Stormwater Manual Lexington-Fayette
- Page 3 and 4:
1.1 Introduction Chapter 1 gives th
- Page 5 and 6:
1.3 Definitions 1.3.1 Public Draina
- Page 7 and 8:
• the Division of Engineering det
- Page 9 and 10:
• Masterson Station Watershed hyd
- Page 11 and 12:
• only one corporation or busines
- Page 13 and 14:
1.5 Water Quantity Criteria for New
- Page 15 and 16:
TABLE 1- 1 OPTIONS FOR STORMWATER M
- Page 17 and 18:
TABLE 1- 2 FLOW CRITERIA FOR STORMW
- Page 19 and 20: contained in Chapter 10. The water
- Page 21 and 22: 1.7.4 Water Quality Criteria for Re
- Page 23 and 24: • new development commercial site
- Page 27 and 28: CHAPTER 2 PERMITS
- Page 29 and 30: 2.1 Land Disturbance Permit 2.1.1 P
- Page 31 and 32: If the analysis described in the de
- Page 33 and 34: 2.3 Kentucky Division of Water KPDE
- Page 35 and 36: 2.5 401 and 404 Permits - Kentucky
- Page 37 and 38: 3.1 Introduction Watershed studies
- Page 39 and 40: • detailed description of any nat
- Page 41 and 42: 3.3 Runoff Models 3.3.1 General The
- Page 43 and 44: 3.4 Post-Development Floodplain Ana
- Page 45 and 46: APPENDIX 3-A - SOURCES OF DATA
- Page 47 and 48: National Oceanography and Atmospher
- Page 49 and 50: Pond/Culvert Inventory Data Sheet P
- Page 51 and 52: 4.1 Overview 4.1.1 Introduction An
- Page 53 and 54: 4.3 Improvement Plans 4.3.1 50 Perc
- Page 55 and 56: • culvert outlet appurtenances an
- Page 57 and 58: 4.4 Record Drawings A record drawin
- Page 59 and 60: 5.1 Introduction 5.1.1 Purpose The
- Page 61 and 62: 5.3 Design Rainfall Event 5.3.1 Sin
- Page 63 and 64: TABLE 5- 2 GREEN-AMPT INFILTRATION
- Page 65 and 66: 5.5 Stormwater Management Model (SW
- Page 67 and 68: TABLE 5- 4 MANNINGS N FOR OVERLAND
- Page 69: APPENDIX 5 A DESIGN STORM DISTRIBUT
- Page 73 and 74: 100-YEAR - 24-HOUR RAINFALL DISTRIB
- Page 75 and 76: CHAPTER 6 INLETS / STORM SEWERS / M
- Page 77 and 78: 6.1.4 Storm Sewers Storm sewers sha
- Page 79 and 80: For d ≥ 1.0’, use the orifice f
- Page 81 and 82: 6.4 Construction Specifications All
- Page 83 and 84: 7.1 Introduction As used in this ma
- Page 85 and 86: 7.2.6 Culvert Skew A culvert shall
- Page 87 and 88: Barrel Area and Shape Barrel area i
- Page 89 and 90: 7.5 Bridge Design Procedures Use HE
- Page 91 and 92: CHAPTER 8 CONSTRUCTED CHANNELS
- Page 93 and 94: 8.2 Permanent Constructed Channels
- Page 95 and 96: The earth fill materials used to co
- Page 97: 8.3 Paved Channels A paved channel
- Page 100 and 101: 9.1 Introduction The streams of Fay
- Page 102 and 103: 9.2.3 Material Specifications Veget
- Page 104 and 105: TABLE 9- 1 SUGGESTED RIPARIAN SPECI
- Page 106 and 107: 9.3 Riparian Buffer Zones 9.3.1 Gen
- Page 108 and 109: 9.4 Bioengineering Techniques Bioen
- Page 110 and 111: 9.4.3 Root Wad Revetment Root wad r
- Page 112 and 113: Dead stout stakes shall be installe
- Page 114 and 115: Willow tree species are the best fo
- Page 116: 9.5.3 Maintenance All structures sh
- Page 129 and 130:
10.1 Introduction Non-point source
- Page 131 and 132:
TABLE 10- 1 WATER QUALITY DEPTH VER
- Page 133 and 134:
Grade the top of the planting soil
- Page 135 and 136:
10.4 Infiltration Systems Infiltrat
