You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Playset Assembly Instructions<br />
Look for ‘’TOP’’<br />
stamp on brackets<br />
while installing.<br />
TOP<br />
GAP on<br />
this side<br />
Frame 1 Construction<br />
Fig.1b<br />
DO NOT USE <strong>LA</strong>G<br />
SCREWS HERE<br />
Use Lag Screws Only Where<br />
Brackets Attach<br />
Fig.1a<br />
3'' x 3'' x 94''<br />
83-1/4''<br />
(2)<br />
2'' Lag Screws<br />
per joint<br />
(2)<br />
1-1/4'' Lag<br />
Screws<br />
per joint<br />
Fig.1c<br />
DO NOT USE <strong>LA</strong>G<br />
SCREWS HERE<br />
Use Lag Screws Only Where<br />
Brackets Attach<br />
(2)<br />
1-1/4'' Lag Screws<br />
per joint<br />
(2)<br />
2'' Lag Screws<br />
per joint<br />
47-1/4''<br />
Frame 1<br />
A. Frame 1 Construction<br />
1-1/4'' Lag screw<br />
1. Measure and position brackets on 3'' x 3'' as shown in (Fig.1a).<br />
Note: Secure Shelf Lock with (2) Lag Screws only at this time.<br />
2'' Lag screw<br />
10