Develop a time stamping application in PlantStruxure? - Schneider ...
Develop a time stamping application in PlantStruxure? - Schneider ...
Develop a time stamping application in PlantStruxure? - Schneider ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2-Selection<br />
2.2.3. Select I/O architecture<br />
Three I/O architectures can be selected: local I/O, remote I/O and distributed I/O.<br />
Systems with local I/O can achieve high resolution <strong>time</strong> stamps. For remote I/O and<br />
distributed I/O, the <strong>time</strong> stamp resolution is limited by the PAC MAST task scan cycle.<br />
I/O architecture depends on the PAC platform. The follow<strong>in</strong>g table shows the I/O<br />
architectures for different PAC platforms.<br />
Table 2 Supported I/O architecture on each PAC platform<br />
Note: The local I/O architecture is not fully supported by Quantum hot standby.<br />
2.2.4. Select CPU task mode<br />
2.3. Solution list<br />
Three task modes can be selected: MAST, FAST and EVENT task modes. Only the<br />
local I/O architecture supports the FAST and EVENT tasks. If users select the remote<br />
I/O or distributed I/O, then the FAST task and EVENT task modes are not available,<br />
and the <strong>time</strong> stamp resolution is lower.<br />
Note:<br />
1. The EVENT task is only supported by the Quantum platform. The expert module<br />
reference is 140 HLI 340 00.<br />
2. Task mode is not considered <strong>in</strong> the <strong>time</strong> stamped by module method. In this case,<br />
the <strong>time</strong> <strong>stamp<strong>in</strong>g</strong> is dealt with <strong>in</strong> module and not <strong>in</strong> program. The task mode is only<br />
available <strong>in</strong> the program, not the module.<br />
Accord<strong>in</strong>g to the selection procedure, a number of solutions us<strong>in</strong>g <strong>Schneider</strong><br />
Electric’s <strong>PlantStruxure</strong> products are provided to help the user make a decision based<br />
on the <strong>application</strong> requirements. The follow<strong>in</strong>g list presents the most representative<br />
solutions for <strong>time</strong> <strong>stamp<strong>in</strong>g</strong> <strong>application</strong>s.<br />
17