
05/16!00 ll:w 15693<br />
05R6/W lo:oo 15924<br />
W/08/W 8:30 16235<br />
oa/18/W 14:05 16431<br />
06R2m 12% 16574<br />
C8R8lW 13:55 16691<br />
07/05ml 14~02 16858<br />
07/14/00 15:23 17076<br />
07/19m 11:09 17192<br />
07R8m 16:31 17389<br />
08/03/00 II:03 17525<br />
08/11/00 1455 17605<br />
08/18/W 9:11 17758<br />
08R4lOO 8:Ol 17901<br />
09101100 9:50 18033<br />
09/07/00 1403 18181<br />
09/12/w lo:36 18240<br />
09/20/w 8:05 18381<br />
OSR7/00 10:31 18517<br />
10/02/w 12:55 18639<br />
10112/00 IO:10 18876<br />
10/28/W 9:35 19108<br />
10/31100 9:35 19228<br />
0.4 6100<br />
5642<br />
6537<br />
6500<br />
48W<br />
5870<br />
4900<br />
0.2 6300<br />
0.3 6100<br />
0.6 7300<br />
0.3 77w<br />
5800<br />
3 7600<br />
7200<br />
7200<br />
0.2 7000<br />
6900<br />
1 76W<br />
2 7300<br />
2 7300<br />
20 7800<br />
7200<br />
4 7400<br />
4 7200<br />
6 7000<br />
0.5 7200<br />
8200<br />
0.6 88W<br />
7300<br />
7500<br />
73w<br />
69.92<br />
70.92<br />
71.92<br />
71.92<br />
71.92<br />
71.92<br />
71.92<br />
71.92<br />
72.92<br />
73.92<br />
74.92<br />
75.92<br />
78.92<br />
77.92<br />
78.92<br />
79.92<br />
80.92<br />
81.92<br />
82.92<br />
83.92<br />
84.82<br />
85.92<br />
86.92<br />
87.92<br />
88.92<br />
89.92<br />
90.92<br />
91.92<br />
92.92<br />
93.92<br />
94.92<br />
95.92<br />
545<br />
576<br />
559<br />
561<br />
555<br />
590<br />
571<br />
578<br />
570<br />
460<br />
588<br />
585<br />
608<br />
599<br />
594<br />
599<br />
600<br />
605<br />
593<br />
593<br />
587<br />
594<br />
5B4<br />
582<br />
587<br />
572<br />
582<br />
558<br />
586<br />
570<br />
587<br />
572<br />
3214<br />
2812<br />
3358<br />
3327<br />
2483<br />
2780<br />
2465<br />
3129<br />
3073<br />
3565<br />
3779<br />
2739<br />
3643<br />
3480<br />
3451<br />
3350<br />
3275<br />
3680<br />
3534<br />
3511<br />
3770<br />
3540<br />
3851<br />
3522<br />
3514<br />
3552<br />
4145<br />
4312<br />
3677<br />
3798<br />
3664<br />
0.002<br />
0.001<br />
0.002<br />
0.003<br />
0.002<br />
0.016<br />
0.001<br />
0.005<br />
0.011<br />
0.011<br />
0.106<br />
0.021<br />
0.021<br />
0.032<br />
0.003<br />
0.003<br />
0.6<br />
0.3<br />
0.4<br />
1.0<br />
0.5<br />
5.2<br />
0.3<br />
1.8<br />
3.4<br />
3.3<br />
35.9<br />
6.9<br />
6.7<br />
10.0<br />
0.8<br />
1.2<br />
13107.0<br />
13107.4<br />
13107.4<br />
13107.4<br />
13107.4<br />
13107.4<br />
13107.4<br />
13108.1<br />
13109.6<br />
13110.7<br />
13115.6<br />
13125.7<br />
13127.9<br />
13143.4<br />
13158.1<br />
13156.1<br />
13157.5<br />
13158.3<br />
13185.5<br />
13180.0<br />
13191.2<br />
13316.2<br />
13423.1<br />
13442.3<br />
13464.4<br />
13504.9<br />
13536.9<br />
13539.3<br />
13842.4<br />
13548.5<br />
13548.5<br />
13548.5<br />
System down for samptk<br />
Extra<strong>pol</strong>ated<br />
Dal<br />
Notes:<br />
C=(PP~~xKx(~ll(WO<br />
C: vapor concentration (m@l<br />
