ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />
<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />
68.<br />
See the RFP and SOW. Functional Test cases outside of HR<br />
Please confirm that test cases will be developed by <strong>LACCD</strong><br />
Payroll and security will be completed for <strong>LACCD</strong> for the most<br />
personnel<br />
part.<br />
69.<br />
We do not gather that information at this time.<br />
How many end to end business process scenarios/test cases<br />
70. Avg no of unique transactions (unique field flow/screen flow) in<br />
each test case<br />
71.<br />
How many data variations in each test case<br />
We do not gather that information at this time.<br />
We do not have that metric. The test cases are very detailed.<br />
72. How many Security Roles <strong>No</strong>t enough information is provided for the District to answer.<br />
73. Is testing automation in scope If yes, do you own HP QTP or<br />
any other test automation tool<br />
74. How many golden transactions/test cases to be tested for<br />
performance testing<br />
75.<br />
Number of virtual users<br />
76. Do you own HP Load Runner/Performance Center with SAP<br />
protocol<br />
77. You have mentioned in your Statement of Work document,<br />
section #4 last paragraph, that you have already procured the<br />
necessary hardware for the upgrade. What hardware have you<br />
procured and is it IA64 – Itanium platform.<br />
78. What is the downtime window for Production (Maximum<br />
possible allowed) and are there any additional restrictions on<br />
downtime<br />
79. Do you have SAP Solution Manager implemented in the<br />
landscape If yes, please confirm the version and whether<br />
maintenance optimizer is used in the landscape; in addition to<br />
that, please provide the support package details.<br />
80. Based on the typical restrictions (academic calendar), have you<br />
decided upon the go-live date (or) Are there any restrictions to<br />
go-live before / after any specific date<br />
81. What are the current pain points with the existing infrastructure,<br />
technical, functional, security, etc. Please provide a detailed<br />
view by module or business process or technical issues.<br />
See RFP. QTP and HP QC are the <strong>LACCD</strong> main testing tools<br />
used to certify quality.<br />
To be determined as part of the upgrade. See modules in use<br />
at <strong>LACCD</strong> as a guide.<br />
All users operate on virtual machines.<br />
<strong>No</strong><br />
Yes, have procured and installed the HW. HP Blades BL870. It<br />
is Itanium.<br />
We need to work within the academic calendar for taking the<br />
system off line. The method for the upgrade is minimizing<br />
down time.<br />
See answer above.<br />
To be determined as part of the blue print. But we do need to<br />
take into account the academic calendar year.<br />
The District needs to move from one release to another. This is<br />
a technical upgrade.<br />