September 6, <strong>2013</strong><br />

Subject : Corrigendum <strong>No</strong>. 4 in the <strong>RFP</strong> <strong><strong>No</strong>tice</strong> <strong>No</strong>. <strong>10</strong> <strong>of</strong> <strong>2013</strong><br />

Reference: <strong>RFP</strong> <strong><strong>No</strong>tice</strong> <strong>No</strong>. <strong>10</strong> <strong>of</strong> <strong>2013</strong><br />

<strong>CORRIGEND</strong>UM NO. 4 to <strong>RFP</strong> <strong><strong>No</strong>tice</strong> <strong>No</strong>. <strong>10</strong> <strong>of</strong> <strong>2013</strong> by GSDMA<br />

Following is the corrigendum to presently available <strong>RFP</strong> for “Selection <strong>of</strong> Build, Own, Operate, and Transfer (BOOT) Operator to Set-up and<br />

manage Information & Communication Technology System (ICTS) Infrastructure for <strong>Gujarat</strong> <strong>State</strong> <strong>Disaster</strong> Response”.<br />

Sr. # Page # Clause #<br />

1<br />

95 2.6<br />

Description <strong>of</strong><br />

Terms / Headings<br />

GSDR-ICTS Design<br />

Criteria<br />

Existing Clause Queries Reply<br />

GSWAN backbone will be used<br />

for inter and intra organizational<br />

day-to-day operations with<br />

VSAT network as fallback<br />

communication backbone<br />

available 24*7<br />

The MPLS VPN is planned as<br />

fallback network for GSWAN<br />

(MPLS-VPN should interconnect<br />

SEOC (1), DEOCs (26), TEOCs<br />

(29) and ERCs (5)<br />

pl. confirm GSWAN shall have largely 2<br />

failover i.e. VSAT and MPLS, However this<br />

network also have their failover<br />

mechanism. Guidelines on failover<br />

covering complete scenario shall be<br />

appreciated. Also, How shall they operate<br />

when all networks are live<br />

Network resource preference is<br />

provided on page 97 <strong>of</strong> existing<br />

<strong>RFP</strong>.