PP&. FID reading (PPM)<br />
K: number of catin atoms in calibration gas<br />
(t I” methane)<br />
TH: total hydmcarbas cakxlated as gasoline<br />
IGRO)<br />
percent water vapor by volume 0.003<br />
SVE Stack pipe diameter 10<br />
‘2=(1-8)xVxAx(P/P,,)x(T.JTl<br />
a: “.3p4rflowrate (SCFM)<br />
8: percent water vapor in flow5tmarn<br />
V: vawr vekiiy (Ehnin)<br />
A: aosJ-Sedion.3l area (sq. I)<br />
P: absolute pressure of Rowstrain (” Hg)<br />
Paa standard pressure (29.92” Hg)<br />
T: absolute tOmpe‘at”,e ‘if Rowstream (degrees Rsnkine)<br />
T, standard temperature (528 degrees Rankinef<br />
at 68 degrees F (from Pervs handbwk)<br />
* Estimated value due to malfunctionng iwtrument<br />
M-QxCxO.0895<br />
M: hydmtin remwly rate (lb/day)<br />
ASSWllpOOtlS:<br />
MQ = 128 mglnlg-mole<br />
Kg = 24.07 dsm%wCw gm mole<br />
B = 0.003 from Percy’s Chemical Handbook<br />
A = 0.545 sq. fl<br />
Site 820 Updated: 1 l/10/00 Page 3 of 3
Building 820<br />
VOC Pounds Removed and Costs<br />
300<br />
$8.000.00<br />
200<br />
100<br />
$2,000.00<br />
50<br />
$1,000.00<br />
0<br />
lov-99 Dee99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 O&O0<br />
Past 12 Months<br />
$0.00<br />
- VOC Pounds -+- Cost/ Pound Removed -Average -Average<br />
Task Order 33 - Project 780790 Camp Lejeune MCB. NC October 31,200O
n, <br />
Building 820<br />
Cumulative VOC Pounds Removed<br />
14000<br />
13000<br />
12500<br />
Nov-99<br />
Dee-99<br />
Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 oct-oo<br />
I<br />
Past 12 Months<br />
/-Cumulative Pounds Removed /<br />
Task Order 33 - Project 780790 Camp Lejeune MCB, NC October 31.<strong>2000</strong>
MONTHLY PROGRESS REPORl r- ’ SHORT FORM<br />
Report Dates: October 1, <strong>2000</strong> to October 31,200O<br />
Contract No.: N62470-97-D-5000<br />
Order No.: 0036<br />
Pr,sct No.: 781774<br />
Project Name: Monitoring Well Abandonment<br />
Project Location: MCB Camp Lejeune, NC<br />
Project Manager: James A. Dunn, Jr., P.E.<br />
Project<br />
Description:<br />
Plug and properly abandon monitoring wells at various locations<br />
throughout Camp Lejeune.<br />
Hard Copies Distributed to:<br />
COTR:<br />
Karen Wilson (757)322-4817<br />
Wilsonke@efdlant.navfac.navv.mil<br />
RAC CM:<br />
(757)396-5121<br />
Greg Hedley<br />
Hedlevos@efdlant.navfac.navv.mil ext’ 383<br />
Project Controls Manager:<br />
Linda Barberousse<br />
Lbarberousse@theitaroup.com<br />
Contract Files<br />
Scheduled Web Site Posting Date:<br />
ROICC:<br />
November 22,200O<br />
Brent Rowse<br />
(757)363-7190<br />
Original Contract Start Date:<br />
Original Contract Completion Date:<br />
Current Contract Completion Date:<br />
O&M Completion Date:<br />
Current Projected Completion Date:<br />
esting an extension to the Period of Performance<br />
Current TO Ceiling:<br />
Total $ to Date:<br />
Remaining Funds:<br />
Estimated Report Period:<br />
Forecast @ Completion:<br />
