08.02.2015 Views

UNDP India Disaster Preparedness and Response Plan

UNDP India Disaster Preparedness and Response Plan

UNDP India Disaster Preparedness and Response Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. Move after clearance from the advance group<br />

3. Establish linkage with the advance group immediately on arrival<br />

4. Occupy bases selected by the advance group<br />

5. Establish contact with other Government <strong>and</strong> NGOs in the area of operation<br />

6. Coordinate operation <strong>and</strong> report to focal point <strong>and</strong> team leader<br />

7. Suggest additional assistance in terms of men, material <strong>and</strong> resources required<br />

8. Constant monitoring <strong>and</strong> coordination of operations<br />

9. Facilitate joint UN assessment <strong>and</strong> <strong>UNDP</strong> to contribute in livelihood, environment,<br />

habitat assessment<br />

10. Donor proposal: Immediately on receipt of assessment from the advance group the<br />

project proposal will be submitted to <strong>UNDP</strong><br />

Equipment:<br />

• Satellite phone (1);<br />

• Mobile h<strong>and</strong>set (7);<br />

• VHF set (3);<br />

• Walkie talkie (7),<br />

• Global Positioning System (1);<br />

• Laptop with accessories (1);<br />

• Life jackets (7);<br />

• Helmet with torch light (7);<br />

• Nylon single man tent (7);<br />

• Emergency torch (7);<br />

• First aid box (3);<br />

• Clothing rations <strong>and</strong> logistics backup for the entire duration;<br />

• V-satellite (1);<br />

• Inflatable boats (optional- 03)<br />

Mode of travel: Preferably by air in order to be effective in shortest possible time.<br />

Additional groups: Depending on the assessment carried out by the advance group <strong>and</strong><br />

availability of uncommitted manpower with <strong>UNDP</strong> hubs, additional teams can be<br />

mobilized locally with composition <strong>and</strong> task as above.<br />

Capacity Building of <strong>Response</strong> Teams through Information Sharing, Training & Mock<br />

Drills<br />

Following important parameters must be strictly adhered to for ensuring a organized,<br />

effective <strong>and</strong> functional disaster management taskforce to face any eventuality at any time:<br />

- Maximum personnel of all groups must visit all identified disaster sites<br />

• Training in the respective task under respective team leaders<br />

• Procurement of all equipment <strong>and</strong> resources <strong>and</strong> maintaining them in working<br />

conditions at all times.<br />

• Training of specialists in their respective specialization<br />

Page 30of 84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!