2<br />

3<br />

92 2.2<br />

19<br />

Pg. <strong>No</strong>. 19 / 1.2.7 /<br />

e<br />

Horizontal and vertical<br />

connectivity between SEOC,<br />

DEOC, ERC, GIDM, TEOC, ESF(s),<br />

<strong>State</strong> Data Center, SICN and<br />

other nodes on GSWAN and<br />

public telecom based GSDR-ICTS<br />

backbone (MPLS-VPN). The<br />

connectivity on MPLS-VPN<br />

between SEOC and DEOCs will<br />

be at 1 Mbps rate and between<br />

District and TEOC will be at 128<br />

Kbps rates. Horizontal<br />

connectivity means connectivity<br />

at a particular level for example<br />

district EOC and ESF<br />

departments in the same<br />

district. Vertical connectivity<br />

means connectivity across levels<br />

for example SEOC and DEOC.<br />

Public telecom network for<br />

voice and broadband internet<br />

connectivity at SEOC, DEOC,<br />

TEOC<br />

We understand, Horizontal connectivity<br />

with various ESF organizations will be over<br />

GSWAN Only.<br />

Additionally bidder need to cater to MPLS-<br />

VPN based backup connectivity. Pls<br />

confirm.<br />

If the above is to be catered then pls<br />

provide the maximum no <strong>of</strong> nodes to be<br />

considered for ESF redundant<br />

connectivity.<br />

Internet at SEOC/DEOC/TEOC is required<br />

in shared network, we understand that a<br />

shared internet is required at all remote<br />

locations thru the 8 Mbps internet<br />

connectivity at SEOC using the MPLSLAN.<br />

Also there is a contradiction to the above<br />

understanding, which ask for DSL / ADSL<br />

modems and separate internet connection<br />

locally. Pls refer Cl 2.7 Pg <strong>No</strong> 97<br />

Please bring clarity on internet<br />

requirement & amend the <strong>RFP</strong> clauses<br />

accordingly<br />

This is a part <strong>of</strong> solution design<br />

and bidder will have to<br />

undertake a survey for that.<br />

1) MPLS LAN is back-up to<br />

GSWAN for voice, data and<br />

videoconferncing connectivity<br />

and not for distribution <strong>of</strong><br />

Internet<br />

2) Internet at SEOC and remote<br />

locations is for access to<br />

Internet and also to act as last<br />

back-up to other network<br />

resources


4<br />

Page<br />

<strong>10</strong>2 &<br />

Page<br />

<strong>10</strong>9<br />

5 Page<br />

254<br />

1.3.3<br />

SEOC<br />

connecti<br />

vity and<br />

facilities<br />

&<br />

1.6<br />

Taluka<br />

EOC<br />

SCHEDUL<br />

E XII<br />

DELIVER<br />

ABLES<br />

Annex I –<br />

Technical<br />

requirements at<br />

Emergency<br />

Operation Centers<br />

Facilities<br />

SERVICE<br />

AGREEMENT<br />

1.3) TEOC will be connected<br />

with SEOC using<br />

GSWAN, MPLS-VPN,<br />

Broadband Internet and public<br />

telephone (including cell<br />

phone) networks.<br />

1.6) Selected TEOC sites will<br />

be connected with respective<br />

DEOC using MPLS-VPN leased<br />

from<br />

licensed telecom service<br />

operator.<br />

MPLS-VPN <strong>of</strong> required capacity<br />

is to be provided at<br />

SEOC, DEOC and ERC locations<br />

Connectivity <strong>of</strong> TEOC with SEOC is not<br />

clear. In Section 1.3.3 it is mentioned that<br />

TEOC will connect to SEOC via GSWAN,<br />

MPLS-VPN ,Broadband Internet and<br />

public telephone (including cell phone)<br />

networks but in Section 1.6 it is<br />

mentioned that TEOC will be connected to<br />

respective DEOC using GSWAN, MPLS-VPN<br />

In DELIVERABLE under Schedule XIII it is<br />

mentioned MPLS-VPN <strong>of</strong> required capacity<br />

is to be provided at SEOC, DEOC and ERC<br />

locations but Sections 1.3.3 and 1.6<br />

mentions MPLS-VPN at TEOC as well?<br />

Refer revised <strong>RFP</strong><br />

MPLS-VPN <strong>of</strong> required capacity<br />

is to be provided at<br />

SEOC, DEOC, TEOC and ERC<br />

locations


6<br />

7<br />

95 2.6<br />

97 2.7<br />

GSWAN backbone will be used<br />

for inter and intra organizational<br />

day-to-day operations with<br />

VSAT network as fallback<br />

communication backbone<br />

available 24*7. The network<br />

design would permit direct<br />

interface with MPLS-VPN based<br />

on public telecom service<br />

provider’s network to meet<br />

situation where GSDMA may<br />

decided to isolate GSDR-ICTS<br />

services from GSWAN backbone.<br />

The MPLS VPN is planned as<br />

fallback network for GSWAN<br />

(MPLS-VPN should interconnect<br />

SEOC (1), DEOCs (26), TEOCs<br />

(29) and ERCs (5). Links between<br />

SEOC and DEOCs should be <strong>of</strong> 1<br />

Mbps rate and between DEOCs<br />

and respective TEOCs and ERC at<br />

128 Kbps rate. MPLS-VPN is also<br />

required where GSWAN<br />

connectivity doesn't exist (at<br />

TEOC, ESF dept.).<br />

MPLS-VPN is required where<br />

GSWAN connectivity doesn't<br />

exist. Such locations would not<br />

be more than 20 and the<br />

connectivity is required at 128<br />

KBPS<br />

We understand GSWAN will be the main<br />

connectivity, and second level <strong>of</strong><br />

connectivity will be thru MPLS-VPN and<br />

third level <strong>of</strong> connectivity will be<br />

facilitated by VSAT.<br />

As the highlighted statements contradict,<br />

hence we would request you to clarify the<br />

understanding.<br />

Can you pls provide the location where<br />

GSWAN connectivity is not available, is it<br />

DEOC / TEOC/ ERC?<br />

Assumption is correct. MPLS will<br />

be back-up for GSWAN..<br />

Refer revised <strong>RFP</strong>.


8<br />

General<br />

Please let us know about backup and data<br />

retaintion policies to seize storage<br />

The backup policy demands<br />

daily incremental backup and<br />

weekly full back up . The<br />

retention policy shall be<br />

informed to the selected bidder<br />

9<br />

263 SCHEDULE XIII<br />

DELIVERABLES/<strong>No</strong>te<br />

Telephone lines at DEOC, TEOC<br />

and ERCs<br />

Co lines will be provided at DEOC, TEOC&<br />

ERC. Pl specify no.<br />

GSDMA will provide the<br />

telephone lines<br />

<strong>10</strong><br />

43 Clause<br />

<strong>No</strong>. 3.2.2<br />

Detailed Technical<br />

Criteria<br />

2) BOOT experience in IT<br />

Network<br />

projects<br />

3) Network Operations Centre<br />

experience - (Mission Critical,<br />

WAN, LAN, Security, managing<br />

E-mail services, Internet services<br />

etc., for 24x7 operations) in<br />

Projects with over <strong>10</strong>0 WAN<br />

node<br />

<strong>No</strong>rmally both are complementary for<br />

each other, means all BOOT based<br />

NETWORK PROJECTs would necessarily<br />

have NOC, secondly the experience <strong>of</strong><br />

project under BOOT / BOOM / BOO should<br />

be allowed for any / all IT projects, if has<br />

multi-locational<br />

execution.<br />

Hence request GSDMA to kindly ament<br />

the requirement as,<br />

BOOT / BOOM / BOO/BOT<br />

experience in any IT projects,<br />

Network<br />

1) BOOT / BOOM / BOO experience in any<br />

IT projects, having multi-locational<br />

execution.<br />

2) Network Operations Centre experience<br />

(Mission Critical, WAN, LAN, Security,<br />

managing E-mail services, Internet<br />

services etc., for 24x7 operations )