Previous Period Forecast @ Completion:<br />
51,340.oo<br />
8,014.OO<br />
43,326.OO<br />
2,766.OO<br />
50,848.OO<br />
51,330.oo<br />
During October, plugged and abandoned 12 wells in accordance with Addendum 6 to the Work Plans.<br />
None<br />
None<br />
ne Sites at the<br />
Totals 1 $51,340.89 ) $2,194.99 1 $53,535.8E<br />
Approved by: qOatim . Attachments: ;~r;;;~~q$<br />
Roland Moreau, P.E.<br />
Program Manager
IT Corporation<br />
START DATE 01 JA.<br />
FIN DATE OJJANOI<br />
Task Orde onitoring Well Abandonment PAGE NO. 1<br />
DATE<br />
OJNOVW<br />
Performance<br />
Report<br />
WBS<br />
Code<br />
Description<br />
Oll<br />
Bud<br />
ant<br />
Qnt<br />
Rev<br />
CW<br />
ant<br />
Task<br />
Unit<br />
Ins Task orig. s Current Eamed<br />
ant % Budg Rev./ Budg. S<br />
Comp $ Adjust $<br />
Actual ETC Forecast Variance Variance K Physl<br />
s CPI At from from of %<br />
ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />
01000010<br />
Precon<br />
Mut. Und. Meeting<br />
ml<br />
0<br />
loo %<br />
IW<br />
103<br />
1950 0 1950 1950<br />
0<br />
0.00 0 0 -1950<br />
-1950<br />
3.6 3.6<br />
01000100<br />
Mobe Construction<br />
Equipme<br />
103<br />
0<br />
loo %<br />
0<br />
0<br />
8667 0 6667 0<br />
0<br />
0.00 6667 6667 0<br />
0<br />
16.9 0.0<br />
01000200<br />
Submittalsllmplementation<br />
100<br />
0<br />
lco %<br />
30<br />
30<br />
4442 0 4442 1333<br />
279<br />
0.21 4163 4442 0<br />
0<br />
a.7 26<br />
01003000<br />
Estimate<br />
Prep<br />
100<br />
0<br />
ml %<br />
1CO<br />
IW<br />
0 0 0 0<br />
1961<br />
0.00 0 1961 1961<br />
1961<br />
0.0 0.0<br />
01003010<br />
DO@6<br />
Cost Proposal<br />
KY3<br />
0<br />
1Mf 96<br />
IW<br />
100<br />
3456 0 3456 3458<br />
311<br />
0.09 0 311 3147<br />
-3147<br />
6.7 6.7<br />
02004000<br />
Monitoring<br />
Wells<br />
100<br />
0<br />
loo %<br />
2.2<br />
22<br />
16823 0 16623 4141<br />
4036<br />
0.98 16014 20053 1230<br />
1230<br />
36.7 8.1<br />
21004000<br />
Demoba Construction Equip<br />
KC<br />
0<br />
la, 56<br />
0<br />
0<br />
2325 0 2325 0<br />
0<br />
0.00 2325 2325 0<br />
0<br />
4.5 0.0<br />
66666666<br />
2WO Rastrwiuring<br />
Costs<br />
1W<br />
0<br />
la, %<br />
0<br />
0<br />
0 0 0 0<br />
10<br />
0.00 72 a2 a2<br />
82<br />
0.0 0.0<br />
90000000<br />
Fud<br />
103<br />
0<br />
IO %<br />
30<br />
30<br />
304 0 204 91<br />
0<br />
0.00 304 334 0<br />
0<br />
0.6 0.2<br />
96001000<br />
Supervision<br />
andManagemen<br />
1CQ<br />
0<br />
loo 36<br />
30<br />
30<br />
1320 0 1320 3%<br />
1242<br />
3.14 1349 2591 1271<br />
1271<br />
2.6 0.8<br />
98004000<br />
EngklWrillg<br />
100<br />
0<br />
la, %<br />
30<br />
30<br />
3144 0 3144 943<br />
0<br />
0.00 3144 3144 0<br />
0<br />
6.1 1.8<br />
98005000<br />
Purchasing<br />
Assistance<br />
100<br />
0<br />
loo %<br />
30<br />
30<br />
479 0 479 144<br />
54<br />
0.36 426 460 1<br />
0.9 0.3<br />
