gallons of collected stormwater from Site 89 (see detailed operating <strong>report</strong> attached) [WBS 21000000 &<br />

21500000].<br />

2. Operated and maintained the Hadnot Point North Plant for the month experiencing 12 hours of<br />

downtime. Changed the filters 11 times and performed <strong>monthly</strong> maintenance on the plant. Treated a<br />

total of 199,299 gallons of groundwater and 16,620 gallons of produced fluids from AFVR events, SVE<br />

systems and Site 54 (see detailed operating <strong>report</strong> attached) [WBS <strong>2000</strong>0000 & 20500000].<br />

3. Operation and maintenance of the air sparging/SVE units at BM 820 and TT 2477/78 was conducted<br />

under this T.O. Blower unit at TT 2477 spun a shaft and the unit was repaired onsite. Total downtime<br />

was two weeks. (See detailed operating <strong>report</strong> attached.)[WBS Codes 9100000 and 91500000]<br />

4. Conducted background sampling of soils and potable water for closure of Buildings TP 452 and TP 463.<br />

[WBS Code 50000000]<br />

5. Continued preparation of the final design of the system expansion at TT 2477 to remediate the area of<br />

contamination associated with Building TT 2453. [WBS Code 91401000].<br />

3.0 WORK PLANNED<br />

During the month of November <strong>2000</strong>, OHM is scheduled to perform the following:<br />

1. Conduct normal operation and maintenance of the Lot 203 and North Plant systems and the operation<br />

and maintenance of the BM 820 and TT 2477/78 air sparge/SVE systems.<br />

2. Continue preparatory activities for the RCRA facility closures.<br />

3. Submit results of the activities conducted at TT 2477.<br />

PROBLEMS AND SOLUTIONS<br />

,A0<br />

luring the month no new problems arose and all previous issues have been satisfactorily resolved.<br />

5.0 COST SCHEDULE SUMMARY<br />

Cost Summarv<br />

The following<br />

attached.<br />

is a summary of the costs associated with this task order.<br />

A detailed performance <strong>report</strong> is<br />

T.O. ceiling amount (without fee)<br />

Approximate cost through October <strong>2000</strong><br />

Approximate cost for October <strong>2000</strong><br />

Remaining funds<br />

Estimated cost to complete<br />

Current estimated cost at completion<br />

Prior period estimate at complete<br />

Physical % complete<br />

Financial % complete<br />

3,039,712.00<br />

1,528,255.00<br />

115,468.OO<br />

1,511,457.00<br />

1,508,161.00<br />

3,036,416.00<br />

3,037,171.00<br />

55.5<br />

50.3<br />

We expect that the project will be completed within budget.<br />

hedule Summarv<br />

Original contract completion date<br />

Current contract completion date<br />

06/30/00<br />

09/30/01<br />

OHM Project 780790<br />

Operate and Maintain Treatment System - MCB Camp Lejeune, NC<br />

Page 2 of4<br />

October 3 1,200O