11<br />

42 3.2.1<br />

(3D)<br />

<strong>RFP</strong>, Sec-2 - ITB<br />

The bidder must have<br />

experience <strong>of</strong> implementing at<br />

least one project related to:<br />

Emergency Operations Centre or<br />

Network Operations Centre<br />

experience Mission Critical,<br />

WAN, LAN, Security, managing<br />

E-mail services, Internet services<br />

etc., for 24x7 operations ) in<br />

Projects with over 50 WAN<br />

nodes for Defence or Finance<br />

organization<br />

Following modification is requested:<br />

A. The bidder must have experience <strong>of</strong><br />

implementing at least one project related to:<br />

Emergency Operations Centre or Network<br />

Operations Centre experience Mission<br />

Critical, WAN, LAN, Security, managing E-<br />

mail services, Internet services etc., for 24x7<br />

operations ) in Projects with over 50 WAN<br />

nodes for a Government/PSU or any<br />

government organization anywhere in the<br />

world.<br />

B. The work order for Emergency Operation<br />

Center/Defence Center etc are covered<br />

under <strong>No</strong>n Disclosure Agreement <strong>of</strong> the<br />

client. It is requested that a duly authorised<br />

certificate from the client shall also be<br />

considered.<br />

A. The bidder must have<br />

experience <strong>of</strong> implementing at<br />

least one project related to:<br />

Emergency Operations Centre or<br />

Network Operations Centre<br />

experience Mission Critical,<br />

WAN, LAN, Security, managing<br />

E-mail services, Internet services<br />

etc., for 24x7 operations ) in<br />

Projects with over 50 WAN<br />

nodes for Defence/Finance<br />

organization/Central or <strong>State</strong><br />

Government<br />

B. Accepted<br />

12<br />

13<br />

219<br />

General<br />

SCHEDULE II<br />

EXIT<br />

MANAGEMENT<br />

SCHEDULE<br />

Substitution Clause and<br />

Substitution Agreement<br />

It is requested to include the Substitution<br />

Clause and Substitution Agreement. It is<br />

essential to do so for ensuring the<br />

financing by Lenders.<br />

SLA should not be applicable during exit<br />

management period.<br />

<strong>No</strong> Change<br />

As per <strong>RFP</strong>


14<br />

220 1.2<br />

15 New<br />

addition<br />

16<br />

41 Clause 2a<br />

1.2 Transfer <strong>of</strong><br />

Assets<br />

Fixed Term<br />

Contract<br />

Pre qualification<br />

Criteria<br />

If GSDMA exercises the option<br />

to purchase the s<strong>of</strong>tware for<br />

operating the hardware and<br />

systems, GSDMA shall pay to the<br />

Operator on the Transfer Date<br />

for transfer <strong>of</strong> such s<strong>of</strong>tware for<br />

operating the hardware and<br />

systems, such sum in<br />

accordance with Schedule VI. If<br />

GSDMA exercises the option to<br />

purchase Proprietary S<strong>of</strong>tware,<br />

the Proprietary S<strong>of</strong>tware shall<br />

be licensed to GSDMA in<br />

accordance with the Schedule VI<br />

and Schedule VIII.<br />

<strong>No</strong> termination right for Vendor<br />

The Bidder should have a<br />

minimum average turnover <strong>of</strong><br />

INR 200 Crores for the last five<br />

financial years from all its<br />

businesses and a minimum<br />

average turnover <strong>of</strong> INR 80<br />

Crores for the last five financial<br />

years from all its IT<br />

infrastructure services<br />

businesses.<br />

GSDMA will make the payment <strong>of</strong> all<br />

unpaid amount against the asset on the<br />

date <strong>of</strong> transfer <strong>of</strong> asset based on the<br />

capex and Opex<br />

Plz add: The vendor will have the right ot<br />

terminate in case the customer defaulted<br />

the payment for concecutive two qtrs.In<br />

case <strong>of</strong> termination Bidder request<br />

payment for all the Hardware /S<strong>of</strong>tware<br />

Licences delivered and services rendered<br />

till that day along with Hardware orders<br />

especially for this project and in Transit<br />

The Bidder should have a minimum<br />

average turnover <strong>of</strong> INR 200 Crores for the<br />

last five financial years from all its<br />

businesses and a minimum average<br />

turnover <strong>of</strong> INR 80 Crores for the last five<br />

financial years from all its IT/ITES/IT<br />

infrastructure services businesses.<br />

<strong>No</strong> Change<br />

Please refer Clause 7.3 (ii)<br />

(General Rules)<br />

<strong>No</strong> Change


17<br />

18<br />

198<br />

199<br />

Service<br />

Agreement,<br />

Clause 6.4 (c),<br />

Page 198<br />

Service<br />

Agreement,<br />

Clause 6.4 (d),<br />

Page 199<br />

....However the Operator shall<br />

be eligible to seek relief based<br />

on declared Force Majeure<br />

conditions during<br />

Implementation Phase and not<br />

during Operations &<br />

Maintenance Phase....<br />

Force Majeure -<br />

Implementation Phase<br />

If the event <strong>of</strong> Force Majeure<br />

occurs prior to commencement<br />

<strong>of</strong> operations and maintenance<br />

and continues for a period in<br />

excess <strong>of</strong> ten days, then GSDMA<br />

will grant a period <strong>of</strong> 7 days to<br />

the Operator to resume normal<br />

activities under this Agreement.<br />

In case the default continues,<br />

then GSDMA may discuss the<br />

issue with the Operator and<br />

revise the existing timelines for<br />

the Project. If the Operator does<br />

not complete the<br />

Implementation Phase in<br />

accordance with the revised<br />

timelines, GSDMA shall have the<br />

option to invoke the<br />

Implementation Phase<br />

Performance Guarantee and/or<br />

terminate this Agreement.<br />

As no private company is equipped<br />

enough to deal with wars, terrorist<br />

attacks, military operations, riots,<br />

sabotage and acts <strong>of</strong> Government or other<br />

competent authority, it is requested to<br />

grant relief to the Operator based on<br />

declared Force Majeure conditions during<br />

Operations & Maintenance Phase in such<br />

cases as well. Further, it is requested that<br />

GSDMA provides the required protection<br />

to the Project in such cases.<br />

1. In case <strong>of</strong> Force Majeure for a period in<br />

excess <strong>of</strong> ten days, the period granted by<br />

GSDMA to the Operator should be equal<br />

