Complex Load Example<br />
• In the <strong>PowerWorld</strong> CLOD model, under-voltage motor tripping may be<br />
set by the following parameters<br />
– Vi = voltage at which trip will occur (default = 0.75 pu)<br />
– Ti (cycles) = length of time voltage needs to be below Vi before trip will occur<br />
• In the example, under voltage trips occurred at bus 5 and bus 8 when<br />
the fault clearing time was increased to 1.155<br />
• Verify that increasing the clearing time further to 1.2 causes additional<br />
under-voltage trips of loads at buses 6, and an over-frequency trip of<br />
Generator 2<br />
Mechanical Power (MW)<br />
160<br />
150<br />
140<br />
130<br />
120<br />
110<br />
100<br />
90<br />
80<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
0<br />
1<br />
2<br />
3<br />
cleared at 1.155 seconds<br />
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20<br />
Time (Seconds)<br />
Generator<br />
Pmech<br />
Mechanical Power (MW)<br />
160<br />
140<br />
120<br />
100<br />
80<br />
60<br />
40<br />
20<br />
0<br />
0<br />
1<br />
2<br />
3<br />
4<br />
cleared at 1.2 seconds<br />
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19<br />
Time (Seconds)<br />
20<br />
Mech Input_Gen Bus 2 #1 Mech Input_Gen Bus 3 #1 Mech Input_Gen Bus1 #1<br />
Mech Input_Gen Bus 2 #1 Mech Input_Gen Bus 3 #1 Mech Input_Gen Bus1 #1<br />
T12: <strong>Wind</strong> <strong>Turbine</strong><br />
© 2012 <strong>PowerWorld</strong> Corporation<br />
wscc_9bus_Type3WTG_CLOD<br />
20