dive Log<br />

Continued O&b - One Year<br />

Task Order: 33<br />

Project Number: 780790<br />

Costs are a Rough Order of Magnitude (ROM). It is not actual cost, nor is it a final change request value.<br />

, 11/10/00<br />

3 impacts<br />

WDI TD 4128199 4128199 A N/A Relocate Offices 180 N $100,000<br />

(WD)OOl SG 7127199 7127199 A N/A Plug &Abandon Wells 360 N $5,000<br />

(TD)OOl SG 8/I 7199 8117199 A N/A Increase Size of Waterline 15 N $8,000<br />

(TD)004 SG 1 on199 10/20/99 A N/A Fencing Repairs 30 N $23,000<br />

(TD)005 TD 1 Ill o/99 II/10199 A N/A Procure groundwater samples from all monitoring wells and adjacent to remedial system. 30 N $12,000<br />

(TD)006 TD 1 Ill 0199 ll/lOl99 A N/A Procure groundwater samples from all monitoring wells and adjacent to remedial system. 30 N $1,500<br />

(TD)007 TD 11/10/99 II/IO/99 A N/A Remove debris (concertina wire and shingles)and install signs. 30 N $12,700<br />

(TD)008 TD 1 O/l 9100 10/20/00 A N/A ‘rovide drums for NFESC subcontractor at Site 88 (Building 25) and analyze contents for dispos; 60 N $8,000<br />

Chanae Tvpe:<br />

TD - Technical Directive<br />

SG - Scope Growth<br />

SR - Scope Reduction<br />

Status<br />

A-Approved<br />

P - Pending<br />

R - Rejected<br />

W-Withdrawn<br />