to the number <strong>of</strong> days <strong>of</strong> Force Majeure.<br />

2. In case <strong>of</strong> continued Force Majeure for<br />

a certain specified number <strong>of</strong> days, the<br />

right to terminate the Agreement should<br />

be with both the parties and GSDMA<br />

should not invoke the Implementation<br />

Phase Performance Guarantee. Also, in<br />

such a case, the non-compliance <strong>of</strong> the<br />

timelines / obligations by the Operator<br />

should not be treated as a default.<br />

<strong>No</strong> Change<br />

<strong>No</strong> change


19<br />

199<br />

Service<br />

Agreement,<br />

Clause 6.4 (d),<br />

Page 199<br />

Force Majeure -<br />

Operation & Maintenance Phase<br />

.......In case the default is due to<br />

extreme geographical conditions<br />

preventing physical access to<br />

damages inflicted area <strong>of</strong> the<br />

GSDR-ICTS Project, GSDMA may<br />

review such incidents on case-to<br />

case basis for wavier <strong>of</strong><br />

penalties giving more time to<br />

the Operator for rectifying the<br />

situation. In case <strong>of</strong> non fixation<br />

<strong>of</strong> mutually agreeable date<br />

attributable to any <strong>of</strong> the<br />

parties, the Evaluation<br />

Committee shall decide the<br />

date......<br />

It is requested that besides extreme<br />

geographical conditions, GSDMA should<br />

also consider the waiver in case <strong>of</strong> serious<br />

damage to the Project due to war,<br />

terrorist activities, military operations,<br />

riots and acts <strong>of</strong> Government or other<br />

competent authority.<br />

“In case the default is due to<br />

extreme geographical<br />

conditions/war/riots/terrorist<br />

activities/military operations<br />

preventing physical access to<br />

damages inflicted area <strong>of</strong> the<br />

GSDR-ICTS Project, GSDMA<br />

may review such incidents on<br />

case-to case basis for wavier<br />

<strong>of</strong> penalties giving more time<br />

to the Operator for rectifying<br />

the situation “


20 203-<br />

204<br />

Service<br />

Agreement,<br />

Clause 7.2, Pages<br />

203, 204<br />

.....The payment <strong>of</strong> 50% <strong>of</strong> QGR<br />

shall be made within 15 days <strong>of</strong><br />

quarter ending subject to the<br />

condition that an invoice is<br />

raised by the Operator within 2<br />

days <strong>of</strong> quarter ending. Any<br />

payment over & above 50% <strong>of</strong><br />

QGR to which the Operator is<br />

entitled shall be paid after the<br />

penalty is calculated by the<br />

designated <strong>of</strong>ficial / agency<br />

(“Third Party Agency”). The<br />

remaining payment out <strong>of</strong> QGR<br />

(after deducting the penalties)<br />

shall be made within 15 days<br />

from the date <strong>of</strong> response by<br />

the Operator to the notice<br />

issued by GSDMA as mentioned<br />

hereinafter, provided the<br />

Operator immediately responds<br />

to the notice issued by<br />

GSDMA.............the Operator<br />

shall have 15 days from the date<br />

<strong>of</strong> receipt <strong>of</strong> such notice to<br />

respond..............In the event<br />

that the Total Average<br />

Percentage Uptime for the<br />

network and Services falls below<br />

95 % in a given month, the<br />

Operator would be served a<br />

notice for improvement <strong>of</strong> the<br />

Services during the next 2<br />

months or face termination <strong>of</strong><br />

Agreement........<br />

There are three possibilities: The Operator<br />

may be eligible for Zero Penalty, Some<br />

Penalty and the third possibility may be <strong>of</strong><br />

Uptime less than 95%. It is requested that<br />

the Operator must be paid <strong>10</strong>0% <strong>of</strong> QGR<br />

within 15 days <strong>of</strong> quarter ending in case <strong>of</strong><br />

Zero Penalty. While a time limit is given<br />

for the operator to respond to the notice,<br />

there is no time limit provided on the<br />

authority to issue the notice. This may<br />

delay the payments to the operator. It is<br />

requested to allow 7 days for issue <strong>of</strong> such<br />

notice.<br />

The notice shall be issued by<br />

GSDMA within 14 days <strong>of</strong><br />

quarter ending


21<br />

22<br />

23<br />

24<br />

25<br />

196 Page 196<br />

201 Page 201<br />

General<br />

General<br />

General<br />

6.3 Limitation <strong>of</strong> Liability<br />

a. There shall be no limitation <strong>of</strong><br />

liability in case <strong>of</strong> any damages<br />

for bodily injury (including<br />

death) and damage to real<br />

property and tangible personal<br />

property.<br />

6.7 INSURANCE<br />

(ii) Without prejudice to the<br />

provisions contained in Clause<br />

(i) above, the Operator shall,<br />

during the Operation and<br />

Maintenance Phase, procure<br />

and maintain insurance cover<br />

including but not limited to the<br />

following:<br />

(a) Loss, damage or destruction<br />

<strong>of</strong> the Assets, including assets<br />

handed over by GSDMA to the<br />

Operator, at replacement value;<br />

(b) comprehensive third party<br />

liability insurance including<br />

injury to or death <strong>of</strong> personnel<br />

<strong>of</strong> GSDMA or others who may<br />

enter the Premises;<br />

(c) the Operator’s general<br />

liability arising out <strong>of</strong> this<br />

Agreement;<br />

Limitation <strong>of</strong> liability should not exceed<br />

project scope valued as quoted in the<br />

commercial bid. Kindly confirm.<br />

Limitation <strong>of</strong> liability should not exceed<br />

project scope valued as quoted in the<br />

commercial bid. Kindly confirm.<br />

To assess Insurance cover amonunt<br />

correctly, details <strong>of</strong> GSDMA assets<br />

required whichc would be handed over to<br />

the selected operator. Since it has<br />

commercial impact on the impact, you are<br />

requested to share the details.<br />

Limitation <strong>of</strong> liability should not exceed<br />

project scope valued as quoted in the<br />

commercial bid. Kindly confirm.<br />

Limitation <strong>of</strong> liability should not exceed<br />

project scope valued as quoted in the<br />

commercial bid. Kindly confirm.<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change<br />

