n Building 1613 Cumulative VOC Pounds Removed 2g,&JlJ , 29.600 29,400 p” 29,200 : n 29,000 26,600 26.600 26,400 Now99 Dee-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 act-00 Past 12 Months / -Cumulative Pounds Removed Task Order 11 - Project 920704 Camp Lejeune MCB, NC October 31.<strong>2000</strong>
MONTHLY PROGRESS REPORT - SHORT FORM Report Dates: October 1, <strong>2000</strong> to October 31, <strong>2000</strong> Hard Copies Distributed to: Contract No.: N62470-97-D-5000 COTR: Karen Wilson (757)322-4817 Order No.: 0014 Wilsonke@efdlant.navfac.navv.mil I Pr-,ect No.: 920764 RAC CM: (757)396-5121 Greg Hedley Project Name: Hadnot Point Fuel Farm Hedlevqs@efdlant.navfac.navy.mil ext. 383 Project Location: MCB Camp Lejeune, NC Project Controls Manager: Linda Barberousse (757)363-7190 Project Manager: James A. Dunn, Jr., P.E. Lbarberousse@theitqroup.com Project Description: Contract Files Construction and Operation of Biosparging, Air Sparging, and Soil Vapor Extraction Systems with aggressive fluid vapor recovery at Hadnot Point Fuel Farm/Building 1115. Scheduled Web Site Posting Date: Original Contract Start Date: Original Contract Completion Date: Current Contract Completion Date: O&M Completion Date: Current Projected Completion Date: Current TO Ceiling: Total $ to Date: Remaining Funds: Estimated Report Period: Forecast @ Completion: 2,826,904.00 2,012,115.00 814,789.OO 70,696.OO 2,822,147.00 Ht a i extraction wells recovered 61 gals. of product. Normal O&M of the SE system resulted in recovery of 52,227 Ibs. of hydrocarbons. Continued daily gauging of wells and Buildings 1101 and 1068 at HPFF and twice weekly checking of all twelve buildings. Re-caulked buildings 1108, 1115 and 1068 to close potential vapor pathways. Conducted 6 AFVR events on various Current schedule attached. None. Orig Provide RA for Hadnot Point Fuel Farm bldg. 1115, Camp Lejeune, NC. 06/30/98 07122199 $1,483,522.00 $58,413.00 $1,541,935.00 1 Additional 12 months of O&M through 8/31/00 05128199 08/31 /OO $214,989.00 $11,525.00 $226514.00 2 Install trench at East end of Bldg 1101 and install blower. 12129199 08/01 /OO $0.00 $0.00 $0.00 3 Scope Change - Completely replace all O&M for the current period 01/l 3/00 08/01 /OO $0.00 $0.00 $0.00 Prep Work Plans to provide trenching around 4 Bldg. 1101 and trenching at Wells HPFF-28 01/28/00 08/01 /OO $7,122 $431 .oo !§7,553.00 -,m and MW-15 Exploratory Excavation around MW HPFF-28 5 and MW-15 to attempt to determine the source of free product. Conduct SVE 02/22/00 08/01 /OO $80,848.00 $3,166.00 $84,014.00 influence testing program 6 Seal Bldg. 1101 and conduct test of biosparge 03/01/00 08/01 /OO $28,004.00 $1,219.00 $29,223.00