LA<br />
IV RAC FIELD FORM<br />
Contract No, N62470-97-D-5000<br />
Task Order No. 0014<br />
Title/Location Additional Caulking<br />
Buildings 1068, 108 and 1115<br />
DISTRIBUTION:<br />
x<br />
- -- ROrCC<br />
-x<br />
x- RPM<br />
-- x COTR<br />
OTHER: E MD<br />
CONTRACTING OFFICEFUSPECIALIST (TD’S)<br />
FILE: 920764<br />
Form No. (TD) 090 Data: Oct. 23,ZOOO Respond ‘NLT: NA<br />
Initiated By: XX Navy 0 C0ntr6ct0r 0 Other<br />
X Technical Direction c1 RF1 0 Variance Request 0 Overtime Authorization<br />
Descrlptlon<br />
(Include location 8 attachments If necessary):<br />
Re-caulk joints in Buildings 1068,1108 and 1115 6s Per the &ached <strong>report</strong>.<br />
Drawing Ref:<br />
1 Sp6c.qRef.<br />
Explanation/Recommendation: _ -<br />
Work to be petformed using existing funding in the TO ’<br />
Fee Bearing<br />
xx Yes No<br />
Associated Cost: $1,550.00<br />
WBS Code6 Affsctod: 40500000<br />
New<br />
Existing xx<br />
Work to be pe!formed using existing funding within the<br />
task order.<br />
/r<br />
w Yes H No<br />
Schedule lmpoct (assume response by ‘NLT date)<br />
Norm<br />
0 Increase in Time<br />
ODecrease in Time<br />
Appro%imate Calendar Days: 3<br />
I<br />
Contractor:<br />
Date<br />
Site Representative: \ Fi<br />
met Managec James A. Dunn, Jr, Originator) !/ Oct. 23,ZODO<br />
\I V<br />
Reviewer Comments, In&l RFI Respon66:<br />
Task Order Modification to Follow (contract action) XX No Tesk Order Modification Required