26<br />

General<br />

(d) liability to third parties for<br />

goods or property damage;<br />

Limitation <strong>of</strong> liability should not exceed<br />

project scope valued as quoted in the<br />

commercial bid. Kindly confirm.<br />

<strong>No</strong> Change


27<br />

28<br />

29<br />

30<br />

204<br />

General<br />

General<br />

Service<br />

Agreement,<br />

Clause 7.3 (i),<br />

Pages 204<br />

Service<br />

Agreement,<br />

Schedule II, Clause<br />

1.1 c(ii) and Clause<br />

1.2 b(ii), Pages<br />

219, 220<br />

(e) workmen’s compensation<br />

insurance; and<br />

(f) any other insurance that may<br />

be necessary to protect the<br />

Operator and its employees,<br />

including all Force Majeure<br />

Events that are insurable and<br />

not otherwise covered in items<br />

(a) to (e) above.<br />

In the event <strong>of</strong> breach <strong>of</strong> any<br />

other terms or conditions <strong>of</strong> this<br />

Agreement by the Operator,<br />

GSDMA shall provide the<br />

Operator 30 days to rectify or<br />

remedy the breach. In the event<br />

the Operator is unable to rectify<br />

or remedy the breach within the<br />

aforementioned period, GSDMA<br />

shall have the right to terminate<br />

this Agreement.<br />

Clause 1.1 c. Upon<br />

commencement <strong>of</strong> the Exit<br />

Management Period, the<br />

Operator shall........(ii) deliver<br />

forthwith the actual or<br />

constructive possession <strong>of</strong> the<br />

Assets, free and clear <strong>of</strong> all<br />

encumbrances;........... Clause<br />

1.2 b(ii). All risk and titles to the<br />

Assets to be transferred to<br />

GSDMA pursuant to this<br />

Schedule shall be transferred to<br />

GSDR-ICTS Project, on the<br />

Transfer Date.<br />

Limitation <strong>of</strong> liability should not exceed<br />

project scope valued as quoted in the<br />

commercial bid. Kindly confirm.<br />

Limitation <strong>of</strong> liability should not exceed<br />

project scope valued as quoted in the<br />

commercial bid. Kindly confirm.<br />

It is requested to revise this clause by<br />

adding the phrase "Subject to the<br />

Provisions <strong>of</strong> Force Majeure".<br />

As all the risks and titles are to be<br />

transferred to GSDMA on the Transfer<br />

Date only, the actual or constructive<br />

possession <strong>of</strong> the assets may also be<br />

deferred to the Transfer Date.<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change.<br />

