Prior period 0 & M completion date<br />
Current period 0 & M completion date<br />
:F-<br />
0.0 NON-COMPLIANCE CHECK OFF LIST<br />
No non-compliance issues have been associated with this task order.<br />
09/30/01<br />
09/30/01<br />
7.0 WASTE MATERIALS TRACKING<br />
No waste materials were generated during the month.<br />
8.0 GOVERNMENT MATERIALS TRACKING<br />
All government owned materials (trucks, offices and equipment) have been properly documented and are being<br />
tracked.<br />
9.0 MODIFICATION LOG<br />
2<br />
3<br />
4<br />
5<br />
6<br />
Description<br />
O&M at Treatment<br />
System and provide<br />
Quarterly Reports of<br />
Status for 29 weeks past<br />
current expiration<br />
Provide continued O&M<br />
for an additional 23 weeks<br />
and relocate to rear of lot<br />
203.<br />
O&M Extension through<br />
09/3 o/o0<br />
Delete all cost associated<br />
with installing new<br />
telephone cable along<br />
Piney Green Rd.<br />
Demolish Building TP-<br />
45 1 and TP-463<br />
Continue O&M Activities<br />
for additional 12 months<br />
Install 750’ of fence to<br />
separate the front from the<br />
rear of Lot 203<br />
Award Contract<br />
Date End Date Cost Value Award Fee<br />
03/10/99 1 O/20/99 $568,061 .OO $25,454.00<br />
05/l 3199 N/A $0.00 $0.00<br />
Total Mod<br />
Value<br />
$593,515.00<br />
$0.00<br />
06/03/99 06/30/00 $973,545.00 $45,291 .OO $1,018,836.33<br />
09/03/99 06/30/00 -$25,121 .OO -$979.00 -$26,100.00<br />
02/l 2/00 06/30/00 $191,582.00<br />
06/ 16/00 04/30/o 1 $1,322,055.00<br />
06/ .6/00<br />
$9,590.00<br />
-<br />
$7,667.00<br />
-<br />
$64,692.00<br />
-<br />
$311.00<br />
-<br />
$199,249.00<br />
$1,386,747.00<br />
$9,901 .oo<br />
L<br />
10.0 WORK DIRECTIVE LOG<br />
he current work directive log is attached.<br />
Totals<br />
$3.039.712.00 $142,436.00 $3,182,148.33<br />
OHM Project 780790<br />
Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />
Page 3 of 4<br />
October 3 1,200O