METHOD STATEMENT Ladder Inspection Routines - Vital Energi
METHOD STATEMENT Ladder Inspection Routines - Vital Energi
METHOD STATEMENT Ladder Inspection Routines - Vital Energi
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>METHOD</strong> <strong>STATEMENT</strong><br />
<strong>Ladder</strong> <strong>Inspection</strong> <strong>Routines</strong><br />
Job / Contract Name<br />
Dunfermline<br />
Job / Contract Number VC 90150<br />
Date Apr 2013<br />
Method Statement Written By <strong>Vital</strong> <strong>Energi</strong> Utilities Ltd<br />
Method Statement Approved By<br />
Corresponding Risk Assessment No.<br />
Signature of Approver<br />
1. INTRODUCTION<br />
This Method Statement describes the specific safe working methods which will be used to carry out the work. It gives<br />
details of how the work will be carried out and what health and safety issues and controls are involved. The content of<br />
this Method Statement reflects the finding of the relevant Risk Assessment(s).<br />
2. DESCRIPTION OF WORK<br />
<strong>Ladder</strong> <strong>Inspection</strong> <strong>Routines</strong><br />
Maximo PM Number: 3464<br />
Work Type:<br />
PM<br />
Job Seq. Description of Task to be completed<br />
5 Note: - Only trained and competent persons are to undertake this job<br />
10 Check that the ladder/stepladder is correct access equipment for the required tasks.<br />
60 Is the ladder/stepladder storage location suitable?<br />
70 Is the ladder/stepladder clearly identified and on a register. (Within SHE 6)<br />
80 Inspect the ladder/stepladder to ensure it is in good condition, clean and free from slippery substances.<br />
90 Inspect the ladder/stepladder feet for any signs of damage, wear and security.<br />
100 Inspect the ladder steps and rungs for signs of damage, wear and security.<br />
110 Is the ladder/stepladder safely positioned in relation to pedestrians, traffic, overhead cables, etc?<br />
130 In the case of extension ladders, is there sufficient overlap between sections?<br />
140 In the case of stepladders, are stays, chains and cords secure and in good condition?<br />
145 Ensure the correct colour coded tag is affixed<br />
150 Report any major defects to the O & M Manager.<br />
May 21, 2013 9:21:37 PM GMT+01:00 1 / 3
3. LOCATION / ASSET OF WORK<br />
Location<br />
DUN-ECB<br />
Asset<br />
4. Access Arrangements<br />
Give details of any special access or egress arrangements that will be used.<br />
5. Licence<br />
If a licence is required for this work, give details of licence required, who holds it and where a copy of this licence is<br />
stored e.g. Asbestos, C.O.R.G.I. Registration.<br />
May 21, 2013 9:21:37 PM GMT+01:00 2 / 3
May 21, 2013 9:21:37 PM GMT+01:00 3 / 3