15.03.2015 Views

Management of Lifting Operations and Equipment - to return to the ...

Management of Lifting Operations and Equipment - to return to the ...

Management of Lifting Operations and Equipment - to return to the ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

a<br />

<strong>Management</strong> <strong>of</strong> <strong>Lifting</strong> <strong>Operations</strong> <strong>and</strong> <strong>Equipment</strong><br />

Control Section 3 – Goods <strong>and</strong> Personnel Hoists<br />

SM-WI-45-03<br />

Page 15 <strong>of</strong> 15<br />

competent Scaffolder as per ‘<strong>Management</strong> <strong>of</strong> Work at Height’, SM-WI-49, Control<br />

Section 1 – Scaffold.<br />

3.0 Inspection<br />

3.1 A Hoist H<strong>and</strong>over Report or similar must be provided by <strong>the</strong> erecting specialist, <strong>to</strong><br />

confirm <strong>the</strong> hoist is safe <strong>and</strong> has undergone overload <strong>and</strong> drop tests.<br />

3.2 All hoists must be visually inspected before each use <strong>and</strong> formally inspected at least every<br />

seven days. Inspections must be recorded in <strong>the</strong> Inspection Register (SS-FM-17) or a<br />

form provided by <strong>the</strong> supplier covering at least <strong>the</strong> same information. Optional forms for<br />

more detailed daily <strong>and</strong> weekly inspection can be found on <strong>the</strong> Construction Plant<br />

Association Website (CPA) at: http://www.cpa.uk.net/p/Home-Page/<br />

3.3 Passenger hoists must be thoroughly examined at least every 6 months. Goods hoists<br />

must be thoroughly examined at least every 12 months.<br />

3.4 Thorough examination <strong>of</strong> hoists will also be required following an accident or dangerous<br />

occurrence, overloading or any significant repairs including <strong>the</strong> replacement <strong>of</strong> load<br />

bearing parts.<br />

A Balfour Bea~y Company Uncontrolled when downloaded or printed © Mansell

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!