<strong>No</strong> Change


31<br />

32<br />

General<br />

7 Disclaimer<br />

The assumptions, assessments,<br />

statements and information<br />

contained in this <strong>RFP</strong>, may not<br />

be complete, accurate and<br />

adequate. Each Bidder should,<br />

therefore, conduct its own<br />

investigations and analysis and<br />

should check the accuracy,<br />

adequacy, correctness,<br />

reliability and completeness <strong>of</strong><br />

the assumptions, assessments<br />

and information contained in<br />

this <strong>RFP</strong> and obtain independent<br />

advice from appropriate<br />

sources.<br />

As this is a typical PPP project, it is<br />

requested to adopt the standard clauses<br />

from the model documents prepared for<br />

PPP projects.<br />

a) The requirement <strong>of</strong> the client need to<br />

be clearly stated in the <strong>RFP</strong> by the client so<br />

that there is no ambiguity and all the<br />

bidders are on the same page. The client<br />

organisation issuing the <strong>RFP</strong> which is the<br />

legal document has to have the entire<br />

ownership <strong>of</strong> the data and information<br />

contained in the <strong>RFP</strong>. Hence, kindly<br />

remove this from the disclaimer.<br />

b) If bidder is to obtain independent<br />

advice then there may be varied advices<br />

and respective solutions. It is suggested<br />

that there should be one source to state<br />

the requirements so that all bidders are on<br />

the same page. Hence the <strong>RFP</strong> or the<br />

written answers to the pre-bid queries<br />

shared across all the vendors should be<br />

the only means <strong>of</strong> dissiminating any extra<br />

information. Hence the statement "Each<br />

Bidder should therefore conduct.....<br />

independent advice from appropriate<br />

sources" should be withdrawn. As per<br />

legal <strong>RFP</strong> processes the same is not<br />

allowed and the <strong>RFP</strong> should be<br />

comprehensive self contained and nonambiguous.<br />

<strong>No</strong> change<br />

<strong>No</strong> change


33<br />

34<br />

35<br />

36<br />

37<br />

7 Disclaimer<br />

7 Disclaimer<br />

30 2.5 (c )<br />

30 2.5.2<br />

32 2.8.2<br />

Information provided in this <strong>RFP</strong><br />

to the bidders …. GSDMA<br />

accepts no responsibility for the<br />

accurancy or otherwise for any<br />

interpretation or opinion on the<br />

law expressed herein.<br />

GSDMA, its employees and<br />

advisers make no representation<br />

… including the accuracy,<br />

adequacy, correctness… Bidding<br />

Process<br />

Acknowledgement by the<br />

bidder: Acknowledged and<br />

accepted the risk <strong>of</strong> inadequacy,<br />

error or mistake in the<br />

information provided in the <strong>RFP</strong><br />

…..GSDMA<br />

GSDMA Shall not be liable for<br />

any omission, mistake or error<br />

…. Data given by GSDMA<br />

GSDMA reserves the right not to<br />

respond to any questions ….<br />

Provide any clarification.<br />

The client needs to own the responsibility<br />

for the accuracy or otherwise for any<br />

interpretation or opinion on the law<br />

expressed herein.<br />

The client needs to own the responsibility<br />

for the accuracy, adequacy, correctness,<br />

reliability or completeness <strong>of</strong> the <strong>RFP</strong>.<br />

GSDMA needs to own the responsibility <strong>of</strong><br />

the adequacy <strong>of</strong> the information. Thus the<br />

clause (c ) needs to be deleted and other<br />

clauses <strong>of</strong> 2.5 need to be reworded.<br />

GSDMA must take overall responsibility <strong>of</strong><br />

the information provided in the <strong>RFP</strong> as the<br />

responses shall be made as per contents<br />

<strong>of</strong> this <strong>RFP</strong>. This shall lead to fair<br />

evaluation <strong>of</strong> the bidders. Thus, thie<br />

clause needs to be deleted.<br />

The answers to queries are needed to<br />

arrive at the solution. Thus, this clause<br />

needs to be deleted.<br />

<strong>No</strong> change<br />

<strong>No</strong> change<br />

<strong>No</strong> change<br />

<strong>No</strong> change<br />

<strong>No</strong> change. However GSDMA<br />

will ensure that all reasonable<br />

queries are answered to best <strong>of</strong><br />

its ability and within reasonable<br />

time


38<br />

198<br />

Service<br />

Agreement,<br />

Clause 6.4 (c),<br />

Page 198<br />

....However the Operator shall<br />

be eligible to seek relief based<br />

on declared Force Majeure<br />

conditions during<br />

Implementation Phase and not<br />

during Operations &<br />

Maintenance Phase....<br />

As no private company is equipped<br />

enough to deal with wars, terrorist<br />

attacks, military operations, riots,<br />

sabotage and acts <strong>of</strong> Government or other<br />

competent authority, it is requested to<br />

grant relief to the Operator based on<br />

declared Force Majeure conditions during<br />

Operations & Maintenance Phase in such<br />

cases as well. Further, it is requested that<br />

GSDMA provides the required protection<br />

to the Project in such cases.<br />

<strong>No</strong> Change<br />

39<br />

36 2.14.5<br />

2.14.5 Forfeiture<br />

<strong>of</strong> Bid Security<br />

The Bid Security can be forfeited<br />

if a Bidder:<br />

a. Withdraws its Bid during the<br />

period <strong>of</strong> bid validity;<br />

b. Having been notified <strong>of</strong> the<br />

acceptance <strong>of</strong> its Bid by GSDMA<br />

during the period <strong>of</strong> bid validity:<br />

c. fails or refuses to execute the<br />

Service Agreement;<br />

d. fails or refuses to furnish the<br />

Performance Security, in<br />

accordance with the bid<br />

requirement;<br />

e. engages in any <strong>of</strong> the<br />

Prohibited Practices specified in<br />

Section 4 <strong>of</strong> the <strong>RFP</strong>; or<br />

f. is found to have Conflict <strong>of</strong><br />

Interest as specified in Clause<br />

2.2.1<br />

failure to sign the contract due to nonacceptance<br />

by customer <strong>of</strong> deviations<br />

submitted by bidder should not be a<br />

ground under this section.<br />

<strong>No</strong> Change


40<br />

41<br />

42<br />

39 2.2<br />

49 5.3<br />

240<br />

SCHEDUL<br />

E VIII<br />

2.20 Execution <strong>of</strong><br />

Service<br />

Agreement<br />

Section – 5:<br />

Miscellaneous<br />

SOFTWARE<br />

LICENSE TERMS<br />

(Proprietary<br />

S<strong>of</strong>tware)<br />

2.20.1 After acknowledgement<br />

<strong>of</strong> the LOA as aforesaid by the<br />

Selected Bidder, it shall execute<br />

the Service Agreement within<br />

the period prescribed in Clause<br />

1.3.6. The Selected Bidder shall<br />

not be entitled to seek any<br />

deviation in the Service<br />

Agreement<br />

5.3 It shall be deemed that by<br />

submitting the Proposal, the<br />

Bidder agrees and releases the<br />

GSDMA, its employees, agents<br />

and advisers, irrevocably,<br />

unconditionally, fully and finally<br />

from any and all liability for<br />

claims, losses, damages, costs,<br />

expenses or liabilities in any way<br />

related to or arising from the<br />

exercise <strong>of</strong> any rights and/or<br />

performance <strong>of</strong> any obligations<br />

hereunder, pursuant hereto<br />

and/or in connection herewith<br />

and waives any and all rights<br />

and/or claims it may have in this<br />

respect, whether actual or<br />

contingent, whether present or<br />

future.<br />

Ref clause<br />

Except for the deviations which have been<br />

submitted by bidder along with its bid in<br />

Annex V – Deviations from Bid Terms &<br />

Conditions.<br />

Seek deletion as this is against principles<br />

<strong>of</strong> natural justice, we have undertaken<br />

that for the selection process we are<br />

giving up our right to challenge any<br />

decision <strong>of</strong> GSDMA, however, same can<br />

not be the case once the contract / project<br />

is awarded.<br />

the Proprietary s<strong>of</strong>tware will be licensed<br />

as per EULA terms <strong>of</strong> the owner <strong>of</strong><br />

s<strong>of</strong>tware.<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change


