SM-WI-45-03<br />
a<br />
Page 3 <strong>of</strong> 15<br />
<strong>Management</strong> <strong>of</strong> <strong>Lifting</strong> <strong>Operations</strong> <strong>and</strong> <strong>Equipment</strong><br />
2.0 Overview Chart<br />
Planning Work Involving <strong>Lifting</strong> <strong>Operations</strong>.<br />
(Excluding Tower Cranes)<br />
Key:<br />
APP = Appointed Person - Project<br />
APL = Appointed Person - Lift<br />
See Table 4, Page 7 for Roles & Responsibilities<br />
Responsibility Reference Form<br />
PRE–CONSTRUCTION – Review tender proposal with an<br />
Appointed Person <strong>to</strong> determine if complex lifts are required.<br />
Outline Lift Plan <strong>and</strong> specific controls <strong>to</strong> be prepared.<br />
DURING CONSTRUCTION – Nominate an Appointed Person<br />
for <strong>the</strong> Project (APP) in <strong>the</strong> Project <strong>Management</strong> Plan (PMP)<br />
Planner /<br />
Estima<strong>to</strong>r<br />
Construction<br />
Head / Contracts<br />
Manager<br />
Para 3.2<br />
Para 3.1<br />
Is <strong>the</strong> lift a<br />
crane lift?<br />
No<br />
APP / APL /<br />
Project Manager /<br />
Site Manager<br />
Table 2<br />
Yes<br />
No<br />
Yes<br />
(3) A Contract Lift<br />
is m<strong>and</strong>a<strong>to</strong>ry.<br />
Is it a<br />
Complex<br />
lift?<br />
No<br />
(2) APL<br />
produce Lift<br />
Plan <strong>and</strong><br />
establish<br />
Duty Holder<br />
requirements<br />
for <strong>the</strong> lift<br />
using Table<br />
3.<br />
(1) For Excava<strong>to</strong>r,<br />
Teleh<strong>and</strong>ler,<br />
Lorry Loader or<br />
O<strong>the</strong>r Lifts:<br />
The APL or APP<br />
will produce a Non<br />
Crane Lift Plan for<br />
repetitive lifts or a<br />
Lift Plan for a lift by<br />
a teleh<strong>and</strong>ler not<br />
using forks. They<br />
will establish Duty<br />
Holder<br />
requirements for<br />
<strong>the</strong> lift using Table<br />
3.<br />
APP / APL<br />
APP / APL<br />
APP / APL<br />
APP / APL<br />
Table 2<br />
(1) Table 2<br />
Table 3<br />
Control Section 2<br />
(2) Table 2<br />
Table 3<br />
Control Section 1<br />
(3) Table 2<br />
Control Section 1<br />
Form<br />
SS-FM-53<br />
Form<br />
SM-FM-41<br />
APP <strong>and</strong> Site Manager review <strong>the</strong> proposed Lift Plan <strong>and</strong><br />
RAMS <strong>and</strong> specifically consider:<br />
Correct equipment for task, load, reach <strong>and</strong> space<br />
Ground bearing capacity against loading & fac<strong>to</strong>r <strong>of</strong> safety<br />
Excluding people from lifting area<br />
Make sure that this is recorded in <strong>the</strong> Lift Plan & RAMS.<br />
APP / TWC / Site<br />
Manager / Project<br />
Manager<br />
Para 3.3<br />
Table 1<br />
RAMS Form<br />
SM-FM-17<br />
Can you<br />
accept <strong>the</strong> Lift<br />
Plan &<br />
RAMS?<br />
APP / Site<br />
Manager / Project<br />
Manager /<br />
Contracts<br />
Manager / TWC<br />
(<strong>and</strong> as per WAS)<br />
Para 3.4<br />
& SM-WI-50<br />
RAMS Evaluation<br />
Form SM-FM-46<br />
Yes<br />
Ensure that those involved in <strong>the</strong> work are briefed.<br />
APP / APL / Site<br />
Manager<br />
SM-WI-15<br />
SM-FM-47<br />
Ensure that those carrying out <strong>the</strong> work are competent as<br />
specified in <strong>the</strong> Lift Plan, RAMS <strong>and</strong> ‘Control Sections’.<br />
APP / APL / Site<br />
Manager<br />
SM-WI-15<br />
Control Sections<br />
SM-FM-30<br />
Moni<strong>to</strong>r <strong>the</strong> work on site regularly <strong>to</strong> ensure that it is being<br />
carried out as detailed in <strong>the</strong> Lift Plan <strong>and</strong> RAMS.<br />
Site Manager<br />
Ensure that inspections are performed <strong>and</strong> acted upon.<br />
Site Manager<br />
SS-FM-17<br />
SS-FM-52<br />
Ensure that any change in <strong>the</strong> way that work is done on site is<br />
assessed <strong>and</strong> recorded in <strong>the</strong> Lift Plan <strong>and</strong> RAMS.<br />
<strong>Lifting</strong> Operation Safely Completed.<br />
APP / APL / Site<br />
Manager / Project<br />
Manager /<br />
Contracts Man’r<br />
SM-WI-09<br />
A Balfour Bea~y Company Uncontrolled when downloaded or printed © Mansell