located at Hadnot Pt. Fuel Farm and Bldg<br />

9 I Continue O&M for 12 months 1 05/12/00 / 04/30/01 / $559,288.00 1 $25,381.00 / $584,669.00<br />

10 / O&M Activities 1 09/02/00 / 04/30/01 1 $17,997.00 1 $1,103.00 1 $19,100.00<br />

11<br />

Event Monitoring on three occasions in Bldg.<br />

1101,1104,1114.<br />

09/28/00 04/30/01 $47,946.00 $l,660y<br />

I I I I I<br />

Totals $2,826,904.00 $119,218.00 $2,946,122.00<br />

Approved<br />

by:<br />

Roland Moreau, P.E.<br />

Program Manager<br />

Attachments: Performance Report (2)<br />

Cost Performance Curve (1)<br />

Schedule (1)<br />

Site Data (9)<br />

Work Directive Log (1)<br />

LANTDIV RAC Field Form (2)