e from 01.04.2008 to31.03.2013suitablydate of the financial year.10 Page 22Section IITerms andconditions ofcontractClause 7PaymentTerms11 Page 34.QualificationCriteria (i)The payment shall be made tothe Supplier as under: (a)Advance Payment: Ten (10)percent of the contract priceshall be paid within thirty (30)days of signing of the contractand upon submission of claimand a bank guarantee forequivalent amount valid untilthe vehicles and equipment aredelivered and in the formprovided in the biddingdocument or another formacceptable to the Purchaser.(This bank guarantee is a secondbank guarantee in addition tothe Bank Guarantee for SecurityDeposit) (b) On Shipment:Eighty (80) percent of thecontract price of the goodsshipped shall be paid throughirrevocable confirmed letter ofcredit opened in favor of thesupplier in a bank in its country,upon submission of documentsas mentioned in Clause 21 ofSection II of the <strong>Tender</strong>document (c) On Acceptance:Ten (10) percent of the contractprice of goods received shall bepaid within thirty (30) days ofreceipt of the goods uponsubmission of claim supportedby the acceptance certificateissued by the Purchaser.The bidders should be amanufacturer or authorizeddealer, who have designed,manufactured, and tested atleast 12 equipments similar tothe type specified in the'Technical Specification' in thelast 5 financial years. Thebidders are also required tosubmit the performancecertificate of the contractsexecutedThe price bid should be in twoparts. One part would be the CIFPrices to be quoted by the OEM inforeign curreny for which thetendered payment terms shallapply. The other part shall be thecost of Inland Transportation, C &F charges at the port and othermisc. Charges that may beapplicable at the time of bringingthe vehicle from port to finaldestination payable to the IndianAuthorized Representative inINDIAN RUPEES. Since Importduties and taxes vary on currencyexchange rate as well as the dutystructure fixed by the CentralGovt., the same should not beincluded in the scope of thebidder. Therefore the Import Duty,CVD and other statutory chargespayable by an importer shall bedirectly paid to the customsdepartment by GSDMAPlease confirm that 12 similartypes would include any unitsstarting from 32 meters upto 70meters.The requirement of 70 meter unitis much lesser compared to theunits of lesser heights. Therefore12 supply references of 70 metershall be difficult to provide.If this condition is not accepted, itmay lead to a single vendorqualification which will not provideGSDMA with competitive biddingadvantage and therefore will be aloss of public money at large.The bidder will quote separate costfor vehicle i.e. CIF cost and cost inforeign currency for the otherservices in India to clear theconsignment from customs andPort. The payment shall be made inIndian Rupee to their agentequivalent to foreign currency theyhave quoted for this service. Therate of conversion shall be RBIreference rate on the last date ofsubmission of tenders.Refer query 7


extended up to 730 days for all theunits from the date of opening ofLC.


