28.01.2015 Views

Download floresville-master-plan-draft.pdf - Wilson County News

Download floresville-master-plan-draft.pdf - Wilson County News

Download floresville-master-plan-draft.pdf - Wilson County News

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY OF FLORESVILLE MASTER PLAN<br />

9,000<br />

8,500<br />

Projected Wastewater Effluent Flow<br />

City of Floresville<br />

900,000<br />

850,000<br />

Population<br />

8,000<br />

7,500<br />

7,000<br />

6,500<br />

6,000<br />

5,500<br />

5,000<br />

800,000<br />

750,000<br />

700,000<br />

650,000<br />

600,000<br />

550,000<br />

500,000<br />

Average Daily Flow (gpd)<br />

Census<br />

Interpolated Population<br />

Population Projection<br />

Historical Annual ADF<br />

Projected Annual ADF<br />

Average Flow Trend<br />

Population Projection Source: City of Floresville 2012 Master Plan<br />

Projected Average Daily Flow Source: Assumed 92 gpd per capita<br />

1,100,000<br />

Existing Permit Capacity Projections<br />

City of Floresville<br />

1,000,000<br />

Historical Annual ADF<br />

Average Flow Trend*<br />

Flow (gpd)<br />

900,000<br />

800,000<br />

700,000<br />

600,000<br />

500,000<br />

Trend Peak<br />

Projected Average ADF<br />

Projected Peak 3-Month ADF<br />

Existing Permitted Flow<br />

75% Existing Permitted Flow<br />

(Commence Expansion Planning)<br />

90% Existing Permitted Flow<br />

(Expansion Authorization Deadline)<br />

400,000<br />

*Average Flow Trend is based soley on historical data and does not account for expected population increases due to mining development.<br />

**Expected Peaks based on Average Flow with a three-month peaking factor of 1.21.<br />

Page 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!