located at Hadnot Pt. Fuel Farm and Bldg<br />
9 I Continue O&M for 12 months 1 05/12/00 / 04/30/01 / $559,288.00 1 $25,381.00 / $584,669.00<br />
10 / O&M Activities 1 09/02/00 / 04/30/01 1 $17,997.00 1 $1,103.00 1 $19,100.00<br />
11<br />
Event Monitoring on three occasions in Bldg.<br />
1101,1104,1114.<br />
09/28/00 04/30/01 $47,946.00 $l,660y<br />
I I I I I<br />
Totals $2,826,904.00 $119,218.00 $2,946,122.00<br />
Approved<br />
by:<br />
Roland Moreau, P.E.<br />
Program Manager<br />
Attachments: Performance Report (2)<br />
Cost Performance Curve (1)<br />
Schedule (1)<br />
Site Data (9)<br />
Work Directive Log (1)<br />
LANTDIV RAC Field Form (2)