98016000<br />
Per Diem<br />
100<br />
0<br />
100 %<br />
30<br />
30<br />
1841 0 1841 552<br />
32<br />
0.06 1809 1641 0<br />
0<br />
3.6 1.1<br />
9809<strong>2000</strong><br />
Equipment<br />
100<br />
0<br />
lco %<br />
30<br />
20<br />
4566 0 4566 1376 86 0.06 4560 4647 60 W a.9 2.7<br />
51340 0 51340 14384 8014 0.56 42835 50848 -492 -492 100.0 28.0<br />
51340 0 51340 14394 8014 0.56 4283.5 50848 492 492 100.0 28.0
Work<br />
cfive Log<br />
Monitoring Wei1 Abandonment<br />
Task Order: 36<br />
Project Number: 781774<br />
1/10/00<br />
Impacts<br />
(TD)OOl<br />
(TD)OOZ<br />
SG<br />
TD<br />
6/20/00<br />
Q/l 3100<br />
6127100 A<br />
9/13/00 A<br />
N/A Abandon monitoring well at Site TC 647 30 N $1,000<br />
N/A Abandon 4 monitoring wells at Site CGI; abandon 8 monitoring wells at Boldg 1450. 30 N $3,050<br />
Chanae Tvoe:<br />
TD - Technical Directive<br />
SG - Scope Growth<br />
SR - Scope Reduction<br />
Status:<br />
A -Approved<br />
P - Pending<br />
R - Rejected<br />
W-Withdrawn<br />
Page 1
Report Dates:<br />
MONTHLY PROGRESS REPORT - SHORT FORM<br />
October 1, <strong>2000</strong> to October 31,200O Hard Copies Distributed to:<br />
Contract No.: N62470-97-D-5000<br />
I COTR:<br />
Karen Wilson<br />
(757)322-4817<br />
Order No.: 0039<br />
I<br />
PrVJect No.:<br />
785143<br />
RAC CM:<br />
(757)396-5121<br />
Greg Hedley<br />
Project Name: Monitoring Well Abandonment<br />
Hedlevqs@efdlant.navfac.navv.mil ext’ 383<br />
Project Location: MCB Camp Lejeune, NC<br />
Project Controls Manager:<br />
Linda Barberousse<br />
(757)363-7190<br />
Project Manager: James A. Dunn, Jr., P.E.<br />
Lbarberousse@theitnrouo.com-<br />
Project<br />
Description:<br />
Plug and properly abandon monitoring wells at various locations<br />
throughout Camp Lejeune.<br />
Contract Files<br />
Scheduled Web Site Postinn Date:<br />
November 22,200O<br />
ROICC: Brent Rowse<br />
Original Contract Start Date:<br />
Original Contract Completion Date:<br />
Current Contract Completion Date:<br />
O&M Completion Date:<br />
Current Projected Completion Date:<br />
A letter requesting an extension in the Period of Performance<br />
Current TO Ceiling:<br />
Total $ to Date:<br />
Remaining Funds:<br />
Estimated Report Period:<br />
Forecast @ Completion:<br />
37,819.OO<br />
11,267.OO<br />
26,5x52.00<br />
5,006.OO<br />
37,749.oo<br />
37 800.00<br />
None<br />
None<br />
Orig Monitoring Well Abandonment. 08/01199 09/30/00 $37,819.00 $1,518.00 $39,337.OC<br />
Totals 1 $37,819.00 1 $1,518.00 1 $39,337.OC<br />
Approved by: 40dfih Attachments: ;~r;;$s,“e,p,o,rt<br />
Roland Moreau, P.E.<br />
Program Manager
IT COIpOratiOn<br />
START DATE 01 JAh<br />
FIN DATE OSJANOI<br />
PAGE NO. 1<br />
DATE<br />
OSNOVOO<br />
performance<br />
Report<br />
WBS<br />
C0de<br />
Description<br />
On’<br />
Bud<br />
Qnt<br />
Qnt<br />
Rev<br />
CW<br />
ant<br />
Task<br />
Unit<br />
Ins Task orlg. 0 current<br />
