cfive Log<br />

Hadnot Point Fiel Farm/Building 1115<br />

Task Order: 14<br />

Project Number: 920764<br />

1 1 1 SG 1116/98 ll/%l98 A N/A Free Product Investigation 3 N 1 $5,000 1<br />

2 SG 1219198 1219198 A N/A Concrete Slab Building 1111 3 IV 1 .-$O,UUII<br />

3 SC, -- 17/9/98 .- .-.-- 12/9ws .-- -.-- A N/A T&D of Free Product Produced During AFVR Events. 90 N 1 $2,5OC<br />

t<br />

-- -_-<br />

4 SG 5/19/99 5/19/99 i N/A IAbandon Well 11-15-16 1 10 1 N 1 12,500<br />

TDI SG 717199 7l7i99 A N/A Ilnvcxtinata .“.““..J’.” n&-w “““. rnmnlaintc ““...v*“....” RIlildinn ““..“...= 1101 . .-. I 30 I N 1 $5,000<br />

TD2 SG 12/16/99 N/A R 12/17/9Q install Trench alongside east wall of Building 1101 - will be awarded as a Modification 45 N $551000<br />

(-I'D)003 SG 114/00 N/A R N/A Apply acrylic caulking to cracks in floor of Building 1101 7 N $2,500<br />

7 hl a232 nnn<br />

(TD)004 SG 115100 IWO0 A l/5/00 Install 3 new monitoring wells at we-’ SI ena --’ or -< cwatng ---“_l’-- *rnr I IV I<br />

~“,“YY<br />

(TD)005 SG 1112100 N/A R N/A Install trench around remainder of LU,,u,lly 2, #a&VI 11<br />

I Iv l-l1 a<br />

;0 ii TBoi -I<br />

(To)006 SG 6l2OlOO N/A R N/A Additional Fuel Line Investigation near Ash Street and Building I( 1115 I I .-<br />

!i N !%I _. o.ooc .,_-<br />

(TD)007 SG 6/20/00 N/A R N/A Investigate purchase of monitoring equipment for Building 1101 30 i $3,500)<br />

(-l-D)008 sx Cil3nlnn P N/A Additional fingerprinting and soil analyses 5 N $1,000<br />

WV “.““1””<br />

.--.<br />

I<br />

I<br />

(TD)OOQ SC, _- l nI75lOO -.-. 1 Q/26/00 1 A 1 NiA IAdd Bldo - .” 1068 ___ to ~~ dailv , samoling , list. Procure readings from suspect sampling points. 30 N $3,000<br />

VR-09 TD 9/2L.,- slnn , I Ql28Inn -.- -,-- I , A 1 , N/A ..~ ,---. /Cost reduction -..-._ for analvses , I of benzene from coconut charcoal tubes due to favorable pricing. 90 N ($6,345)<br />

(TD)OlO TD iommn I I nl23mn I A I N/A lfie-caulk ’ ioints in buik-tinnc 1 IX8 11 IVI am-i I 115 I 3 I N I $1.550 I<br />

_- -. --. - -<br />

.“‘~Y l”““, I I”” I..” . I .”<br />

.~~<br />

I ~~ ~~ J-<br />

I x-I I ii16100 I NIA I Procure a samele from soil stockpile alona drainage ditch and analyze for disposal criteria I 10 I N 1 $550 I<br />

”<br />

Chanae Type:<br />

TD - Technical Directive<br />

SG - Scope Growth<br />

SR - Scope Reduction<br />

Status:<br />

A - Approved<br />

P - Pending<br />

R - Rejected<br />

W-Withdrawn<br />

Page 1