Operational Experience from AXE 10<br />
in Sodertalje<br />
Sten Rimbleus<br />
The Swedish Tele<strong>com</strong>munications Administration has operational experience of<br />
SPC exchanges which goes back to 1968, when the first AKE 12 exchange was<br />
put into operation in Tumba near Stockholm. Since then a total of three AKE 13<br />
exchanges have been installed in Stockholm and Gothenburg. The operational<br />
experience from these has been good, as has been reported in previous articles in<br />
Ericsson Review* ~ 3 . The present article describes the Swedish Tele<strong>com</strong>munications<br />
Administration's field trial and eight months' operational experience from a new<br />
generation of SPC exchanges, namely from the first AXE 10 exchange in Sodertalje.<br />
The installation has already been described in a previous issue of Ericsson<br />
Review 4 .<br />
UDC 621.395.722<br />
681.3.065<br />
The Sodertalje exchange<br />
Sodertalje is the zone centre for the Sodertalje<br />
trunk code area. A number of<br />
group centres and terminal exchanges<br />
are connected to the exchange. There<br />
are direct routes to Stockholm and nearby<br />
smaller <strong>com</strong>munities and to a number<br />
of other cities in the country, of<br />
which Gothenburg and Malmo are the<br />
largest, fig. 1.<br />
On March 1st, 1977 the new 3000-line<br />
AXE 10 exchange in Sodertalje was taken<br />
into service. It then took over the<br />
corresponding number of lines from the<br />
existing AGF exchange, which served<br />
approximately 32 000 subscribers. This<br />
was the first step in a successive replacement<br />
of the AGF exchange (500-<br />
line selectors) by AXE 10.<br />
The new exchange was put into service<br />
with close cooperation between manufacturer<br />
and customer, which has to a<br />
great extent contributed to a successful<br />
result.<br />
The Tele<strong>com</strong>munications<br />
Administration's field trial<br />
Objectives<br />
Before the AXE 10 exchange was put<br />
into operation the Administration's staff<br />
carried out a 2-week continuous field<br />
trial in order to check<br />
Fig. 1<br />
Sodertalje trunk code area with some of the<br />
larger routes<br />
— Route<br />
^ ^ High usage route