a<br />

<strong>Management</strong> <strong>of</strong> <strong>Lifting</strong> <strong>Operations</strong> <strong>and</strong> <strong>Equipment</strong><br />

Control Section 2 – Non Crane <strong>Lifting</strong> <strong>Operations</strong> <strong>and</strong> <strong>Equipment</strong><br />

SM-WI-45-03<br />

Page 12 <strong>of</strong> 15<br />

adopted. Clear lines <strong>of</strong> communication <strong>and</strong> a Safe System <strong>of</strong> Work must be established<br />

for all excava<strong>to</strong>r lifting procedures (Lift Plan <strong>and</strong> RAMS).<br />

2.5 360 degree excava<strong>to</strong>rs must not be used <strong>to</strong> lift people or have fork attachments.<br />

2.6 The shackle connecting <strong>the</strong> chains <strong>to</strong> <strong>the</strong> lifting point must be able <strong>to</strong> hang freely <strong>and</strong> an<br />

inline swivel shackle (Figure 4) must be used <strong>to</strong> avoid undue stresses, dis<strong>to</strong>rtion <strong>and</strong><br />

potential snapping occurring (Figure 5).<br />

Figure 4 Figure 5<br />

3.0 Lorry Loader (HIAB)<br />

3.1 Lorry loaders will be contracted via one <strong>of</strong> two arrangements; hire <strong>of</strong> a lorry loader, or<br />

contract lift. The supply <strong>and</strong> delivery <strong>of</strong> goods by lorry loader is normally deemed a<br />

contract lift.<br />

4.0 Telescopic H<strong>and</strong>lers<br />

4.1 A copy <strong>of</strong> <strong>the</strong> Traffic <strong>Management</strong> Plan / Site Setup Plan indicating lifting zones <strong>and</strong><br />

temporary access routes must be kept in <strong>the</strong> cab.<br />

4.2 If lifting from <strong>the</strong> forks (under slinging) proper attachments must be fixed with heel pins<br />

(not ‘T’ screws).<br />

4.3 Refer <strong>to</strong> <strong>Management</strong> <strong>of</strong> Operated Plant (SS-WI-24), CS1.<br />

5.0 Inspections<br />

5.1 A record <strong>of</strong> <strong>the</strong> 12 month Thorough Examination must be available for equipment used <strong>to</strong><br />

lift materials, including service records for <strong>the</strong> previous two years. Duty Charts must also<br />

be available at all times.<br />

A Balfour Bea~y Company Uncontrolled when downloaded or printed © Mansell