- Page 137 and 138:
Design Criteria To be considered a
- Page 139 and 140:
If desired, large infiltration basi
- Page 141 and 142:
When the contributing area draining
- Page 143 and 144:
Provide sufficient access to the de
- Page 145 and 146:
Select underdrain gravel to meet AA
- Page 147 and 148:
Compute the total surface area of b
- Page 149 and 150:
10.6 Prefabricated Treatment Device
- Page 151 and 152:
landscaping plan for the pond and t
- Page 153 and 154:
When necessary, compact subgrade su
- Page 155 and 156:
After the embankment has been built
- Page 157 and 158:
Embankment heights shall not exceed
- Page 159 and 160:
10.9 Wet Ponds In this manual, wet
- Page 161 and 162:
Q = A (2gH) 0.5 /(1 + K e +K b + K
- Page 163 and 164:
Provide a drain with a valve at the
- Page 180 and 181:
CHAPTER 11 EROSION AND SEDIMENT CON
- Page 182 and 183:
11.1 Purpose This chapter describes
- Page 184 and 185:
1. The limitations on coverage set
- Page 186 and 187:
11.2.2 Non-Structural Practices Thi
- Page 188 and 189:
Figure 11-1. “Seed mats” may be
- Page 190 and 191:
peak discharges during construction
- Page 192 and 193:
Locations of proposed controls, uti
- Page 194 and 195:
11.4 Structural Soil Stabilization
- Page 196 and 197:
When using a mulch net, it shall be
- Page 198 and 199:
Material Specifications Seed shall
- Page 200 and 201:
Material Specifications Soil materi
- Page 202 and 203:
11.4.5 Road/Parking Stabilization R
- Page 204 and 205:
To reduce maintenance and loss of a
- Page 206 and 207:
Effective netting and matting requi
- Page 208 and 209:
Maintenance Outlets shall be inspec
- Page 210 and 211:
Temporary or permanent seeding and
- Page 212 and 213:
A standard flared end section or a
- Page 214 and 215:
11.5 Structural Sediment Control BM
- Page 216 and 217:
The amount of sediment entering a t
- Page 218 and 219:
Detention storage shall be provided
- Page 220 and 221:
The emergency spillway shall have a
- Page 222 and 223:
PHYSICAL PROPERTY Filtering Efficie
- Page 224 and 225:
Fasten fabric securely to the stake
- Page 226 and 227:
SEEDING MIXTURE AND SITE SUITABILIT
- Page 228 and 229:
Upon removal of the structure, the
- Page 230 and 231:
11.5.10 Concrete Washout Pits Concr
- Page 232:
Inspection of Sediment Controls The
- Page 261 and 262:
12.1 Introduction As Fayette County
- Page 263 and 264:
12.2 Dry Detention Pond 12.2.1 Desc
- Page 265 and 266:
12.3 Dry Extended Detention Pond 12
- Page 267 and 268:
12.4 Wet Detention Pond 12.4.1 Desc
- Page 269 and 270:
12.5 Constructed Wetlands 12.5.1 De
- Page 271 and 272:
12.6 Biofiltration Practices 12.6.1
- Page 273 and 274:
12.7 Infiltration Practices 12.7.1
- Page 275 and 276:
12.8 Modular Pavement 12.8.1 Descri
- Page 277 and 278:
12.10 Prefabricated Treatment Devic
- Page 279 and 280:
1Lexington-Fayette Urban County Gov
- Page 281 and 282:
2Infiltration Basin Maintenance Ins
- Page 283 and 284:
3Infiltration Swale Maintenance Ins
- Page 285 and 286:
Action to be taken: If any of the a
- Page 287 and 288:
6Filtration Facility Maintenance In
- Page 289 and 290:
Summary of Changes to the LFUCG Sto
- Page 291:
11.5.5 Storm Drain Inlet Protection