COLUMN<br />

ii) Must be registered with the<br />

Ministry of Finance as a provider<br />

of services under the <strong>Green</strong><br />

Technology Code 222 801;<br />

iii) To submit a record <strong>and</strong> information<br />

about EPC projects ever<br />

<strong>and</strong> is being implemented as a<br />

reference mainly involving largescale<br />

investments;<br />

iv) Submission of proposed method<br />

for the measurement <strong>and</strong> monitoring<br />

of energy savings each<br />

month on a regular basis over<br />

the term of the EPC contract to<br />

be implemented. The method<br />

of calculating the energy savings<br />

achieved must be based<br />

on the actual measurement of<br />

the difference in total energy<br />

consumption before <strong>and</strong> after<br />

implementation of the proposed<br />

energy conservation project;<br />

v) Be prepared to conduct a detailed<br />

energy audit of buildings at no<br />

cost to the owner of the building<br />

facilities.<br />

Lastly, is the most crucial part<br />

to get the EPC project implemented<br />

which is the key elements <strong>and</strong> contents<br />

of EPC contractual documents.<br />

Key elements that must be clearly<br />

stipulated <strong>and</strong> agreed between the<br />

ESCO <strong>and</strong> the facilities owner are as<br />

follows:<br />

+ The proposed duration of the<br />

contract with the guarantee<br />

of energy cost savings <strong>and</strong><br />

conditions:<br />

+ The minimum amount of savings<br />

expected to be achieved<br />

+ The method, report formatting<br />

<strong>and</strong> formula for calculating<br />

shared savings will be paid to the<br />

ESCO;<br />

+ Conditions to be applied if savings<br />

achieved are less than<br />

guaranteed by the ESCO.<br />

+ The cost savings with significant<br />

changes of operations at the<br />

facilities.<br />

+ The responsibilities of building<br />

owners <strong>and</strong> the ESCO throughout<br />

the contract period.<br />

+ Maintenance, use, maintenance<br />

<strong>and</strong> modification or removal of<br />

the equipment that was installed<br />

Malaysia, the Philippines,<br />

Thail<strong>and</strong> <strong>and</strong> Indonesia all show<br />

significant power generation<br />

growth, with considerable<br />

opportunities also emerging in<br />

Myanmar as the government<br />

makes power sector reforms.<br />

by the ESCO by the facilities<br />

owner.<br />

+ If the equipment installed by<br />

the ESCO is lost or damaged <strong>and</strong><br />

guarantee of losses <strong>and</strong> liabilities<br />

by ESCO to the facilities owner.<br />

In a bigger picture, the<br />

investments from EPC projects<br />

implementation could also contribute<br />

to the growth of our economy<br />

<strong>and</strong> reduction of carbon dioxide gas<br />

emission through the reduction of<br />

energy consumption. That will be<br />

derived from investments made<br />

by ESCOs which will create more<br />

jobs from each EPC project <strong>and</strong><br />

the increase in the use of energy<br />

efficient technologies <strong>and</strong> products<br />

by among intensive energy users<br />

among business communities in<br />

Malaysia.<br />

Other benefits are more EPC<br />

projects implementation will create<br />

interests among younger generation<br />

<strong>and</strong> encourage more professionals<br />

to be look energy efficiency industry<br />

as a new field of attractive <strong>and</strong> good<br />

career prospects in the future.<br />

Zaini Abdul<br />

Wahab is<br />

a principal<br />

consultant<br />

& director of<br />

Connecys Sdn<br />

Bhd which<br />

specialiszes in<br />

consultancy<br />

for sustainable<br />

energy<br />

management<br />

system. He was<br />

also Director<br />

of Energy<br />

Efficiency at<br />

<strong>Sustainable</strong><br />

Energy<br />

Development<br />

Authority<br />

(SEDA) Malaysia<br />

<strong>and</strong> led the<br />

national EE<br />

initiatives<br />

under ETP <strong>and</strong><br />

also was the<br />

key resource<br />

person in the<br />

drafting of EE<br />

& Conservation<br />

Act by the<br />

Ministry of<br />

Energy, <strong>Green</strong><br />

Technology <strong>and</strong><br />

Water<br />

green+.2014, november-december 35