43<br />

179 2.4 2.4 Approvals<br />

c. GSDMA shall use reasonable<br />

endeavors to assist the Operator<br />

in obtaining such Approvals. In<br />

the event that any Approval is<br />

not obtained, the Operator and<br />

GSDMA shall co-operate with<br />

each other in achieving a<br />

reasonable alternative<br />

arrangement as soon as<br />

reasonably practicable, for the<br />

Operator, to continue to process<br />

its work with as minimal<br />

interruption to its business<br />

operations as is commercially<br />

reasonable until such Approval<br />

is obtained, provided that the<br />

Operator shall not be relieved <strong>of</strong><br />

its obligations to provide the<br />

Services and to achieve the<br />

Service levels until such<br />

Approvals are obtained, if and to<br />

the extent that the Operator's<br />

obligations are dependent upon<br />

such Approvals.<br />

c. GSDMA shall use reasonable endeavors<br />

to assist the Operator in obtaining such<br />

Approvals. In the event that any Approval<br />

is not obtained, the Operator and GSDMA<br />

shall co-operate with each other in<br />

achieving a reasonable alternative<br />

arrangement as soon as reasonably<br />

practicable, for the Operator, to continue<br />

to process its work with as minimal<br />

interruption to its business operations as<br />

is commercially reasonable until such<br />

Approval is obtained, provided that the<br />

Operator shall not be relieved <strong>of</strong> its<br />

obligations to provide the Services and to<br />

achieve the Service levels until such<br />

Approvals are obtained, if and to the<br />

extent that the Operator's obligations are<br />

independent <strong>of</strong> such Approvals.<br />

<strong>No</strong> Change


44<br />

190 5.1<br />

5.1 Intellectual<br />

Property Rights<br />

k. All right, title and interest in<br />

and to, and ownership in,<br />

Proprietary Information <strong>of</strong><br />

Operator, which is provided to<br />

GSDMA, and all modifications,<br />

enhancements and other<br />

derivative works <strong>of</strong> such<br />

Operator Proprietary<br />

Information (“Operator<br />

Proprietary Information”), shall<br />

remain solely with Operator.<br />

The Operator shall, within 30<br />

days <strong>of</strong> the<br />

Effective Date, provide to<br />

GSDMA the status <strong>of</strong> all the<br />

Operator Proprietary<br />

Information<br />

along with documentary support<br />

sufficient to establish its sole<br />

legal rights in the aforesaid<br />

Proprietary Information. This<br />

Operator Proprietary<br />

Information shall refer to the<br />

Proprietary<br />

Information that has been<br />

owned by the Operator prior to<br />

the Effective Date.<br />

Seek deletion <strong>of</strong>:<br />

The Operator shall, within 30 days <strong>of</strong> the<br />

Effective Date, provide to GSDMA the<br />

status <strong>of</strong> all the Operator Proprietary<br />

Information along with documentary<br />

support sufficient to establish its sole legal<br />

rights in the aforesaid Proprietary<br />

Information. This Operator Proprietary<br />

Information shall refer to the Proprietary<br />

Information that has been owned by the<br />

Operator prior to the Effective Date.<br />

<strong>No</strong> Change


a. There shall be no limitation <strong>of</strong><br />

liability in case <strong>of</strong> any damages<br />

for bodily injury (including<br />

death) and damage to real<br />

property and tangible personal<br />

property.<br />

b. This Agreement does not<br />

grant or create any rights,<br />

benefits, claims, obligations or<br />

causes <strong>of</strong> action in, to or on<br />

behalf <strong>of</strong> any person or entity<br />

(including any third party) other<br />

than between the respective<br />

Parties to this Agreement.<br />

c. The Operator recognizes and<br />

acknowledges that the Services<br />

to be provided by it under this<br />

Agreement are not replicable<br />

and/or are specific to the<br />

Operator. Accordingly, the<br />

Operator acknowledges that in<br />

the event <strong>of</strong> a breach <strong>of</strong> this<br />

Agreement by it, compensation<br />

by way <strong>of</strong> damages will not be<br />

an adequate remedy for GSDMA<br />

and accordingly, GSDMA shall be<br />

entitled to seek and enforce<br />

specific performance <strong>of</strong> this<br />

Agreement.<br />

d. The Operator shall also be<br />

liable for damages caused due<br />

to breach by the Operator <strong>of</strong> its<br />

obligations under this<br />

Agreement other than as stated<br />

in Article 6.3 (a). However, the<br />

aggregate liability <strong>of</strong> the<br />

Operator for damages caused<br />

due to breach by Operator <strong>of</strong> its<br />

Seek deletion <strong>of</strong> point C.<br />

Seek deletion <strong>of</strong> following in point D:<br />

It is hereby clarified that in the event this<br />

Agreement is terminated by GSDMA for<br />

breach by Operator <strong>of</strong> its obligations<br />

under this Agreement, the Operator shall<br />

be liable to make payment <strong>of</strong> the penalty<br />

as specified above. In such an event


46<br />

47<br />

193 5.1<br />

189 i<br />

5.2 Intellectual<br />

Property Right<br />

(m)<br />

5.1 Intellectual<br />

Property Rights<br />

Upon the expiration or any<br />

termination <strong>of</strong> this Agreement,<br />

Operator shall undertake the<br />

actions set forth below in this<br />

Article to assist GSDMA to<br />

procure replacement services<br />

equivalent to Services provided<br />

hereunder.<br />

i) the license in the third party<br />

s<strong>of</strong>tware shall automatically be<br />

deemed to have been assigned<br />