101112131415161718Page 36Clause 2.5Page 37Clause 3.2Page 37Clause 3.7Page 37Clause 3.11Page 38Clause 6.3Page 38 - 39Clause 6.5Page 41Clause 10.18Page 42Clause 12.3Page 49Clause 27.1(cage bottom) from the Ground and theHorizontal Working outreach shall not beless than 25 - 30 mtrsThe gearbox shall be fully automatictransmission type. (Allison)Height to working cage bottom : 68metersSWL with monitor in the cage Delivery upto 3500 LPM : 300 KgsMaximum C/C width of the vehicle whenJacks are fully extended on both sides :7.0 meters…there shall preferably a third boom withvertical movement of approx. 130degrees to enable a person climb downfrom the cage to the ladder on the secondboom.The first boom shall be able to elevate inthe range of approx. –3 degree to +85degree angleIn addition, the following controls shall beprovided on jack control panel: A fullfunctional cordless remote with a 100metres range to be provided for the allboom and water monitor movements,except for auto levelling system.The cage shall be designed for 500 Kgworking load and shall be tested with 25%dynamic overload.The system shall incorporate simple testscreens to enable testing of the workingcage and the turntable control panels.The tests shall also cover display unit,push buttons, joysticksthe Ground and the Horizontal workingoutreach with 500 Kg Cage Load shall not beless than 25 meters.Please remove “Allison” since Volvo andMercedes Benz may wish to provide their ownAutomatic Transmission Systems.Please confirm that the cage bottom height of68 meters shall be available with full safeworking load of 500 Kgs. No reduction inworking load from 500 Kgs shall be acceptablefor 68 meter cage bottom height when nomonitor is operatingWe request you to modify it to 150 Kgs.This may be modified to Max of 9.0 meters.Higher jacking spread is desired for a heavierunit in order to ensure stability at maximumheight.Since the 70 meter units do not have ladder,the words ”to enable a person climb downfrom the cage to the ladder on the secondboom” may please be deleted.Please modify it to 0 to +85 degrees providedall the other parameters are achieved.We do not understand why a very importantfeature such as ’Auto Levelling’ is to be left outof the Cordless Remote Control. Any reputedmanufacturer must be able to provide thisfeature on the cordless remote control.Out of all other functions, the Auto LevellingFunction is the utmost function that requires aCordless Remote Control. Hence the word’except for’ must be replaced with ’including’Please include “Under no circumstances –except when the monitor is operational –reduction in cage load capacity shall beallowed in the working envelope. i.e. the safeworking load of 500 Kgs when monitor is notrunning must be available even at 68 metercage bottom height (i.e. when all the boomsand jibs are fully extended)Vema Control Systems are 'SELF DIAGNOSTICFULL FEEDBACK' Systems. This means thatwhen a component like a Joystick, Push Buttonetc fails, the indication immediately is shownon the main display. Hence, our system doesnot require any test screens for testing of suchcomponents. Please confirm this is acceptable.shall not be less than68 mtrs (cage bottom)from the Ground andthe Horizontal Workingoutreach shall not beless than 25 - 30 mtrs“The gearbox should befully automatic typewith torque convertor”or Automated ManualTransmission (AMT)No change is required.No change is required.Maximum C/C width ofthe vehicle when Jacksare fully extended onboth sides : 8.0 metersThis clause is deleted.No ChangeNo ChangeThe testing of the cageshall be as perparameters specified inthe standards inDynamic and staticconditionsThe system shallincorporate simple testscreens to enabletesting of the workingcage and the turntablecontrol panels. Thetests shall also coverdisplay unit, push


19202122Bid Due Date 13 September 2013 This may be extended upto end September2013.Clause 1.9and 10.5Clause 2.5(Page 36)The Aerial Ladder Platform shall bedesigned for the operational stability andstructural strength based on the criterialaid in relevant EN 1777 and EN 280 andother related European norms andstandards applicable for elevated raisedplatforms used for Fire Fighting andrescue operations and the certificate tothat effect issued by the competentagency shall be enclosed with the tender.1.9 The Vehicle shall have a levelingsystem to adjust axial and transversemovement to an angle not less than 5degrees and it shall be in automatic innature, with an easy to switch full manualover-driving capabilities.10.5 The Jacking shall be able to level thevehicle up to 7 degree sideways and foreand aft with automatic leveling system.There shall be manual override system.The gearbox should be fully automatictypePlease note that for fire fighting and firerescue hydraulic platforms EN 1777 applies.The EN 280 is for normal aerial appliances andnot for fire fighting. This fact is mentioned inthe EN norms. Attached is an document fromthe EN standards.Please amend by deleting EN 280 wherevermentioned.There is a contradiction between the points1.9 (page 35) and 10.5 (page 41).It shall be 7 degrees?5 degThe I-Shift automated gear box would bebetter for the Volvo trucks in our opinion. It isa electronically controlled splitter and rangechangetransmission designed for automaticgear changing. There is no clutch required andserves the purpose of fully automatic.buttons, joysticks orsystem should showthe fault on display.The last date of bidsubmission has beenextended to September27, 2013The Aerial LadderPlatform shall bedesigned for theoperational stabilityand structural strengthbased on the criterialaid in relevant EN 1777and or other relatednorms and standardsapplicable for elevatedraised platforms usedfor Fire Fighting andrescue operations andthe certificate to thateffect issued by thecompetent agency shallbe enclosed with thetender.“The Jacking shall beable to level the vehicleup to 5 degreesideways and fore andaft with automaticleveling system. Thereshall be manualoverride system”“The gearbox should befully automatic typewith torque convertor”or Automated ManualTransmission (AMT)23Clause 3.11Page 37Maximum outrigger width mentioned is7.0 metersFully auto torqueIn F70 RPX this can have up to 8,0 m giving thesuperior outreach possibilities. Because of thevariable jacking according to our opinion thereis not any reason for restricting the maxoutrigger width. Anyhow, with this 7,0moutrigger width the required outreach isavailable in F70 RPX unit.Maximum outriggerwidth shall not be morethan 8.0 meters24Clause 6.3Page 38There shall be two or three booms: thefirst main boom with telescopicDo you have any objections to this?Please note that there is no ladder in this typeof hydraulic platform. So the ladder related“There shall be two orthree booms: the first