Qnt % Budg Rev./ Budg.<br />
Comp $ Adjust $<br />
EanWd Actual ETC Forecast Variance Variance % Physl<br />
$ t CPI At from from Of %<br />
ToDate Comp. Org. Bud Cur. Bud Proj Comp<br />
01001000 Mobe Canstructiin Equip 100 0 1w 56 45 45<br />
01003000 Submittaldlmplementatian ml 0 loo % 50 50<br />
02004000 Monitoring Wells ID3 0 loo % 45 45<br />
21 w4000 Demob Construct Equip 1W 0 loo % 0 0<br />
66666666 <strong>2000</strong> Restrududng Costs 100 0 loo % 0 0<br />
9wooooo FUel 100 0 IW % 0 0<br />
99001000 Supervision/Management 1W 0 lco % 70 70<br />
99004000 Engineering 100 0 la, % 0 0<br />
99005ow Purchasing Assistance lco 0 ltx % 45 45<br />
99016000 Per Diem ICC 0 100 % 45 45<br />
2016<br />
15301<br />
2114<br />
0<br />
710<br />
693<br />
3008<br />
234<br />
1924<br />
0 7399 3330 529 0.16 5870 6399 -law) -loco 19.6 8.8<br />
0 2016 1008 0 0.00 1016 1016 -ICC0 -ICC0 5.3 2.7<br />
0 15301 6886 6875 1 .oo 9991 16866 1565 1565 40.5 10.2<br />
0 2114 0 0 0.00 2114 2114 0 0 5.6 00<br />
0 0 0 60 0.00 242 353 3x3 Z-3 0.0 0.0<br />
0 710 0 46 0.00 6% 710 0 0 1.9 0.0<br />
0 m 627 2094 3.34 818 2912 2016 2016 2.4 1.7<br />
0 3008 0 0 0.00 2470 2478 -530 -530 8.0 0.0<br />
0 234 153 101 0.96 133 234 0 0 0.6 0.3<br />
0 1924 866 319 0.37 1000 1319 -605 -605 5.1 2.3<br />
9909<strong>2000</strong> Equipment 1CO 0 loo % 45 45<br />
4217 0 4217 1898 1243 0.65 2155 3398 -819 -919 11.1 5.0<br />
37819 0 37819 14719 11267 0.77 26482 37749 -70 -70 100.0 38.9<br />
37819 0 37819 14719 11267 0.77 26482 37749 -70 -70 100.0 38.9
Work r<br />
cfive Log<br />
Monitoring Well Abandonment<br />
Task Order: 39<br />
Project Number: 785143<br />
Costs are a Rough Order of Magnitude (ROM). It is not actual cost, nor is it a final change request value.<br />
1/10/00<br />
Impacts<br />
(TD)OOl SG l/6/00<br />
(TD)002 SG 9/l 3100<br />
l/6/00<br />
9i13lOO<br />
A<br />
A<br />
N/A Abandon 4 monitoring wells at Sites 9 and 63 30 N $3,675<br />
N/A Abandon 34 monitoring wells at Site TC 2455, six at BB-71 and eleven at Bldg 21. 30 N $8,500<br />
Chanae Tvoe:<br />
TD - Technical Directive<br />
SG - Scope Growth<br />
SR - Scope Reduction<br />
Status:<br />
A - Approved<br />
P - Pending<br />
R - Rejected<br />
W-Withdrawn<br />
Page1
MONTHLY PROGRESS REPORT - SHORT FORM<br />
Report Dates: October 1, <strong>2000</strong> to October 31,ZOOO Hard Copies Distributed to:<br />
Contract No.: N62470-97-D-5000 COTR:<br />
Karen Wilson (757)322-4817<br />
Order No.: 0058 W~lsonke@efcilant.navfac.navv.mil<br />
PI ,ect No.: 808021<br />
Project Name: Basewide AFVR Activities<br />
Project<br />
Project<br />
Project<br />
Location:<br />
Manager:<br />
Description:<br />
MCB Camp Lejeune, NC<br />
James A. Dunn, Jr., P.E.<br />
Perform basewide AFVR activities at Marine Corps Air Station New<br />
Riverand Marine Corps Base,Camp Lejeune.<br />
RAC CM:<br />
(757)396-5121<br />
Greg Hedley<br />
Hedlevos@,efdlant.navfac.navv.mil ext’ 383<br />
