28 <strong>Canolfan</strong> <strong>Rheidol</strong><br />

“The building was<br />

required to achieve<br />

a BREEAM<br />

“Excellent” rating<br />

and this was<br />

achieved by a<br />

mixture of passive<br />

and active<br />

measures.”<br />

Cnec kinder boiler<br />

9m wide full height atrium, allow the building to be<br />

predominantly naturally ventilated when required.<br />

The ground floor facilities contain the high<br />

occupancy areas requiring mechanical ventilation,<br />

whilst the upper floors have the highly serviced<br />

cellular spaces grouped at either end of the open<br />

plan wings.<br />

• Thermal Mass: Exposed concrete soffits allow for<br />

heat absorption during the day following night time<br />

cooling by a BMS controlled high level windows.<br />

• Heating and Hot Water: This is provided by an off<br />

site biomass boiler, which burns locally sourced<br />

woodchip. The Council also provides the adjoining<br />

WAG office building with energy at 2p/kWH plus a<br />

small service charge.<br />

• Electricity: In addition to generous natural lighting,<br />

internal luminaires incorporate fully controllable<br />

daylight dimming, adjusting power consumption<br />

in relation to daylight levels. A 15m high<br />

“Quiet Revolution” wind turbine and solar panels<br />

supplement electrical demand.<br />

• Water Conservation and Biodiversity: Rainwater<br />

harvesting is incorporated for toilet flushing.<br />

Project details<br />

Notional Building Target Score (TER):<br />

29.4kg CO 2 /m 2 /annum<br />

Predicted Building Performance (DER):<br />

14.9kg CO 2 /m 2 /annum<br />

Predicted % Improvement:<br />

49.3%<br />

Credits<br />

Architect:<br />

Powell Dobson<br />

Quantity Surveyor:<br />

Ceredigion County Council<br />

Mechanical & Electrical Engineer:<br />

Hoare Lea<br />

Predicted EPC Score:<br />

B<br />

BREEAM Rating:<br />

Excellent<br />

The Energy Saving Trust supported the project<br />

via its Carbon Management Programme and<br />

provides assistance in monitoring the energy<br />

performance of the building.<br />

Structural Engineer:<br />

Clarke Bond<br />

Start on site:<br />

March 2008<br />

Landscape Architect:<br />

Soltys Brewer<br />

Completion:<br />

July 2009<br />

Main Contractor:<br />

Willmott Dixon Ltd.<br />

The total cost of the project was £15 million<br />

including fixtures and fittings