252627282930Clause 6.5Page 39Clause 10.3Page 40Clause 10.18Page 41Clause 11.3Page 42Clause 12.1Page 42Clause 12.9Page 43extensions providing direct movementand the other articulated boom withvertical movement of approx. 180degrees, there shall preferably a thirdboom with vertical movement of approx.130 degrees to enable a person climbdown from the cage to the ladder on thesecond boom. The other booms shallprovide an up-and-over capability ofapprox. 12.5 m throughout its verticalmovement.The first boom shall be able to elevate inthe range of approx. –3 degree to +85degree angle.Each wheel shall be provided with offgroundsensorsJack control panel :10.18.11 All boom movements and allmonitor movementsThe electronic system shall be approvedaccording to the valid standards anddirectives. The system shall be EMCtested (EU directive 89/336/EEC) and CEtype tested by appropriate agency.12.1 (Pg 42) The working cage shall befixed to the third articulated boom(optional), in such a way that there is asafe and easy way to and from the boomladders through an inward opening doorof the cage rear side. No climbing overthe cage railing will be allowed. Theworking cage should fully comply with thesafety requirement of EN1777 & EN 280.12.9 (Pg 43) : The dimensions of therescue platform shall be approx. 1.2 m x0.6 mportions are not relevant.The up and over capacity is 11,0 m. Pleaseamend.In F70 RPX this is 0 to 83 degree and all theperformance parameter are met. According toour opinion the range of the 1st boom shouldbe deleted or changed from 0 to 83 degrees.In Bronto F70 RPX, it is a built-in safetymechanism in the outrigger operation that ischecking that the wheels are off the groundand only then allowing the boom movements.The safety feature as required by you is therebut in a different way. Please accept andamend.Boom and monitor movements are notallowed from jack side control panel. Pleasedelete 10.18.11.okHere it has been referred to an old standard, itshould be 95/54/EC:1995 instead of89/336/EEC.Third boom need not be mentioned again andagain as it is two or three boom.There are no boom ladders.EN 280 does not apply.Bronto units the dimension are 1.36 x 0.5 m.Kindly amend.main boom withtelescopic extensionsproviding directmovement and theother articulated boomwith vertical movementof approx. 180 degrees,there shall preferably athird boom withvertical movement ofapprox. 130 degrees.The other booms shallprovide an up-and-overcapability of approx.12.5 m throughout itsvertical movement.”Approx mean +/- 10%No ChangeEach wheel shall beprovided with offgroundsensors or thejack legs shall haveground pressuresensors and systemshould not allow to liftthe booms unless thereis enough groundpressure on jacks andvehicle is correctlylevelled.No ChangePlease confirmChanged “The workingcage shall be fixed tothe boom. The workingcage should fullycomply with the safetyrequirement of EN1777or any other standardsas the case may be.The approx. dimensionsof the rescue platformshall not be less than1.25 m length X 0.5 mwidth.


3132Page 48 & 52An overload warning system shall befitted to give audible and visual warning incase of exceeding the safe working loadand boom movements shall be stopped.The system/ mechanism shall be manuallyoverridden by push button.FIRE PUMP AND RTP FOAMPROPORTIONING SYSTEMPortable Fire PumpIn the case of overload, the Bronto systemallows for only inward movements to allowsafely to retract.Please accept and amend.It is confusing that there is a requirement forthe mid ship mounted pump, 22 (page 48) andfor the portable pump, page 52. Usually it iseither or and very seldom these both arerequire. Please clarify if both or one areneeded.An overload warningsystem shall be fittedto give audible andvisual warning in caseof exceeding the safeworking load and boommovements shall bestopped and only allowretraction movementonly. The manuallyoverridden system/mechanism shallpreferably be providedfor tactical manoeuvresin case of extremeemergency.No Change33Clause 29.15Page 50Fixed colour video camera mounted atthe cage water monitor with its monitorintegrated in the provided colour display.Pg 53 : CCTV cameraPortable pump required29.15 requires fixed colour video camera andthen there is the requirement for CCTV camerasystem on the page 53.Please clarifyNo Change. Both arerequiredR BannerjiCEO, GSDMA