2 11/5/03 - Friends of the Burlington Northern Railroad
2 11/5/03 - Friends of the Burlington Northern Railroad
2 11/5/03 - Friends of the Burlington Northern Railroad
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NORTHWEST DIVISION—No. 2—November 5, 20<strong>03</strong>—Lakeside Subdivision<br />
37<br />
occupied, The A Desk Yardmaster must be contacted to<br />
determine if <strong>the</strong> Remote Control Zone has been activated.<br />
Templin Terminals—This is a circular track (balloon)<br />
approximately 7200 feet in length. Cars may be set out going<br />
in ei<strong>the</strong>r direction. Electric locks are located at MP 62.59 and<br />
MP 62.86 for access. There are switch point derails located on<br />
<strong>the</strong> east and west turnout tracks between main line switches<br />
and inside crossover switches.<br />
Ritzville—When spotting <strong>the</strong> elevator do not leave any cars<br />
between Jefferson and Adams Streets (<strong>the</strong> two west<br />
crossings).<br />
All westbound trains on <strong>the</strong> siding at Ritzville, make sure <strong>the</strong><br />
gates are down before entering Columbia Street Crossing.<br />
Crew Switching at CFI Industries—All crews switching at<br />
CFI Industries at Tokio must be equipped with a half mask<br />
respirator (equipped with ammonia cartridges). This half mask<br />
may be worn with prescription glasses and must be worn<br />
when switching inside <strong>the</strong> gates <strong>of</strong> <strong>the</strong> plant.<br />
Any employee called for Trains LWAS8301, who has not been<br />
fitted for a respirator, must report to work one-half hour early,<br />
clean shaven in order to be properly fitted with a respirator.<br />
Sprague—When stopping on <strong>the</strong> mainline at Sprague, do not<br />
block <strong>the</strong> Old Highway Crossing for any period <strong>of</strong> time<br />
exceeding five (5) minutes between <strong>the</strong> hours <strong>of</strong> 0715-0815<br />
hours and 1530-1630 hours. The crossing must be cut if<br />
necessary.<br />
Missile Base-Mainline Rock and Ballast Pit—This is a<br />
circular track (balloon) approximately 4,900 feet in length. Cars<br />
may be set out going ei<strong>the</strong>r direction. Derails are set inside<br />
clearance points.<br />
Locations With a Grade Equal to or Greater Than 1%<br />
MILEPOST<br />
PERCENT OF GRADE<br />
MP 3.0 to MP 8.8 (Includes 1.25% Ascending Empire)<br />
MP 10.8 to MP <strong>11</strong>.1 1.06% Ascending<br />
MP 12.5 to MP 14.0 1% Ascending<br />
MP 32.0 to MP 34.5 1.06% Ascending<br />
MP 38.0 to MP 40.0 1.06% Descending<br />
MP 78.4 to MP 78.7 1% Descending<br />
MP 90.0 to MP 95.0<br />
(Both Tracks) 1% Descending<br />
MP 96.5 to MP 97.1<br />
(Both Tracks) 1% Descending<br />
Dynamic Braking—In order to comply with minimum dynamic<br />
brake requirements for trains on <strong>the</strong> Hi Line, Stampede, and<br />
Scenic Subdivisions, crews on such trains, before departing<br />
Seattle (Interbay), Tacoma, Havre, Sandpoint (if originating<br />
from MRL RR), Spokane (if train originates at Spokane), or<br />
Pasco (if train originates at Pasco), must:<br />
1. Inspect locomotive consist before departing locations<br />
outlined above and determine if any locomotives in<br />
consist have dynamic brakes cut out and/or are tagged<br />
defective. (Cut out traction motor(s) on DC locomotives<br />
results in inoperative dynamic brake). NOTE: Before<br />
cutting in a dynamic brake found cut out but not tagged<br />
defective, contact Mechanical Help Desk and be<br />
governed by that supervisor’s instruction.<br />
2. If any locomotive in consist found not to have an<br />
operative dynamic brake, immediately report this fact to<br />
local mechanical forces and Mechanical Help Desk.<br />
3. Any dynamic brake failure that occurs enroute<br />
<strong>the</strong>reafter must be reported to <strong>the</strong> Mechanical Help<br />
Desk.<br />
4. All relieving locomotive consist is not required if this<br />
information concerning dynamic brakes <strong>of</strong> consist is left<br />
on controlling locomotive.<br />
Dynamic brake limitation is now at 28 axles per consist for all<br />
trains on <strong>the</strong> BNSF, per Air Brake & Train Handling Rule<br />
1<strong>03</strong>.2.1, Item B. When mechanical personnel makeup<br />
locomotive consist and/or perform daily inspection <strong>of</strong><br />
locomotive consists:<br />
1. Where locomotive consists are make up by mechanical<br />
personnel, mechanical personnel will set up locomotive<br />
consist in compliance with 28 axle dynamic brake<br />
limitation (if more than 28 rated DB axles in consist)<br />
along with <strong>the</strong> o<strong>the</strong>r consist set up procedures for each<br />
locomotive in <strong>the</strong> consist.<br />
2. During that inspection, mechanical personnel note all<br />
defective dynamic brakes in consist when consist is<br />
initially made up and leave this information on controlling<br />
locomotive for <strong>the</strong> locomotive engineer.<br />
3. Local terminal operating supervision at Havre, Spokane<br />
and Seattle will communicate to mechanical personnel<br />
<strong>the</strong> minimum dynamic brake requirements for<br />
locomotive consist being built for trains requiring a<br />
minimum number <strong>of</strong> DB axles for <strong>the</strong> heavy grade<br />
territories.<br />
Flash Flood Warnings—Refer to Item 33 <strong>of</strong> <strong>the</strong> System<br />
Special Instructions. The following locations have been identified<br />
as “critical areas” and are limited to restricted speed:<br />
MP 2.5<br />
MP 3.3<br />
MP 19.9 to MP 20.5<br />
MP 69.0<br />
MP 82.3<br />
MP 97.0 to MP 98.0<br />
MP 107.0 to MP 108.7<br />
Recommended Roll-By Inspection Locations—<br />
Glade—Pull train up to within 400 feet <strong>of</strong> <strong>the</strong> block signal.<br />
West Connell—Do not inspect from <strong>the</strong> north side. On <strong>the</strong><br />
south side, pull train up beyond loading dock.<br />
West Cunningham—Inspection only from <strong>the</strong> north side.<br />
East Paha—Inspection only from <strong>the</strong> north side.<br />
East Tokio—Inspection only from <strong>the</strong> north side.<br />
West Sprague—Inspection only from <strong>the</strong> north side.<br />
East Sprague—Inspection only from <strong>the</strong> north side.<br />
East Babb—On <strong>the</strong> north side, inspect train from siding only.<br />
8. Line Segments<br />
Yard Line Segments<br />
Line Segment Limits<br />
684 ........... Cactus<br />
471 ........... Pasco Hump<br />
630 ........... Pasco<br />
631 ........... Pasco WFE<br />
Road Line Segments<br />
Line Segment Limits<br />
46 ............ Sunset Jct. to Pasco