Project Controls Manager:<br />
Linda Barberousse<br />
Lbarberousse@theitoroup.com<br />
Contract Files<br />
Scheduled Web Site Postinn Date:<br />
November 22,200O<br />
ROICC: Brent Rowse<br />
(757)363-7190<br />
Original Contract Start Date: 04/25/00<br />
Original Contract Completion Date: 05/12/00<br />
Current Contract Completion Date: 05/31/01<br />
O&M Completion Date: 05/31/01<br />
Current Projected Completion Date: 05/31/01<br />
Current TO Ceiling:<br />
Total $ to Date:<br />
Remaining Funds:<br />
Estimated Report Period:<br />
Forecast @ Completion:<br />
Previous Period Forecast @ Completion:<br />
25,983.OO<br />
421.00<br />
25,562.OO<br />
0.00<br />
25,975.oo<br />
25,975.oo<br />
None<br />
None<br />
Orig<br />
1<br />
Prepare Fee Proposal for Basewide<br />
AFVR Activities<br />
Basewide AFVR Activities at New<br />
River and Camp Lejeune<br />
04/25/00 05/12/00 $2,731.00 $169.00 $2,9OO.O<br />
05/23/00 05/31/01 $23,252.00 $1,145.00 $24,397.OC<br />
Totals 1 $25,983.00 1 $1,314.00 / $27,297.OC<br />
Approved by: QO& nlmedL-- Attachments: Pe=f$m;;rn&Grt<br />
Roland Moreau, P.E.<br />
Program Manager
IT Corporation<br />
START DATE OIJA.<br />
FIN DATE 31MAYOl’<br />
Order 58 - 808021 PAGE NO. 1<br />
DATA DATE<br />
03NOVOC<br />
WBS<br />
Code<br />
Description<br />
Ott<br />
Bud<br />
ant<br />
ant<br />
RW<br />
Cur<br />
clnt<br />
Task<br />
Unit<br />
Ins<br />
Qnt<br />
Task olig. s Current<br />
% Budg RW.l Budg.<br />
Comp S Adjust $<br />
Earned Achral ETC Forecast VWtWW Valiance % Physl<br />
t S CPI At from from of %<br />
ToDate Comp. Org. Bud Cur. Bud Proj camp<br />
40000000 AFVR IW 0 loI % 0 0 20440 0 20440 0 0 0.00 20440 20440 0 0 70.7 0.0<br />
66666666 2WORest1wtufingCosts 103 0 IW % 0 0 0 0 0 0 2 0.00 1141 439 -439 439 0.0 0.0<br />
98016000 Per Diem ICYI 0 100 % 0 0 2812 0 2812 0 0 0.00 2812 2812 0 0 10.8 0.0<br />
99w0100<br />
Admin&Support<br />
lo0 0 103 % 16 16 2731 0 2731 437 420 0.96 2743 3163 432 432 10.5 1.7<br />
25983 0 25983 437 421 0.96 28554 26975 -8 -8 100.0 1.7<br />
25983 0 25983 437 421 0.96 25554 28975 -8 -8 100.0 1.7
cfive Log<br />
Monitoring Well Abandonment<br />
Task Order: 58<br />
Project Number: 808021<br />
Costs are a Rough Order of Magnitude (ROM). It is not actual cost, nor is it a final change request value.<br />
1 /l o/o0<br />
Impacts<br />
(TD)OOl SG 6/20/00<br />
(TD)002 SG 6127100<br />
(TD)003 SG 8/30/00<br />
6126100 A<br />
6i28lOO A<br />
8i3OlOO A<br />
N/A Perform AFVR event on monitoring well MW-1 1 at Berkeley Manor 820 5 N $400<br />
N/A Perform AFVR activities at H-28 on the source well USTH28-MW-I I. 15 N $1,000<br />
NIA Perform AFVR activities at A-47-5 (Site 73) on monitoring well 73-MW-14. 15 N $1,000<br />
Chanae Tvpe:<br />
TD - Technical Directive<br />
SG - Scope Growth<br />
SR - Scope Reduction<br />
Status:<br />
A - Approved<br />
P - Pending<br />
R - Rejected<br />
W - Withdrawn<br />
Page 1