LA<br />

IV RAC FIELD FORM<br />

Contract No, N62470-97-D-5000<br />

Task Order No. 0014<br />

Title/Location Additional Caulking<br />

Buildings 1068, 108 and 1115<br />

DISTRIBUTION:<br />

x<br />

- -- ROrCC<br />

-x<br />

x- RPM<br />

-- x COTR<br />

OTHER: E MD<br />

CONTRACTING OFFICEFUSPECIALIST (TD’S)<br />

FILE: 920764<br />

Form No. (TD) 090 Data: Oct. 23,ZOOO Respond ‘NLT: NA<br />

Initiated By: XX Navy 0 C0ntr6ct0r 0 Other<br />

X Technical Direction c1 RF1 0 Variance Request 0 Overtime Authorization<br />

Descrlptlon<br />

(Include location 8 attachments If necessary):<br />

Re-caulk joints in Buildings 1068,1108 and 1115 6s Per the &ached <strong>report</strong>.<br />

Drawing Ref:<br />

1 Sp6c.qRef.<br />

Explanation/Recommendation: _ -<br />

Work to be petformed using existing funding in the TO ’<br />

Fee Bearing<br />

xx Yes No<br />

Associated Cost: $1,550.00<br />

WBS Code6 Affsctod: 40500000<br />

New<br />

Existing xx<br />

Work to be pe!formed using existing funding within the<br />

task order.<br />

/r<br />

w Yes H No<br />

Schedule lmpoct (assume response by ‘NLT date)<br />

Norm<br />

0 Increase in Time<br />

ODecrease in Time<br />

Appro%imate Calendar Days: 3<br />

I<br />

Contractor:<br />

Date<br />

Site Representative: \ Fi<br />

met Managec James A. Dunn, Jr, Originator) !/ Oct. 23,ZODO<br />

\I V<br />

Reviewer Comments, In&l RFI Respon66:<br />

Task Order Modification to Follow (contract action) XX No Tesk Order Modification Required