ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

122. Do the custom RICEFW's use the 'object-oriented' syntax and Yes<br />

coding, e.g. instead of the 'header line' and 'occurs' statements,<br />

has it been replaced it with 'table of' type statements Also,<br />

when an internal table is read, is the LOOP AT...INTO or READ<br />

TABLE....INTO statements used etc.<br />

123. Are the custom RICEFW's unicode enabled Yes<br />

124. Did <strong>LACCD</strong> document the repairs/modifications they made to<br />

standard SAP code<br />

125. Is it safe to assume that <strong>LACCD</strong> will be responsible for all HP<br />

vendor management and sizing for the SAP landscape<br />

126.<br />

Is it possible to have an extension on the due date of the RFP<br />

127. If an extension cannot be granted, can the printed copy arrive<br />

after 1/30/2013<br />

128.<br />

Can changes be made to the SOW that <strong>LACCD</strong> provided<br />

129. When did you start using SAP ( Go-live date) 2002<br />

Yes<br />

The hardware has been already installed. But recommendation<br />

for upgrade as part of the SOW is in scope, if needed.<br />

If an extension is warranted, the District will issue that notice to<br />

all bidders. At this time, an extension is not anticipated<br />

<strong>No</strong>. All documents must be received by the proposal due date<br />

and time (2:00 PM 1/30/13)<br />

130. Do you use any Country Version / Industry Solutions United States and Public Sector ISU<br />

131. What are the SAP modules in use See SOW and answer above.<br />

132. User Information (Please provide the details for Production See answers above.<br />

Server)<br />

133. Can you provide the DB size for all the systems to be 650 GB for each D/B see above.<br />

upgraded<br />

134. What are the transports on a weekly basis <strong>LACCD</strong> does general system updates bi-monthly.<br />

135. Are you using SAP Data Archiving <strong>No</strong><br />

136. What are the types of Front-end Usage (Sapgui or Webgui)<br />

What version<br />

137. Database used Which version See above.<br />

<strong>No</strong>.<br />

SAP GUI and Portal. GUI 6.40-7.30. Portal is EP 6.0 and I.E<br />

8.0<br />

138. If the landscape is using heterogeneous databases, please<br />

specify (DEV, QAS, PRD)<br />

139. Is your current landscape HA Cluster or OS/DB Cluster Please<br />

give details.<br />

Only one D/B is used. Oracle.D/B<br />

<strong>No</strong>. See answer above.<br />