28.01.2015 Views

Download floresville-master-plan-draft.pdf - Wilson County News

Download floresville-master-plan-draft.pdf - Wilson County News

Download floresville-master-plan-draft.pdf - Wilson County News

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY OF FLORESVILLE MASTER PLAN<br />

Over the course of the development of this <strong>master</strong> <strong>plan</strong>, the sewer line beneath Pecan Street was<br />

reviewed. This line has been seriously compromised by tree roots which have permanently and<br />

irrevocably damaged a section of the line. This line should be assessed and properly mitigated. Ideally<br />

the correction of the deficiency should correspond with road maintenance on Pecan Street so as to<br />

minimize cost.<br />

Low Priority<br />

The remaining recommendations, all of which are lower priority are summarized in accordance with the<br />

infrastructure category in which they fall.<br />

1. Wastewater<br />

The Pajarito and FM97 lift stations should be expanded to support future growth. Also, a<br />

trailer mounted generator should be purchased to provide mobile power to keep lift<br />

stations and the <strong>plan</strong>t running in case of power failure.<br />

2. Parks<br />

Park facilities should be built behind the community center to fully utilize the site.<br />

Bathroom facilities at Pecan Park should be upgraded. As these bathrooms are in the<br />

floodplain two options remain: Making improvements of less than 50% of the cost of the<br />

building or elevating the structure. A pecan tree revitalization <strong>plan</strong> should be put in<br />

place at Pecan Park to ensure the trees continue to be there for generations. A privacy<br />

fence should be built in Canta Rana Park along the boundary with the WWTP. It would<br />

be beneficial to the community to work with SARA to develop and promote the Rancho<br />

de las Cabras National Historic Area. Finally opportunities to develop small parks in<br />

underserved areas should be sought as land and funding becomes available.<br />

3. Streets<br />

Begin repair work on streets as money is available. Phases have been split up into<br />

approximately 20,000 foot of road with the highest ranked streets at the top. The city<br />

should strive to repair at least this much if not more each year.<br />

4. Drainage<br />

o Have hydraulic analysis done on the area that starts at the intersection of 6 th and B<br />

street and runs to 5 th street and on 5 th street from B street to D street. Complete any<br />

reasonable design improvements found to reduce flooding. Many water crossings do<br />

not have guard rails. A study should be conducted to determine how many guard rails<br />

are needed and the costs associated with each. Then, guard rails should be installed as<br />

money is available.<br />

Page 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!