SM-WI-45-03<br />

a<br />

Page 3 <strong>of</strong> 15<br />

<strong>Management</strong> <strong>of</strong> <strong>Lifting</strong> <strong>Operations</strong> <strong>and</strong> <strong>Equipment</strong><br />

2.0 Overview Chart<br />

Planning Work Involving <strong>Lifting</strong> <strong>Operations</strong>.<br />

(Excluding Tower Cranes)<br />

Key:<br />

APP = Appointed Person - Project<br />

APL = Appointed Person - Lift<br />

See Table 4, Page 7 for Roles & Responsibilities<br />

Responsibility Reference Form<br />

PRE–CONSTRUCTION – Review tender proposal with an<br />

Appointed Person <strong>to</strong> determine if complex lifts are required.<br />

Outline Lift Plan <strong>and</strong> specific controls <strong>to</strong> be prepared.<br />

DURING CONSTRUCTION – Nominate an Appointed Person<br />

for <strong>the</strong> Project (APP) in <strong>the</strong> Project <strong>Management</strong> Plan (PMP)<br />

Planner /<br />

Estima<strong>to</strong>r<br />

Construction<br />

Head / Contracts<br />

Manager<br />

Para 3.2<br />

Para 3.1<br />

Is <strong>the</strong> lift a<br />

crane lift?<br />

No<br />

APP / APL /<br />

Project Manager /<br />

Site Manager<br />

Table 2<br />

Yes<br />

No<br />

Yes<br />

(3) A Contract Lift<br />

is m<strong>and</strong>a<strong>to</strong>ry.<br />

Is it a<br />

Complex<br />

lift?<br />

No<br />

(2) APL<br />

produce Lift<br />

Plan <strong>and</strong><br />

establish<br />

Duty Holder<br />

requirements<br />

for <strong>the</strong> lift<br />

using Table<br />

3.<br />

(1) For Excava<strong>to</strong>r,<br />

Teleh<strong>and</strong>ler,<br />

Lorry Loader or<br />

O<strong>the</strong>r Lifts:<br />

The APL or APP<br />

will produce a Non<br />

Crane Lift Plan for<br />

repetitive lifts or a<br />

Lift Plan for a lift by<br />

a teleh<strong>and</strong>ler not<br />

using forks. They<br />

will establish Duty<br />

Holder<br />

requirements for<br />

<strong>the</strong> lift using Table<br />

3.<br />

APP / APL<br />

APP / APL<br />

APP / APL<br />

APP / APL<br />

Table 2<br />

(1) Table 2<br />

Table 3<br />

Control Section 2<br />

(2) Table 2<br />

Table 3<br />

Control Section 1<br />

(3) Table 2<br />

Control Section 1<br />

Form<br />

SS-FM-53<br />

Form<br />

SM-FM-41<br />

APP <strong>and</strong> Site Manager review <strong>the</strong> proposed Lift Plan <strong>and</strong><br />

RAMS <strong>and</strong> specifically consider:<br />

Correct equipment for task, load, reach <strong>and</strong> space<br />

Ground bearing capacity against loading & fac<strong>to</strong>r <strong>of</strong> safety<br />

Excluding people from lifting area<br />

Make sure that this is recorded in <strong>the</strong> Lift Plan & RAMS.<br />

APP / TWC / Site<br />

Manager / Project<br />

Manager<br />

Para 3.3<br />

Table 1<br />

RAMS Form<br />

SM-FM-17<br />

Can you<br />

accept <strong>the</strong> Lift<br />

Plan &<br />

RAMS?<br />

APP / Site<br />

Manager / Project<br />

Manager /<br />

Contracts<br />

Manager / TWC<br />

(<strong>and</strong> as per WAS)<br />

Para 3.4<br />

& SM-WI-50<br />

RAMS Evaluation<br />

Form SM-FM-46<br />

Yes<br />

Ensure that those involved in <strong>the</strong> work are briefed.<br />

APP / APL / Site<br />

Manager<br />

SM-WI-15<br />

SM-FM-47<br />

Ensure that those carrying out <strong>the</strong> work are competent as<br />

specified in <strong>the</strong> Lift Plan, RAMS <strong>and</strong> ‘Control Sections’.<br />

APP / APL / Site<br />

Manager<br />

SM-WI-15<br />

Control Sections<br />

SM-FM-30<br />

Moni<strong>to</strong>r <strong>the</strong> work on site regularly <strong>to</strong> ensure that it is being<br />

carried out as detailed in <strong>the</strong> Lift Plan <strong>and</strong> RAMS.<br />

Site Manager<br />

Ensure that inspections are performed <strong>and</strong> acted upon.<br />

Site Manager<br />

SS-FM-17<br />

SS-FM-52<br />

Ensure that any change in <strong>the</strong> way that work is done on site is<br />

assessed <strong>and</strong> recorded in <strong>the</strong> Lift Plan <strong>and</strong> RAMS.<br />

<strong>Lifting</strong> Operation Safely Completed.<br />

APP / APL / Site<br />

Manager / Project<br />

Manager /<br />

Contracts Man’r<br />

SM-WI-09<br />

A Balfour Bea~y Company Uncontrolled when downloaded or printed © Mansell

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!