in favour <strong>of</strong> GSDMA or its<br />

nominee. GSDMA shall be<br />

required only to intimate the<br />

licensor the name <strong>of</strong> the<br />

assignee, if applicable, and the<br />

date from which the assignment<br />

<strong>of</strong> the license shall be deemed<br />

to have taken effect. For the<br />

avoidance <strong>of</strong> doubt, this<br />

intimation shall not be<br />

construed as a condition to the<br />

assignment <strong>of</strong> the license<br />

Bidder will assit in procurement but not<br />

financially liable.<br />

GSDMA will have to sign the Assignment<br />

agreement/ agremeent <strong>of</strong> similar terms<br />

and conditions to take the s<strong>of</strong>tware on its<br />

own name with terms and conditions to<br />

be agreed between the contracting<br />

parties.<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change


48<br />

49<br />

189<br />

205 7.4<br />

5.1 Intellectual<br />

Property Rights<br />

7.4 Consequences<br />

<strong>of</strong> Termination<br />

The Operator shall procure, no<br />

later than the Implementation<br />

Phase Completion Date, from<br />

each <strong>of</strong> the third party owners<br />

<strong>of</strong> Proprietary S<strong>of</strong>tware, a<br />

confirmation letter in the form<br />

annexed hereto as Schedule<br />

XVII. For avoidance <strong>of</strong> doubt,<br />

obtaining such confirmation<br />

letters from each <strong>of</strong> the third<br />

party owner <strong>of</strong> Proprietary<br />

S<strong>of</strong>tware shall be a condition to<br />

achieving Implementation Phase<br />

Completion Date.<br />

The revised clause reads as<br />

follows:<br />

d. <strong>No</strong>twithstanding any other<br />

provision contained in this<br />

Agreement to the contrary, in<br />

the event <strong>of</strong> termination <strong>of</strong> this<br />

Agreement in the circumstances<br />

described in Clause 7.3(iv) no<br />

compensation shall be payable<br />

to the Operator, provided that<br />

such termination shall not<br />

prejudice or affect any other<br />

right <strong>of</strong> action or remedy which<br />

may have accrued or shall<br />

accrue thereafter to GSDMA.<br />

obligation would be on best effort basis<br />

only. otherwise we will asist GDMSA to get<br />

a similar agreement signed as detaied<br />

above. this should not be a condition to<br />

achieving Implementation Phase<br />

Completion Date.<br />

In case <strong>of</strong> such termination Bidder request<br />

payment for all the Hardware /S<strong>of</strong>tware<br />

Licences delivered and services rendered<br />

till that day along with Hardware orders<br />

especially for this project and in Transit<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change. Please refer<br />

Schedule II


50<br />

51<br />

206 7.6<br />

221 1.2<br />

7.6 (Fixed Term<br />

Contract)<br />

1.2 Transfer <strong>of</strong><br />

Assets<br />

The following clause has been<br />

inserted:<br />

The Operator recognizes and<br />

confirms that this Agreement is<br />

a fixed term contract and<br />

therefore, the Operator shall<br />

not be entitled to terminate this<br />

Agreement for any reason<br />

whatsoever, except for the<br />

reasons specifically provided for<br />

in this Agreement.<br />

iii. If GSDMA exercises the<br />

option to purchase the s<strong>of</strong>tware<br />

for operating the hardware and<br />

systems, GSDMA shall pay to the<br />

Operator on the Transfer Date<br />

for transfer <strong>of</strong> such s<strong>of</strong>tware for<br />

operating the hardware and<br />

systems, such sum in<br />

accordance with Schedule VI. If<br />

GSDMA exercises the option to<br />

purchase Proprietary S<strong>of</strong>tware,<br />

the Proprietary S<strong>of</strong>tware shall<br />

be licensed to GSDMA in<br />

accordance with the Schedule VI<br />

and Schedule VIII.<br />

seek deletion<br />

Proprietary S<strong>of</strong>tware shall be lisenced to<br />

GDMSA as per the terms <strong>of</strong> the EULA/<br />

S<strong>of</strong>tware Lisence terms <strong>of</strong> the owners <strong>of</strong><br />

the Proprietary S<strong>of</strong>tware only.<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change


52 New<br />

clasue<br />

53 New<br />

clasue<br />

Deemed<br />

Acceptance<br />

SNR<br />

<strong>No</strong>t mentioned to be added<br />

<strong>No</strong>t mentioned to be added<br />

All Products/ services rendered hereunder<br />

shall be deemed accepted, if Customer<br />

does not provide a written notice <strong>of</strong> any<br />

rejection/confirmation <strong>of</strong> acceptance or<br />

when Customer uses the<br />

Product/deliverable in its business,<br />

whichever occurs earlier. In the event <strong>of</strong><br />

any rejected product/service, Bidder shall<br />

be given a 30 day period to correct the<br />

same.<br />

Customer hereby agrees to make the site<br />

ready as per the agreed specifications,<br />

within the agreed timelines. Customer<br />

agrees that Bidder shall not be in any<br />

manner be liable for any delay arising out<br />

<strong>of</strong> Customer's failure to make the site<br />

ready within the stipulated period,<br />

including but not limited to levy <strong>of</strong><br />

liquidated damages for any delay in<br />

performance <strong>of</strong> Services under the terms<br />

<strong>of</strong> this Contract. Further any idle time<br />

resulted due to non available <strong>of</strong> site or<br />

infrastructure or data, Customer shall<br />

make payment to Bidder for the same.<br />

<strong>No</strong> Change<br />

<strong>No</strong> Change<br />

R Bannerji<br />

CEO, GSDMA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!